flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Electrical installation work completed at Rhode Island DMV

Electrical installation work completed at Rhode Island DMV


By By BD+C Staff | September 16, 2011
Wayne J. Griffin Electric, Inc. (Griffin Electric) has recently completed the electrical installation work at the updated Rhode

Wayne J. Griffin Electric, Inc. (Griffin Electric) has recently completed the electrical installation work at the updated Rhode Island Division of Motor Vehicles (DMV) facility in Cranston, RI.
The facility was renovated in order to better the working environment for DMV employees and streamline the experience for Rhode Island drivers. The 78,000-sf building features many earth-friendly attributes, including high-efficiency mechanical systems and daylight dimming sensors, plus incorporates green building materials such as bamboo and recycled carpeting. For the convenience of drivers, the many types of DMV transactions were distributed on three floors, and enhanced waiting and concession areas were created.
Griffin Electric was responsible for installing new power distribution within the building, in addition to systems for tele/data, security and fire notification.  Providence-based Dimeo Construction Co. was the General Contractor on-site, while Lerner Ladds + Bartel, also of Providence, served as the project Architect, and Creative Environment Corp. Consulting Engineers of East Providence was the Electrical Engineer.
“There are an increasing number of projects awarded to us which are built within the LEED certification parameters,” commented Wayne J. Griffin, President of Griffin Electric. “We are glad to be part of any project that is dedicated to the preservation and sustainability of our environment, through the use of earth-friendly materials and procedures.” BD+C

Related Stories

| Apr 5, 2012

5 tips for a successful door and window retrofit

An exclusive tip sheet to help the Building Team manage door and window retrofits successfully.

| Apr 4, 2012

San Antonio animal hospital earns LEED Platinum certification

Middleman Construction Company builds the city?s first commercial building to earn certification.

| Apr 3, 2012

Product Solutions

Two new PV systems; a lighter shelf; and fire alarm/emergency communication system.

| Apr 3, 2012

Blaine Brownell on innovative materials applications in architecture

Brownell, who was named a BD+C 40 Under 40 in 2006, provides insight regarding emerging material trends and the creative implementation of materials.

| Apr 3, 2012

AGC Glass to reopen shuttered plant

Shuttered since 2008, the plant produces clear and tinted float glass serving architectural glass markets.

| Apr 3, 2012

SSOE acquires MEP Firm CRS Engineering & Design Consultants

The acquisition will expand SSOE’s Southeastern U.S. presence, broaden CRS’s reach to international markets, and provide both firms’ clients access to enhanced services and resources.

| Apr 2, 2012

Mitsubishi unveils ultra-high-speed elevator for Shanghai skyscraper

The operation of the elevator is scheduled to begin in 2014.

| Apr 2, 2012

Sachse Construction helps complete Salt Lake City’s City Creek Center

Sachse was hired to complete store build-outs at City Creek Center.

| Mar 29, 2012

U.K.’s Manchester Airport tower constructed in nine days

Time-lapse video shows construction workers on the jobsite for 222 continuous hours.

| Mar 29, 2012

Roller shade operating system wins IF Product Design Award

Design experts in the iF jury recognized the engineering invested in the RB 500 Roller Shade, including a metal clutch with a patented construction, a durable zamac housing with polished finish, and a chain drive unit that excels in maximum operating comfort.

boombox1
boombox2
native1

More In Category


Sustainable Design and Construction

Northglenn, a Denver suburb, opens a net zero, all-electric city hall with a mass timber structure

Northglenn, Colo., a Denver suburb, has opened the new Northglenn City Hall—a net zero, fully electric building with a mass timber structure. The 32,600-sf, $33.7 million building houses 60 city staffers. Designed by Anderson Mason Dale Architects, Northglenn City Hall is set to become the first municipal building in Colorado, and one of the first in the country, to achieve the Core certification: a green building rating system overseen by the International Living Future Institute.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021