Dewberry, a professional services firm, announced the acquisition of Wilson Architectural Group. Headquartered in Houston, Wilson is a nearly 40-person architectural firm with a portfolio of healthcare, corporate and commercial, industrial, sports and recreation, laboratories, and civic buildings in Houston and throughout Texas. During integration, the Houston office will be known as and will do business as Dewberry | Wilson.
Gary Wilson, Founding Partner of Wilson Architectural Group, said, “The partners at Wilson had been seeking a firm that could help us increase our capacity to support our clients, provide more professional growth opportunities for our employees, and support the future longevity of the practice in Houston.”
To bolster the Houston office’s programming, master planning, architectural design, construction management, and interior design services, Dewberry | Wilson’s employees will now be able to reach into the Dewberry organization for MEP, technology design, site/civil, and land development capabilities.
Jim Draheim, President of Dewberry’s architectural division, said, "Our integrated capabilities will better support existing clients in the region. Because of this office’s excellent track record in healthcare design, we also anticipate significant growth of our national healthcare practice.”
Dewberry currently has offices in the region, including Dallas and Denton, Texas, as well as a long-standing healthcare and civic architectural practice in Tulsa, Okla.
Related Stories
| May 10, 2012
Chapter 6 Energy Codes + Reconstructed Buildings: 2012 and Beyond
Our experts analyze the next generation of energy and green building codes and how they impact reconstruction.
| May 10, 2012
Chapter 5 LEED-EB and Green Globes CIEB: Rating Sustainable Reconstruction
Certification for existing buildings under these two rating programs has overtaken that for new construction.
| May 10, 2012
Chapter 4 Business Case for High-Performance Reconstructed Buildings
Five reconstruction projects in one city make a bottom-line case for reconstruction across the country.
| May 10, 2012
Chapter 3 How Building Technologies Contribute to Reconstruction Advances
Building Teams are employing a wide variety of components and systems in their reconstruction projects.
| May 10, 2012
Chapter 2 Exemplary High-Performance Reconstruction Projects
Several case studies show how to successfully renovate existing structures into high-performance buildings.
| May 9, 2012
Chapter 1 Reconstruction: ‘The 99% Solution’ for Energy Savings in Buildings
As a share of total construction activity reconstruction has been on the rise in the U.S. and Canada in the last few years, which creates a golden opportunity for extensive energy savings.
| May 9, 2012
International green building speaker to keynote Australia’s largest building systems trade show
Green building, sustainability consultant, green building book author Jerry Yudelson will be the keynote speaker at the Air-Conditioning, Refrigeration and Building Systems (ARBS) conference in Melbourne, Australia.
| May 9, 2012
Tishman delivers Revel six weeks early
Revel stands more than 730 feet tall, consists of over 6.3 milliont--sf of space, and is enclosed by 836,762-sf of glass.
| May 9, 2012
Stoddert Elementary School in DC wins first US DOE Green Ribbon School Award
Sustainable materials, operational efficiency, and student engagement create high-performance, healthy environment for life-long learning.
| May 9, 2012
Shepley Bulfinch given IIDA Design award for Woodruff Library?
The design challenges included creating an entry sequence to orient patrons and highlight services; establishing a sense of identity visible from the exterior; and providing a flexible extended-hours access for part of the learning commons.