Phoenix, Ariz., March 13, 2023 – After five years heading DLR Group’s campus planning practice, Principal and Campus Planning Leader Krisan Osterby, MLA, RLA, SCUP, ITGA, is transitioning to Senior Planner to focus her efforts as a thought leader, subject matter expert, and mentor in major projects.
Her current co-leader, Principal and Senior Campus Planner Linsey Graff, SCUP, has been named Campus Planning Leader. Graff will guide the continuing expansion of the Campus Planning studio within the firm’s growing global Higher Education practice.
GRAFF: 'EXCITING GROWTH OVER THE LAST 5 YEARS'
Graff began her career at DLR Group as Associate in 2018 and quickly rose to Principal. She has collaborated with colleges and universities worldwide to develop integrated campus plans, sustainability plans, and strategic visioning.
She supports campus and community engagement that defines goals and objectives with user groups, prioritizes planning solutions, and encourages participatory decision-making.
Graff’s leadership and innovation in DLR Group’s 360 Engagement Process has elevated the Campus Planning studio and led to such projects as the California State University Long Beach Campus Master Plan, Riverside Community College District Sustainability and Climate Action Plan, and the Northern Arizona University Smart Campus Master Plan.
“We’ve seen so much exciting growth in the campus planning team and portfolio over the past five years,” said Graff.
Graff held a three-year term on the AIA National Diversity and Inclusion Council, where she focused on increasing attention and resources for K–12 pipeline programs. She was one of 22 architects and educators to be invited to join the Equity in Architecture Commission and was featured on the Design is Everywhere podcast, discussing equity, wellness, and engagement.
At DLR Group, Graff is a leader in our Equity Forum, advocating for equity initiatives companywide. Graff is a leader within the Society for College and University Planning (SCUP) Pacific Regional Council. In her role as Membership Chair, she is working on initiatives to increase membership at both the local and national levels.
OSTERBY: 'EVERY CAMPUS TELLS A STORY'
In her role as Senior Planner, Osterby will continue to usher in a new generation of planners and designers, while advising, deepening relationships with institutions, and continuing to expand campus planning in the worldwide market.
“This transition allows me to return to clients and projects that seek a deeper connection between strategic and physical planning,” said Osterby. “Every campus tells a story. I’m excited to focus on the educational, environmental, and operational changes required to support that story.”
Osterby’s expertise includes comprehensive campus plans, academic health center facility plans, and landscape master plans. Her decades-long institutional relationships span from Alaska to Florida, working with community college districts, liberal arts colleges, HBCUs, public and private universities, and land grant institutions.
Osterby has contributed to campus and plans in Canada, Great Britain, Hong Kong, India, and Iraq, stemming from her studies as an IES Scholar and Fulbright/ITT Fellow.
She is a licensed Landscape Architect and a member of the Gustavus Adolphus College Arboretum Advisory Board and the Society for College and University Planning Academy, and is a Director of the International Town Gown Association.
“Krisan has been vitally instrumental in building our Campus Planning studio over the past five years,” said Senior Principal and Global Higher Education Leader Stu Rothenberger.
ABOUT DLR GROUP
DLR Group is an integrated design firm delivering architecture, engineering, interiors, planning, and building optimization for new construction, renovation, and adaptive reuse. Our promise is to elevate the human experience through design. This promise inspires sustainable design for a diverse group of public and private sector clients and local communities.
DLR Group is 100% employee-owned and supports the initiatives and goals of the 2030 Challenge, and is an initial signatory to the China Accord and the AIA 2030 Commitment.
Related Stories
| Sep 19, 2013
6 emerging energy-management glazing technologies
Phase-change materials, electrochromic glass, and building-integrated PVs are among the breakthrough glazing technologies that are taking energy performance to a new level.
| Sep 19, 2013
Roof renovation tips: Making the choice between overlayment and tear-off
When embarking upon a roofing renovation project, one of the first decisions for the Building Team is whether to tear off and replace the existing roof or to overlay the new roof right on top of the old one. Roofing experts offer guidance on making this assessment.
| Sep 11, 2013
BUILDINGChicago eShow Daily – Day 3 coverage
Day 3 coverage of the BUILDINGChicago/Greening the Heartland conference and expo, taking place this week at the Holiday Inn Chicago Mart Plaza.
| Sep 10, 2013
BUILDINGChicago eShow Daily – Day 2 coverage
The BD+C editorial team brings you this real-time coverage of day 2 of the BUILDINGChicago/Greening the Heartland conference and expo taking place this week at the Holiday Inn Chicago Mart Plaza.
| Sep 4, 2013
K-12 school design that pays off for students
More and more educators are being influenced by the Reggio Emilia approach to pedagogy, with its mantra of “environment as the third teacher”—an approach that gives Building Teams a responsibility to pay even closer attention to the special needs of today’s schools.
| Sep 4, 2013
Smart building technology: Talking results at the BUILDINGChicago/ Greening the Heartland show
Recent advancements in technology are allowing owners to connect with facilities as never before, leveraging existing automation systems to achieve cost-effective energy improvements. This BUILDINGChicago presentation will feature Procter & Gamble’s smart building management program.
| Sep 3, 2013
'School in a box' project will place school in San Diego public library
Thinking outside the box, LPA Inc. is designing a school inside a box. With an emphasis on three E’s—Engage, Educate, and Empower—e3 Civic High is now being constructed on the sixth and seventh floors of a public library in downtown San Diego. Library patrons will be able to see into the school via glass elevators, but will not have physical access to the school.
| Aug 30, 2013
Modular classrooms gaining strength with school boards
With budget, space needs, and speed-to-market pressures bearing down on school districts, modular classroom assemblies are often a go-to solution.
| Aug 27, 2013
College of the Desert in Palm Springs to produce more energy than it consumes
A 60-acre solar farm next to the College of the Desert in Palm Springs, Calif., along with a number of sustainable building features, are projected to help the campus produce more energy than it uses.
| Aug 26, 2013
What you missed last week: Architecture billings up again; record year for hotel renovations; nation's most expensive real estate markets
BD+C's roundup of the top construction market news for the week of August 18 includes the latest architecture billings index from AIA and a BOMA study on the nation's most and least expensive commercial real estate markets.