flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Dewalt introduces rugged construction smartphone

Contractors

Dewalt introduces rugged construction smartphone

The Android-powered device is waterproof, dustproof, weatherproof, and can withstand drops up to two meters.


By BD+C Editors | April 21, 2016

Photo: Dewalt.

As if we needed further proof that smartphones are tools. Dewalt, the maker of a plethora of devices and gadgets for construction pros, has introduced the MD501 smartphone.

The phone is designed for building industry workers. It is waterproof, dustproof, and it can withstand drops up to nearly six feet and temperatures from 144 F to below zero. It is IP68-certified, meaning it can be submerged in two-meter-deep water for up to 30 minutes. The touchscreen, which is made of the strong Gorilla Glass, can still be used with gloves. 

Along with all the standard smartphone features, like GPS, a 13 MP camera, a radio and MP3 player, and a Bluetooth receiver, the MD501 has dual SIM capabilities (making it easier to separate business and personal use) and Qi charging. Instead of having to connect and unplug cables, the phone can be charged by placing it on a Qi charging pad.

The MD501 is Android-powered and has 4G internet speeds. More specs and ordering information can be found here.

Dewalt is joining a market already occupied by construction equipment manufacturer Caterpillar, the maker of several industry-grade smartphones.

Related Stories

| Oct 21, 2010

GSA confirms new LEED Gold requirement

The General Services Administration has increased its sustainability requirements and now mandates LEED Gold for its projects.

| Oct 18, 2010

World’s first zero-carbon city on track in Abu Dhabi

Masdar City, the world’s only zero-carbon city, is on track to be built in Abu Dhabi, with completion expected as early as 2020. Foster + Partners developed the $22 billion city’s master plan, with Adrian Smith + Gordon Gill Architecture, Aedas, and Lava Architects designing buildings for the project’s first phase, which is on track to be ready for occupancy by 2015.

| Oct 13, 2010

Editorial

The AEC industry shares a widespread obsession with the new. New is fresh. New is youthful. New is cool. But “old” or “slightly used” can be financially profitable and professionally rewarding, too.

| Oct 13, 2010

Test run on the HP Z200 SFF Good Value in a Small Package

Contributing Editor Jeff Yoders tests a new small-form factor, workstation-class desktop in Hewlett-Packard’s line that combines performance of its minitower machine with a smaller chassis and a lower price.

| Oct 13, 2010

Prefab Trailblazer

The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.

| Oct 13, 2010

Thought Leader

Sundra L. Ryce, President and CEO of SLR Contracting & Service Company, Buffalo, N.Y., talks about her firm’s success in new construction, renovation, CM, and design-build projects for the Navy, Air Force, and Buffalo Public Schools.

| Oct 13, 2010

Hospital tower gets modern makeover

The Wellmont Holston Valley Medical Center in Kingsport, Tenn., expanded its D unit, a project that includes a 243,443-sf addition with a 12-room operating suite, a 36-bed intensive care unit, and an enlarged emergency department.

| Oct 13, 2010

Modern office design accentuates skyline views

Intercontinental|Exchange, a Chicago-based financial firm, hired design/engineering firm Epstein to create a modern, new 31st-floor headquarters.

| Oct 13, 2010

Hospital and clinic join for better patient care

Designed by HGA Architects and Engineers, the two-story Owatonna (Minn.) Hospital, owned by Allina Hospitals and Clinics, connects to a newly expanded clinic owned by Mayo Health System to create a single facility for inpatient and outpatient care.

| Oct 13, 2010

Biloxi’s convention center bigger, better after Katrina

The Mississippi Coast Coliseum and Convention Center in Biloxi is once again open for business following a renovation and expansion necessitated by Hurricane Katrina.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021