flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Design-build makes gains along with more authorizing legislation

Design-build makes gains along with more authorizing legislation

Design-build project delivery represented 40% of the nonresidential U.S. construction market in 2009.


By BD+C Staff | December 4, 2013

In 2009, more legislation authorizing design-build project delivery passed than in any year in Design-Build Institute of America’s history.

A study commissioned by DBIA revealed that design-build project delivery represented 40% of the nonresidential U.S. construction market in 2009, growing over 10% since 2005. In the same time period, use of the traditional design-bid-build delivery method fell 14%.

(http://www.dbia.org/about/Pages/DBIA-Milestone-Research-Confirms-Design-Build-Growth.aspx)

Related Stories

Codes and Standards | Mar 6, 2020

Design firms creating plans to re-imagine D.C.’s tidal basin

Area including National Mall is facing increased flood risk.

Codes and Standards | Feb 28, 2020

Bay Area communities struggle with what to do about rising sea level

Policies include sea walls, levies, and relocation.

Codes and Standards | Feb 27, 2020

Cell phones present a safety hazard at job sites

Use of ear buds, headphones banned by some contractors.

Codes and Standards | Feb 26, 2020

American Concrete Institute releases 2020 codes, specifications, and practices

ACI Collection features guidance on structural concrete construction and rehabilitation.

Codes and Standards | Feb 25, 2020

New ISO standard for optimizing building use and reusing and recycling components released

Aim is to realize full potential value of a building throughout its life cycle.

Codes and Standards | Feb 20, 2020

City-owned buildings to go carbon-free in Los Angeles

Mayor commits to goal for new and extensively renovated structures.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021