DLR Group has completed the modernization of the Los Angeles Memorial Coliseum, which encompassed over 1,000,000 sf of improvements.
The modernization project improved stadium seating and circulation while replacing every seat and installing handrails throughout. The design intervention widened seats and increased leg room in many sections. As a result, seating capacity was reduced from 93,607 to approximately 77,500. Additionally, aisles were added and steps were replaced to improve safety.
Other improvements included upgraded entry concourses, new field and stadium lighting, updated audio and video with two new large screens on the east end of the stadium, upgraded WiFi throughout the venue, and new electrical, mechanical, and plumbing systems.
See Also: Erudite eSports: Colleges build their very own eSports arenas
The entirely new Scholarship Tower provides premium seating closer to the field and makes the venue more accessible beyond football season for corporate meetings, conferences, private events, weddings, and tours. A Club Lounge and roof deck adds a luxury space that offers premium food and entertainment options for the community.
The project was completed prior to the 2019 college football season.
Related Stories
| Mar 1, 2012
Bomel completes design-build parking complex at U.C. San Diego
The $24-million facility, which fits into a canyon setting on the university’s East Campus, includes 1,200 stalls in two adjoining garages and a soccer field on a top level.
| Feb 24, 2012
Skanska hires Tingle as senior VP and national director for its Sports Center of Excellence
Tingle has worked in the architecture and construction industries for more than 30 years, and for the last 23 years, he has focused primarily on large-scale sports construction projects
| Feb 2, 2012
Shawmut Design and Construction launches sports venues division
Expansion caps year of growth for Shawmut.
| Jan 31, 2012
Fusion Facilities: 8 reasons to consolidate multiple functions under one roof
‘Fusing’ multiple functions into a single building can make it greater than the sum of its parts. The first in a series on the design and construction of university facilities.
| Nov 29, 2011
SB Architects completes Mission Hills Volcanic Mineral Springs and Spa in China
Mission Hills Volcanic Mineral Springs and Spa is home to the largest natural springs reserve in the region, and measures 950,000 sf.
| Nov 11, 2011
Streamline Design-build with BIM
How construction manager Barton Malow utilized BIM and design-build to deliver a quick turnaround for Georgia Tech’s new practice facility.
| Nov 9, 2011
Sika Sarnafil Roof Recycling Program recognized by Society of Plastics Engineers
Program leads the industry in recovering and recycling roofing membrane into new roofing products.
| Nov 1, 2011
Sasaki expands national sports design studio
Sasaki has also added Stephen Sefton to the sports design studio as senior associate.
| Oct 20, 2011
UNT receives nation’s first LEED Platinum designation for collegiate stadium
Apogee Stadium will achieve another first in December with the completion of three wind turbines that will feed the electrical grid that powers the stadium.