flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Dixie State University's new Human Performance Center

University Buildings

Dixie State University's new Human Performance Center

Hastings+Chivetta designed the project.


By David Malone, Associate Editor | April 29, 2020
DSU Human Performance Center exterior

All photos courtesy Hastings+Chivetta

Hastings +Chivetta, in association with MHTN Architects, has designed Dixie State University's new 155,000-sf Human Performance Center on their St. George, Utah campus. 

And while it may sound like the name of the building where Ivan Drago trained for his fight against Rocky Balboa, the Human Performance Center is actually the new home for the school's academic programs in Health and Human Performance such as exercise science, sports management, and health administration. The facility also provides space for Dixie State's joint effort with the University of Utah to offer physical and occupational therapy degrees.

 

Human Performance athletic training room

 

In addition to the new building's academic aspects, it will also serve the campus's recreation, intramural, and athletic needs. The Human Performance Center features a fitness center with cardio, weights, and functional training; a track; a two-court gymnasium; multi-activity courts; a climbing wall; and a rooftop recreation area.

Amenities include pickleball courts, basketball courts, an indoor outdoor track that will circle the roof and continue indoors via a sprint track, and a 50-meter swimming pool. The pool is the only one in Southern Utah that conforms to NCAA Division II standards and will be open to the public during non-academic hours.

 

Human Performance Center from East

 

Human Performance Center Fitness room

 

Human Performance Center pool room

 

Related Stories

Laboratories | Jul 24, 2020

Customized labs give universities a recruiting edge

CO Architects is among a handful of firms that caters to this trend.

University Buildings | Jul 14, 2020

Cornell College partners with Johnson Controls to improve campus energy efficiency

The plan will reduce the college’s energy usage by 20%.

University Buildings | Jun 3, 2020

Renovation can turn older university buildings into high-performing labs

David Miller of BSALifeStructures offers technical advice on renovation of college and university laboratories and scientific research facilities.

University Buildings | Jun 2, 2020

COVID-19 and teaching the next generation of nurses

COVID-19 hasn’t just upended healthcare delivery, the workplace, and all levels of education – the economic toll is still being realized – and capital projects on college and university campuses will inevitably be impacted as public and privately funded projects adjust to the budget crunch.

University Buildings | May 20, 2020

JCJ Architecture, Moody Nolan complete UCONN's Student Recreation Center

The project sits at the center of the Storrs campus.  

Coronavirus | Apr 10, 2020

COVID-19: Converting existing hospitals, hotels, convention centers, and other alternate care sites for coronavirus patients

COVID-19: Converting existing unused or underused hospitals, hotels, convention centers, and other alternate care sites for coronavirus patients 

University Buildings | Apr 9, 2020

Designing for the next generation of student life: Academically aligned

Since many academic departments have been concentrated in their own buildings or portions of campus, bringing these disciplines into a shared facility is fairly new territory.

boombox1
boombox2
native1

More In Category

Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021