As if we needed further proof that smartphones are tools. Dewalt, the maker of a plethora of devices and gadgets for construction pros, has introduced the MD501 smartphone.
The phone is designed for building industry workers. It is waterproof, dustproof, and it can withstand drops up to nearly six feet and temperatures from 144 F to below zero. It is IP68-certified, meaning it can be submerged in two-meter-deep water for up to 30 minutes. The touchscreen, which is made of the strong Gorilla Glass, can still be used with gloves.
Along with all the standard smartphone features, like GPS, a 13 MP camera, a radio and MP3 player, and a Bluetooth receiver, the MD501 has dual SIM capabilities (making it easier to separate business and personal use) and Qi charging. Instead of having to connect and unplug cables, the phone can be charged by placing it on a Qi charging pad.
The MD501 is Android-powered and has 4G internet speeds. More specs and ordering information can be found here.
Dewalt is joining a market already occupied by construction equipment manufacturer Caterpillar, the maker of several industry-grade smartphones.
Related Stories
| Feb 28, 2012
Roofing contractors recognized for workmanship
Sika Sarnafil announces Project of the Year winners; competition highlights visually stunning, energy efficient, and sustainable roofs.
| Feb 28, 2012
Waste Management awards companies for sustainable construction
This recognition, highlighting sustainable performances within the construction industry, looks to celebrate the builders who achieved important sustainability milestones in 2011, as determined by Waste Management’s online Diversion and Recycling Tracking Tool.
| Feb 28, 2012
Salem State University Library & Learning Commons topped off
When it opens to students in the fall of 2013, the $60 million facility will offer new archival space; circulation and reference areas; collections; reading spaces; study rooms; instruction labs and a Dean’s suite.
| Feb 28, 2012
More than 1,000 have earned EDAC certification since 2009
Milestone achieved as evidence-based design becomes a top 2012 strategy for healthcare organizations.
| Feb 28, 2012
McCarthy completes second phase of San Diego’s Scripps Hospital
Representing the second phase of a four-phased, $41.3 million expansion and remodeling project, the new addition doubles the size of the existing emergency department and trauma center to encompass a combined 27,000 square feet of space.
| Feb 28, 2012
LUMEnergi names Weinbaum president and CEO
Weinbaum’s experience spans communications, nanotechnology, electronics components, consumer products, semiconductors, software, wireless and lighting.
| Feb 28, 2012
Griffin Electric completes Medical University of South Carolina project
The 210,000-sf complex is comprised of two buildings, and houses research, teaching and office areas, plus conference spaces for the University.
| Feb 27, 2012
Consigli complete first building for Bigelow Ocean Sciences Campus
Designed by WBRC Architects Engineers in association with Perkins + Will.
| Feb 27, 2012
Hollister completes fit-out of 41,500-sf office space in Princeton, N.J.
Intricate interior project involved construction of more than 80 offices.
| Feb 27, 2012
Research Institute at Texas Children’s Hospital building receives LEED Gold
Innovative and sustainable design reflects best environmental building practices.