flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Dewalt introduces rugged construction smartphone

Contractors

Dewalt introduces rugged construction smartphone

The Android-powered device is waterproof, dustproof, weatherproof, and can withstand drops up to two meters.


By BD+C Editors | April 21, 2016

Photo: Dewalt.

As if we needed further proof that smartphones are tools. Dewalt, the maker of a plethora of devices and gadgets for construction pros, has introduced the MD501 smartphone.

The phone is designed for building industry workers. It is waterproof, dustproof, and it can withstand drops up to nearly six feet and temperatures from 144 F to below zero. It is IP68-certified, meaning it can be submerged in two-meter-deep water for up to 30 minutes. The touchscreen, which is made of the strong Gorilla Glass, can still be used with gloves. 

Along with all the standard smartphone features, like GPS, a 13 MP camera, a radio and MP3 player, and a Bluetooth receiver, the MD501 has dual SIM capabilities (making it easier to separate business and personal use) and Qi charging. Instead of having to connect and unplug cables, the phone can be charged by placing it on a Qi charging pad.

The MD501 is Android-powered and has 4G internet speeds. More specs and ordering information can be found here.

Dewalt is joining a market already occupied by construction equipment manufacturer Caterpillar, the maker of several industry-grade smartphones.

Related Stories

High-rise Construction | Mar 24, 2015

Timber high-rise residential complex will tower over Stockholm waterfront

The four towers, 20 stories each, will be made entirely out of Swedish pine, from frame to façade.

Religious Facilities | Mar 23, 2015

Is nothing sacred? Seattle church to become a restaurant and ballroom

A Seattle-based real estate developer plans to convert a historic downtown building, which for more than a century has served as a church sanctuary, into a restaurant with ballroom space.

Government Buildings | Mar 23, 2015

SOM leads planning for Egypt’s new $45 billion capital city

To alleviate overcrowding and congestion in Cairo, the Egyptian government is building a new capital from scratch.

Healthcare Facilities | Mar 23, 2015

Can advanced elevator technology take vertical hospitals to the next level?

VOA's Douglas King recalls the Odyssey project and ponders vertical transportation in high-rise healthcare design.

Healthcare Facilities | Mar 22, 2015

New Joplin, Mo., hospital built to tornado-resistant standards

The new hospital features a window and frame system that can protect patients from winds of up to 250 mph. 

Sports and Recreational Facilities | Mar 19, 2015

Populous design wins competition for UK's most sustainable arena

The live-concert venue will seat an audience of 12,000, which the firm says will be masked by “the atmosphere and intimacy of a 4,000-seat amphitheatre.” 

Multifamily Housing | Mar 18, 2015

Prefabricated skycubes proposed with 'elastic' living apartments inside

The interiors for each unit are designed using an elastic living concept, where different spaces are created by sliding on tracks.

Sponsored | | Mar 17, 2015

Are face-to-face meetings still important?

One CEO looks pass convenience and advocates for old school, in-person meetings.

Healthcare Facilities | Mar 16, 2015

Healthcare planning in a post-ACA world: 3 strategies for success

Healthcare providers are seeking direction on how to plan for a value-based world while still very much operating in a volume-based market. CBRE Healthcare's Curtis Skolnick offers helpful strategies. 

Mixed-Use | Mar 13, 2015

Dubai announces mega waterfront development Aladdin City

Planned on 4,000 acres in the Dubai Creek area, the towers will be covered in gold lattice and connected via air-conditioned bridges.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021