Emaar Properties, known for its futuristic approach to buildings, has unveiled plans for a new project containing two towers that will top the charts in height, making them the world’s tallest towers once completed.
Dubai Creek Harbour will boast 39,000 homes and 22 hotels, making it three times the size of its downtown area, which contains the world’s tallest building, Burj Khalifa. Emaar Properties is partnering with Dubai Holding on this project.
Six towers, retail elements, and three hotels will round out Dubai Creek Residences, the first phase of the project, with the twin towers expected to be the centerpiece of the development. The six towers, which are 40 stories tall, will become waterfront properties, and contain one, two, and three bedroom apartments ranging from 880 to 2,154 sf. Dubai Creek Harbour as a whole will encompass 6 million sm (or 1,482 acres).
Starting November 1, apartments in two of the six towers will be available for sale on a first-come first-serve basis in the following locations: Dubai, Abu Dhabi, London, and Moscow.
Chairman of Emaar Properties, Mohamed Alabbar, told The National that the current market will be able to handle this magnitude of a project. “I think all the stakeholders in Dubai in this business learnt their lessons and have matured, the buyer, seller, bank, and regulator,” said Alabbar. “What is boils down to is supply and demand.”
Alabbar also commented to Dubai Holding that the vision of the project, “was to create a dynamic city of the future that integrates smart networks, while building on the cultural heritage of our city.”
Emaar Properties has not released information about the cost of the project, funding requirements, when ground will be broken, or the architect of the project.
For more information, visit www.emaar.com.
Related Stories
| Nov 2, 2010
Energy Analysis No Longer a Luxury
Back in the halcyon days of 2006, energy analysis of building design and performance was a luxury. Sure, many forward-thinking AEC firms ran their designs through services such as Autodesk’s Green Building Studio and IES’s Virtual Environment, and some facility managers used Honeywell’s Energy Manager and other monitoring software. Today, however, knowing exactly how much energy your building will produce and use is survival of the fittest as energy costs and green design requirements demand precision.
| Nov 2, 2010
Yudelson: ‘If It Doesn’t Perform, It Can’t Be Green’
Jerry Yudelson, prolific author and veteran green building expert, challenges Building Teams to think big when it comes to controlling energy use and reducing carbon emissions in buildings.
| Nov 2, 2010
Historic changes to commercial building energy codes drive energy efficiency, emissions reductions
Revisions to the commercial section of the 2012 International Energy Conservation Code (IECC) represent the largest single-step efficiency increase in the history of the national, model energy. The changes mean that new and renovated buildings constructed in jurisdictions that follow the 2012 IECC will use 30% less energy than those built to current standards.
| Nov 1, 2010
Sustainable, mixed-income housing to revitalize community
The $41 million Arlington Grove mixed-use development in St. Louis is viewed as a major step in revitalizing the community. Developed by McCormack Baron Salazar with KAI Design & Build (architect, MEP, GC), the project will add 112 new and renovated mixed-income rental units (market rate, low-income, and public housing) totaling 162,000 sf, plus 5,000 sf of commercial/retail space.
| Nov 1, 2010
John Pearce: First thing I tell designers: Do your homework!
John Pearce, FAIA, University Architect at Duke University, Durham, N.C., tells BD+C’s Robert Cassidy about the school’s construction plans and sustainability efforts, how to land work at Duke, and why he’s proceeding with caution when it comes to BIM.
| Nov 1, 2010
Vancouver’s former Olympic Village shoots for Gold
The first tenants of the Millennium Water development in Vancouver, B.C., were Olympic athletes competing in the 2010 Winter Games. Now the former Olympic Village, located on a 17-acre brownfield site, is being transformed into a residential neighborhood targeting LEED ND Gold. The buildings are expected to consume 30-70% less energy than comparable structures.
| Oct 27, 2010
Grid-neutral education complex to serve students, community
MVE Institutional designed the Downtown Educational Complex in Oakland, Calif., to serve as an educational facility, community center, and grid-neutral green building. The 123,000-sf complex, now under construction on a 5.5-acre site in the city’s Lake Merritt neighborhood, will be built in two phases, the first expected to be completed in spring 2012 and the second in fall 2014.
| Oct 21, 2010
GSA confirms new LEED Gold requirement
The General Services Administration has increased its sustainability requirements and now mandates LEED Gold for its projects.
| Oct 18, 2010
World’s first zero-carbon city on track in Abu Dhabi
Masdar City, the world’s only zero-carbon city, is on track to be built in Abu Dhabi, with completion expected as early as 2020. Foster + Partners developed the $22 billion city’s master plan, with Adrian Smith + Gordon Gill Architecture, Aedas, and Lava Architects designing buildings for the project’s first phase, which is on track to be ready for occupancy by 2015.