flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Developer will convert Dallas' storied LTV Building into mixed-use residential tower

Developer will convert Dallas' storied LTV Building into mixed-use residential tower

Completed in 1964, the 32-story tower once featured the world’s largest electronic signboard.


By HRI Properties | May 30, 2014
Led by Dallas Mayor Mike Rawlings, New Orleans-based HRI Properties will officially mark the launch of the LTV Building’s $80 million conversion into downtown Dallas’s first mixed-use hotel and residential complex.
 
New Orleans-based HRI Properties, LLC (HRI) recently completed the purchase of one of the most storied buildings in downtown Dallas and will convert it to an innovative mixed-use complex that will include a 171-room Hilton Garden Inn Hotel and 186 luxury apartments.
 
While multi-use residential conversions are still relatively rare in the U.S. outside of New York City, this will be the sixth such development by HRI. The company has converted similar projects in New Orleans,  Houston, Jackson, MS and Richmond, VA. Currently, HRI is also redeveloping the 225 Baronne Building in downtown New Orleans into a 188-room Aloft Hotel and 192 apartments.
 
“HRI Properties is a well respected developer out of New Orleans that has a successful track record in developing residential and hotel projects, and their plans for residential, hotel and retail will add greatly to the fun, vibrancy and quality of life creating a more urban environment Downtown,” said John Crawford, CEO of Downtown Dallas, Inc. 
 
“The redevelopment of 1600 Pacific is giving our downtown revitalization efforts another real boost and serves as yet another example of the importance of public/private partnerships to achieve mutual goals and objectives,” Crawford added.
 
“Today represents another accomplishment in our commitment to revitalize downtown,” Mayor Rawlings said. “This project will help attract more urban residents of all ages, incomes and backgrounds to downtown and continue to establish it as a vibrant neighborhood.”
 
The building, constructed in 1964, was known for many years as the LTV Building, headquarters of the former Ling-Temco-Vought company. The building’s façade created the world’s largest electronic signboard at the time. Thirty windows on each of the upper 25 floors were individually controlled and could be configured to shapes, letters and messages.
 
“In the thirty years since our founding, we have established a unique expertise in revitalizing urban centers through adaptive redevelopment of historic buildings,” said Tom Leonhard, CEO of HRI.  “Communities as varied as Richmond and Jackson have enthusiastically welcomed our capabilities in reviving their downtown centers, and we look forward to replicating that success in a major market like Dallas,” he said.
 
“The cooperation of local officials and partners is absolutely essential in a project of this nature,” said Leonhard. “This would not have come to a successful closing without the enthusiastic support from Mayor Rawlings, the City of Dallas Office of Economic Development, Downtown Dallas, Inc. and District 14 Councilmember Philip T. Kingston, who was instrumental in navigating the regulatory process for the conversion of this Dallas landmark into its new life as a multi-use complex,” Leonhard added.
 
The 32-story LTV Building is within walking distance to major downtown office buildings and the DART light rail. Residents will have exclusive access to 206 self-park parking spaces in the building on floors 2-4. The hotel will utilize 148 valet parking spaces in the basement of the LTV Building.
 
Construction is scheduled to be completed by third quarter 2015.
 
Architects for the project are HCI Architecture, Inc. and Merriman Associates/Architects, Inc. of Dallas. Interior design is by Looney & Associates. The general contractor is Andres Construction Services of Dallas.
 
Financing was provided through Capital One Bank and Fidelity Homestead Savings Bank, both in New Orleans.
 
HRI Lodging, HRI’s affiliated hotel management arm, will mange the Hilton Garden Inn Hotel, and HRI Management will manage the apartments.
 
The hotel amenities will include a first floor lobby with a restaurant/bar with outdoor seating. 2,000 square feet of meeting space will be constructed on the fifth floor, along with an outdoor pool deck and a fitness center for the hotel guests. Guest rooms will include all Hilton Garden Inn brand standard features including 42” flat panel TVs and in-room refrigerator.
 
The 186 apartment units will be located on floors 15 through 32 and feature condominium level finishes, washer and dryer appliances and stunning views of the Dallas skyline. Separate resident-only amenities include a fitness center, rooftop deck, and community space in addition to access to the public amenities of the hotel such as restaurant and bar space.

Related Stories

Architects | Oct 20, 2022

Woolpert acquires Sheehan Nagle Hartray Architects, global experts in mission critical design

Woolpert has acquired Sheehan Nagle Hartray Architects, a full-service architecture firm that specializes in mission critical and technically challenging projects, interior design and predesign services for commercial, civic and education clients. SNHA has offices in Chicago and London.

Mixed-Use | Oct 20, 2022

ROI on resilient multifamily construction can be as high as 72%

A new study that measured the economic value of using FORTIFIED Multifamily, a voluntary beyond-code construction and re-roofing method developed by the Insurance Institute for Business & Home Safety (IBHS), found the return can be as high as 72%.

40 Under 40 | Oct 19, 2022

Meet the 40 Under 40 class of 2022

Each year, the editors of Building Design+Construction honor 40 architects engineers, contractors, and real estate developers as BD+C 40 Under 40 awards winners. These AEC professionals are recognized for their career achievements, passion for the AEC profession, involvement with AEC industry organizations, and service to their communities.

BAS and Security | Oct 19, 2022

The biggest cybersecurity threats in commercial real estate, and how to mitigate them

Coleman Wolf, Senior Security Systems Consultant with global engineering firm ESD, outlines the top-three cybersecurity threats to commercial and institutional building owners and property managers, and offers advice on how to deter and defend against hackers. 

Designers | Oct 19, 2022

Architecture Billings Index moderates but remains healthy

For the twentieth consecutive month architecture firms reported increasing demand for design services in September, according to a new report today from The American Institute of Architects (AIA).

Building Team | Oct 18, 2022

Brasfield & Gorrie chairman’s home vandalized by anti-development activists

Activists vandalized the home and vehicles of Miller Gorrie, chairman of Birmingham-based Brasfield & Gorrie, in protest of a planned $90 million, 85-acre police, fire and public safety training center in Atlanta.

Mixed-Use | Oct 18, 2022

Mixed-use San Diego tower inspired by coastal experience and luxury travel

The new 525 Olive mixed use San Diego tower was inspired by the coastal experience and luxury travel.

University Buildings | Oct 18, 2022

A carbon-neutral-ready university campus opens in Hong Kong

In early September, the Hong Kong University of Science and Technology (HKUST) officially opened its new, KPF-designed campus in Nansha, Guangzhou (GZ).

Market Data | Oct 17, 2022

Calling all AEC professionals! BD+C editors need your expertise for our 2023 market forecast survey

The BD+C editorial team needs your help with an important research project. We are conducting research to understand the current state of the U.S. design and construction industry.

Codes and Standards | Oct 17, 2022

Ambitious state EV adoption goals put pressure on multifamily owners to provide chargers

California’s recently announced ban on the sale of new gas-powered vehicles starting in 2035—and New York’s recent decision to follow suit—are putting pressure on multifamily property owners to install charging stations for tenants.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021