flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Design activity at architecture firms finally back to pre-recession levels: AIA report

Design activity at architecture firms finally back to pre-recession levels: AIA report

Gross billings at architecture firms have increased by 20% since 2011, according to AIA.


By AIA | October 6, 2014

As the U.S. construction industry continues to rebound from the downturn in the past economic cycle, "The Business of Architecture: 2014 AIA Firm Survey Report" shows that design activity at architecture firms has recovered to pre-recession levels.

Most firms have seen revenue levels at least stabilize, if not finally begin to grow with gross billings at architecture firms increasing by 20% from 2011.   

Key findings include:

  • With losses during the economic downturn, architecture firms have become smaller and younger with 43% having been founded since the year 2000, with one-third of those firms founded just since 2010.
  • Renovations of existing facilities account for a larger share of design activity than during the last construction boom.
  • Nearly two-thirds of large firms worked on international projects in 2013.
  • Over a third of architecture firms nationally—and virtually all larger firms—were using some form of BIM for billable projects.
  • Twelve percent of firms are using energy modeling software for billable projects.
  • Twenty-one percent of firms have worked on one or more projects that incorporate resilient design strategies.
  • Even with most of the institutional building category remaining in recession in 2013, this sector generated half of the billings at architecture firms.
  • Within the institutional category, education facilities accounted for 21% of overall billings.

The full survey is available for purchase here.

Related Stories

| Dec 20, 2011

Third annual Gingerbread Build-off winners announced

Nine awards were handed out acknowledging the most unique and creative gingerbread structures completed.

| Dec 20, 2011

BCA’s Best Practices in New Construction available online

This publicly available document is applicable to most building types and distills the long list of guidelines, and longer list of tasks, into easy-to-navigate activities that represent the ideal commissioning process.

| Dec 20, 2011

Aragon Construction leading build-out of foursquare office

The modern, minimalist build-out will have elements of the foursquare “badges” in different aspects of the space, using glass, steel, and vibrantly painted gypsum board.

| Dec 20, 2011

HOAR Construction opens Austin, Texas office

Major projects in central Texas spur firm’s growth.

| Dec 19, 2011

HGA renovates Rowing Center at Cornell University

Renovation provides state-of-the-art waterfront facility.

| Dec 19, 2011

Chicago’s Aqua Tower wins international design award

Aqua was named both regional and international winner of the International Property Award as Best Residential High-Rise Development.

| Dec 19, 2011

Summit Design+Build selected as GC for Chicago recon project

The 130,000 square foot building is being completely renovated.

| Dec 19, 2011

USGBC welcomes new board directors?

Board responsible for articulating and upholding the vision, values, mission of organization.

| Dec 19, 2011

Davis Construction breaks ground on new NIAID property

The new offices will total 490,998 square feet in a 10-story building with two wings of 25,000 square feet each. 

| Dec 19, 2011

Survey: Job growth driving demand for office and industrial real estate in Southern California

Annual USC Lusk Center for Real Estate forecast reveals signs of slow market recovery.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021