flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Developer will convert Dallas' storied LTV Building into mixed-use residential tower

Developer will convert Dallas' storied LTV Building into mixed-use residential tower

Completed in 1964, the 32-story tower once featured the world’s largest electronic signboard.


By HRI Properties | May 30, 2014
Led by Dallas Mayor Mike Rawlings, New Orleans-based HRI Properties will officially mark the launch of the LTV Building’s $80 million conversion into downtown Dallas’s first mixed-use hotel and residential complex.
 
New Orleans-based HRI Properties, LLC (HRI) recently completed the purchase of one of the most storied buildings in downtown Dallas and will convert it to an innovative mixed-use complex that will include a 171-room Hilton Garden Inn Hotel and 186 luxury apartments.
 
While multi-use residential conversions are still relatively rare in the U.S. outside of New York City, this will be the sixth such development by HRI. The company has converted similar projects in New Orleans,  Houston, Jackson, MS and Richmond, VA. Currently, HRI is also redeveloping the 225 Baronne Building in downtown New Orleans into a 188-room Aloft Hotel and 192 apartments.
 
“HRI Properties is a well respected developer out of New Orleans that has a successful track record in developing residential and hotel projects, and their plans for residential, hotel and retail will add greatly to the fun, vibrancy and quality of life creating a more urban environment Downtown,” said John Crawford, CEO of Downtown Dallas, Inc. 
 
“The redevelopment of 1600 Pacific is giving our downtown revitalization efforts another real boost and serves as yet another example of the importance of public/private partnerships to achieve mutual goals and objectives,” Crawford added.
 
“Today represents another accomplishment in our commitment to revitalize downtown,” Mayor Rawlings said. “This project will help attract more urban residents of all ages, incomes and backgrounds to downtown and continue to establish it as a vibrant neighborhood.”
 
The building, constructed in 1964, was known for many years as the LTV Building, headquarters of the former Ling-Temco-Vought company. The building’s façade created the world’s largest electronic signboard at the time. Thirty windows on each of the upper 25 floors were individually controlled and could be configured to shapes, letters and messages.
 
“In the thirty years since our founding, we have established a unique expertise in revitalizing urban centers through adaptive redevelopment of historic buildings,” said Tom Leonhard, CEO of HRI.  “Communities as varied as Richmond and Jackson have enthusiastically welcomed our capabilities in reviving their downtown centers, and we look forward to replicating that success in a major market like Dallas,” he said.
 
“The cooperation of local officials and partners is absolutely essential in a project of this nature,” said Leonhard. “This would not have come to a successful closing without the enthusiastic support from Mayor Rawlings, the City of Dallas Office of Economic Development, Downtown Dallas, Inc. and District 14 Councilmember Philip T. Kingston, who was instrumental in navigating the regulatory process for the conversion of this Dallas landmark into its new life as a multi-use complex,” Leonhard added.
 
The 32-story LTV Building is within walking distance to major downtown office buildings and the DART light rail. Residents will have exclusive access to 206 self-park parking spaces in the building on floors 2-4. The hotel will utilize 148 valet parking spaces in the basement of the LTV Building.
 
Construction is scheduled to be completed by third quarter 2015.
 
Architects for the project are HCI Architecture, Inc. and Merriman Associates/Architects, Inc. of Dallas. Interior design is by Looney & Associates. The general contractor is Andres Construction Services of Dallas.
 
Financing was provided through Capital One Bank and Fidelity Homestead Savings Bank, both in New Orleans.
 
HRI Lodging, HRI’s affiliated hotel management arm, will mange the Hilton Garden Inn Hotel, and HRI Management will manage the apartments.
 
The hotel amenities will include a first floor lobby with a restaurant/bar with outdoor seating. 2,000 square feet of meeting space will be constructed on the fifth floor, along with an outdoor pool deck and a fitness center for the hotel guests. Guest rooms will include all Hilton Garden Inn brand standard features including 42” flat panel TVs and in-room refrigerator.
 
The 186 apartment units will be located on floors 15 through 32 and feature condominium level finishes, washer and dryer appliances and stunning views of the Dallas skyline. Separate resident-only amenities include a fitness center, rooftop deck, and community space in addition to access to the public amenities of the hotel such as restaurant and bar space.

Related Stories

Museums | Aug 11, 2010

Design guidelines for museums, archives, and art storage facilities

This column diagnoses the three most common moisture challenges with museums, archives, and art storage facilities and provides design guidance on how to avoid them.

| Aug 11, 2010

Broadway-style theater headed to Kentucky

One of Kentucky's largest performing arts venues should open in 2011—that's when construction is expected to wrap up on Eastern Kentucky University's Business & Technology Center for Performing Arts. The 93,000-sf Broadway-caliber theater will seat 2,000 audience members and have a 60×24-foot stage proscenium and a fly loft.

| Aug 11, 2010

People+Firms

| Aug 11, 2010

Citizenship building in Texas targets LEED Silver

The Department of Homeland Security's new U.S. Citizenship and Immigration Services facility in Irving, Texas, was designed by 4240 Architecture and developed by JDL Castle Corporation. The focal point of the two-story, 56,000-sf building is the double-height, glass-walled Ceremony Room where new citizens take the oath.

| Aug 11, 2010

Carpenters' union helping build its own headquarters

The New England Regional Council of Carpenters headquarters in Dorchester, Mass., is taking shape within a 1940s industrial building. The Building Team of ADD Inc., RDK Engineers, Suffolk Construction, and the carpenters' Joint Apprenticeship Training Committee, is giving the old facility a modern makeover by converting the existing two-story structure into a three-story, 75,000-sf, LEED-certif...

| Aug 11, 2010

Utah research facility reflects Native American architecture

A $130 million research facility is being built at University of Utah's Salt Lake City campus. The James L. Sorenson Molecular Biotechnology Building—a USTAR Innovation Center—is being designed by the Atlanta office of Lord Aeck & Sargent, in association with Salt-Lake City-based Architectural Nexus.

| Aug 11, 2010

San Bernardino health center doubles in size

Temecula, Calif.-based EDGE was awarded the contract for California State University San Bernardino's health center renovation and expansion. The two-phase, $4 million project was designed by RSK Associates, San Francisco, and includes an 11,000-sf, tilt-up concrete expansion—which doubles the size of the facility—and site and infrastructure work.

| Aug 11, 2010

Goettsch Partners wins design competition for Soochow Securities HQ in China

Chicago-based Goettsch Partners has been selected to design the Soochow Securities Headquarters, the new office and stock exchange building for Soochow Securities Co. Ltd. The 21-story, 441,300-sf project includes 344,400 sf of office space, an 86,100-sf stock exchange, classrooms, and underground parking.

| Aug 11, 2010

New hospital expands Idaho healthcare options

Ascension Group Architects, Arlington, Texas, is designing a $150 million replacement hospital for Portneuf Medical Center in Pocatello, Idaho. An existing facility will be renovated as part of the project. The new six-story, 320-000-sf complex will house 187 beds, along with an intensive care unit, a cardiovascular care unit, pediatrics, psychiatry, surgical suites, rehabilitation clinic, and ...

| Aug 11, 2010

Colonnade fixes setback problem in Brooklyn condo project

The New York firm Scarano Architects was brought in by the developers of Olive Park condominiums in the Williamsburg section of Brooklyn to bring the facility up to code after frame out was completed. The architects designed colonnades along the building's perimeter to create the 15-foot setback required by the New York City Planning Commission.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021