The EMerge Alliance – an open industry association leading the rapid adoption of safe direct-current (DC) power distribution standards for commercial buildings – today announced the formation of a new Campus Microgrid Technical Standards Committee at the American Institute of Architects (AIA) 2012 National Convention and Design Exposition.
Chaired by Guy AlLee, of Intel’s Energy Research and Sustainability Labs, the new committee will focus on establishing a standard for the integration of DC microgrids throughout a building or campus. The standard will focus on improved efficiency of integrated on-site power generation, storage, distribution and use by capitalizing on the utilization of native DC power. With input from member organizations, the new Campus Microgrid standard will integrate the other EMerge Alliance standards that enable the use of DC power at various levels and in a variety of spaces. The resulting set of standards will further advance the Alliance’s mission to help building designers and owners achieve greater flexibility, sustainability and savings.
According to EMerge Alliance Chairman Brian Patterson, the Alliance has been working toward a vision of DC microgrids in four key areas – occupied spaces, data and telecommunications centers, building services and outdoor applications – since the organization was founded in 2008.
The Campus Microgrid Technical Standards Committee is open to all Alliance members at the Governing and Participating levels, and will include consideration of power, infrastructure, peripheral device and control applications required to operate a building using DC power. The group is inviting other innovative organizations in the commercial building industry to join and contribute to this groundbreaking standards development effort. +
Related Stories
| Nov 17, 2011
Hollister Construction Services renovating bank in Union City, N.J.
Project is part of a series of ground-up construction and renovation assignments.
| Nov 16, 2011
Project completion of BRAC 132, Office of the Chief Army Reserve Building, Ft. Belvoir, Va.
This fast-tracked, design-build project consists of a three-story, 88,470 sf administrative command building housing approximately 430 employees.
| Nov 16, 2011
Architecture Billings Index moves upward
The Architecture Billings Index climbed nearly three points in October.
| Nov 16, 2011
CRSI recommends return to inch-pound markings
The intention of this resolution is for all new rollings of reinforcing steel products to be marked with inch-pound bar markings no later than January 1st, 2014.
| Nov 16, 2011
John Patelski joins Ghafari as executive vice president
As executive vice president, Patelski will be responsible for expanding the firm’s services in new strategic markets.
| Nov 15, 2011
Struggling economy demands construction industry embrace enterprise-wide risk management
In today’s business environment of high supply and limited demand, it has become especially vital for organizations in the construction sector to effectively manage risk.
| Nov 15, 2011
Suffolk Construction breaks ground on the Victor housing development in Boston
Project team to manage construction of $92 million, 377,000 square-foot residential tower.
| Nov 15, 2011
Miller joins Perkins Eastman as regional manager, Middle East and Northern Africa
Miller joins Perkins Eastman with more than 48 years of experience in architecture, design management, and construction administration for planning and infrastructure.
| Nov 14, 2011
Summit Design+Build selected at GC for new Office Concepts headquarters
The new headquarters will include 17,000 sf of office space and 15,000 sf of warehouse and feature 24 ft ceilings, an open floor plan, two conference rooms and one training room and will feature sustainable finishes throughout.