flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Developer will convert Dallas' storied LTV Building into mixed-use residential tower

Developer will convert Dallas' storied LTV Building into mixed-use residential tower

Completed in 1964, the 32-story tower once featured the world’s largest electronic signboard.


By HRI Properties | May 30, 2014
Led by Dallas Mayor Mike Rawlings, New Orleans-based HRI Properties will officially mark the launch of the LTV Building’s $80 million conversion into downtown Dallas’s first mixed-use hotel and residential complex.
 
New Orleans-based HRI Properties, LLC (HRI) recently completed the purchase of one of the most storied buildings in downtown Dallas and will convert it to an innovative mixed-use complex that will include a 171-room Hilton Garden Inn Hotel and 186 luxury apartments.
 
While multi-use residential conversions are still relatively rare in the U.S. outside of New York City, this will be the sixth such development by HRI. The company has converted similar projects in New Orleans,  Houston, Jackson, MS and Richmond, VA. Currently, HRI is also redeveloping the 225 Baronne Building in downtown New Orleans into a 188-room Aloft Hotel and 192 apartments.
 
“HRI Properties is a well respected developer out of New Orleans that has a successful track record in developing residential and hotel projects, and their plans for residential, hotel and retail will add greatly to the fun, vibrancy and quality of life creating a more urban environment Downtown,” said John Crawford, CEO of Downtown Dallas, Inc. 
 
“The redevelopment of 1600 Pacific is giving our downtown revitalization efforts another real boost and serves as yet another example of the importance of public/private partnerships to achieve mutual goals and objectives,” Crawford added.
 
“Today represents another accomplishment in our commitment to revitalize downtown,” Mayor Rawlings said. “This project will help attract more urban residents of all ages, incomes and backgrounds to downtown and continue to establish it as a vibrant neighborhood.”
 
The building, constructed in 1964, was known for many years as the LTV Building, headquarters of the former Ling-Temco-Vought company. The building’s façade created the world’s largest electronic signboard at the time. Thirty windows on each of the upper 25 floors were individually controlled and could be configured to shapes, letters and messages.
 
“In the thirty years since our founding, we have established a unique expertise in revitalizing urban centers through adaptive redevelopment of historic buildings,” said Tom Leonhard, CEO of HRI.  “Communities as varied as Richmond and Jackson have enthusiastically welcomed our capabilities in reviving their downtown centers, and we look forward to replicating that success in a major market like Dallas,” he said.
 
“The cooperation of local officials and partners is absolutely essential in a project of this nature,” said Leonhard. “This would not have come to a successful closing without the enthusiastic support from Mayor Rawlings, the City of Dallas Office of Economic Development, Downtown Dallas, Inc. and District 14 Councilmember Philip T. Kingston, who was instrumental in navigating the regulatory process for the conversion of this Dallas landmark into its new life as a multi-use complex,” Leonhard added.
 
The 32-story LTV Building is within walking distance to major downtown office buildings and the DART light rail. Residents will have exclusive access to 206 self-park parking spaces in the building on floors 2-4. The hotel will utilize 148 valet parking spaces in the basement of the LTV Building.
 
Construction is scheduled to be completed by third quarter 2015.
 
Architects for the project are HCI Architecture, Inc. and Merriman Associates/Architects, Inc. of Dallas. Interior design is by Looney & Associates. The general contractor is Andres Construction Services of Dallas.
 
Financing was provided through Capital One Bank and Fidelity Homestead Savings Bank, both in New Orleans.
 
HRI Lodging, HRI’s affiliated hotel management arm, will mange the Hilton Garden Inn Hotel, and HRI Management will manage the apartments.
 
The hotel amenities will include a first floor lobby with a restaurant/bar with outdoor seating. 2,000 square feet of meeting space will be constructed on the fifth floor, along with an outdoor pool deck and a fitness center for the hotel guests. Guest rooms will include all Hilton Garden Inn brand standard features including 42” flat panel TVs and in-room refrigerator.
 
The 186 apartment units will be located on floors 15 through 32 and feature condominium level finishes, washer and dryer appliances and stunning views of the Dallas skyline. Separate resident-only amenities include a fitness center, rooftop deck, and community space in addition to access to the public amenities of the hotel such as restaurant and bar space.

Related Stories

Adaptive Reuse | Oct 22, 2024

Adaptive reuse project transforms 1840s-era mill building into rental housing

A recently opened multifamily property in Lawrence, Mass., is an adaptive reuse of an 1840s-era mill building. Stone Mill Lofts is one of the first all-electric mixed-income multifamily properties in Massachusetts. The all-electric building meets ambitious modern energy codes and stringent National Park Service historic preservation guidelines.

MFPRO+ News | Oct 22, 2024

Project financing tempers robust demand for multifamily housing

AEC Giants with multifamily practices report that the sector has been struggling over the past year, despite the high demand for housing, especially affordable products.

Performing Arts Centers | Oct 21, 2024

The New Jersey Performing Arts Center breaks ground on $336 million redevelopment of its 12-acre campus

In Newark, N.J., the New Jersey Performing Arts Center (NJPAC) has broken grown on the three-year, $336 million redevelopment of its 12-acre campus. The project will provide downtown Newark 350 mixed-income residential units, along with shops, restaurants, outdoor gathering spaces, and an education and community center with professional rehearsal spaces.

Office Buildings | Oct 21, 2024

3 surprises impacting the return to the office

This blog series exploring Gensler's Workplace Survey shows the top three surprises uncovered in the return to the office.

Healthcare Facilities | Oct 18, 2024

7 design lessons for future-proofing academic medical centers

HOK’s Paul Strohm and Scott Rawlings and Indiana University Health’s Jim Mladucky share strategies for planning and designing academic medical centers that remain impactful for generations to come.

Sports and Recreational Facilities | Oct 17, 2024

In the NIL era, colleges and universities are stepping up their sports facilities game

NIL policies have raised expectations among student-athletes about the quality of sports training and performing facilities, in ways that present new opportunities for AEC firms.

Codes and Standards | Oct 17, 2024

Austin, Texas, adopts AI-driven building permit software

After a successful pilot program, Austin has adopted AI-driven building permit software to speed up the building permitting process.

Resiliency | Oct 17, 2024

U.S. is reducing floodplain development in most areas

The perception that the U.S. has not been able to curb development in flood-prone areas is mostly inaccurate, according to new research from climate adaptation experts. A national survey of floodplain development between 2001 and 2019 found that fewer structures were built in floodplains than might be expected if cities were building at random.

Seismic Design | Oct 17, 2024

Calif. governor signs limited extension to hospital seismic retrofit mandate

Some California hospitals will have three additional years to comply with the state’s seismic retrofit mandate, after Gov. Gavin Newsom signed a bill extending the 2030 deadline.

MFPRO+ News | Oct 16, 2024

One-third of young adults say hurricanes like Helene and Milton will impact where they choose to live

Nearly one-third of U.S. residents between 18 and 34 years old say they are reconsidering where they want to move after seeing the damage wrought by Hurricane Helene, according to a Redfin report. About 15% of those over age 35 echoed their younger cohort’s sentiment.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021