flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Elevator shafts a major source of heat loss in New York City

Codes and Standards

Elevator shafts a major source of heat loss in New York City

A typical New York apartment building loses thousands of dollars worth of energy every year from leaky elevator shafts that vent warm air at the top of the building and draw in cold air at the bottom, according to a new Urban Green Council report.


By Peter Fabris, Contributing Editor | March 29, 2015
Elevator shafts a major source of heat loss in New York City

The report, “Spending Through the Roof,” says that apartment building owners pay an average of $3,400 a year to replace heat lost through the roof. In taller buildings, the cost can be more than $20,000 a year. Illustration: Urban Green Council 

New York City should focus on elevator shafts to improve the energy efficiency standards of its high-rise residences, according to a new report from the Urban Green Council.

A typical New York apartment building loses thousands of dollars worth of energy every year from leaky elevator shafts that vent warm air at the top of the building and draw in cold air at the bottom.

The report, “Spending Through the Roof says that apartment building owners pay an average of $3,400 a year to replace heat lost through the roof. In taller buildings, the cost can be more than $20,000 a year.

Plugging this type of air leak can cost from $500 to $15,000. If the leaks were plugged on 4,000 tall apartment buildings in the city, landlords would collectively save $11 million a year, while keeping 30,000 metric tons of greenhouse gases out of the atmosphere.

Elevator shafts and stairwell openings were required to vent smoke in the case of fire. But construction practices and firefighting techniques have changed, so the vents now "are needlessly open all the time."

Codes governing stairwell vents haven't changed since 1929 so there's no legal way now for building owners to fix the problem. 

Tags

Related Stories

| Feb 17, 2012

AGC advocates for federal procurement reform

Ensure that small business goals take into consideration actual small business capacity in relevant specialty markets.

| Feb 17, 2012

Codes not to blame for Anchorage roof collapses following heavy snows

Design or construction problems likely contributed to the collapses, according to city officials.

| Feb 17, 2012

Comment period opens March 1 for LEED 2012 update

USGBC says that LEED's strength comes from its continuous evolution.

| Feb 17, 2012

OSHA training videos on proper respirator use available online

17 short videos to help workers learn about the proper use of respirators on the job.

| Feb 17, 2012

Union/employer collaboration on the rise aimed at exceeding OSHA safety standards

Unions have learned to help employers win contracts with bids made competitive through good safety practices.

| Feb 16, 2012

Gain greater agility and profitability with ArchiCAD BIM software

White paper was written with the sole purpose of providing accurate, reliable information about critical issues related to BIM and what ArchiCAD with advanced technology such as the GRAPHISOFT BIM Server provide as an answer to address these issues.

| Feb 9, 2012

Initiative to sell off under-used federal property gaining momentum

The bill is similar to a White House planto cut $8 billion worth of building costs by the end of the 2012 fiscal year, and to establish a panel to identify other sites worth selling or donating to nonprofits or state and local governments.

| Feb 9, 2012

Computer tool helps engineers design roof cladding using Canada's building code

Easier to design roof cladding that can withstand winds in a given area. 

| Feb 9, 2012

Webinar focuses on lessons learned from LEED-certified industrial project

This case study will focus on strategies used to save the client money, achieve certification, and effectively market success once the project was complete.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021