flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Energy modeling payback typically as short as one to two months

Energy

Energy modeling payback typically as short as one to two months

Energy modeling is a ‘no-brainer—like checking MPG on a car’


By Peter Fabris, Contributing Editor | June 7, 2016

Photo: Phillip Pessar/Creative Commons.

Energy modeling that includes calculating the operational energy savings that accrue after an initial capital investment, has a quick payback—typically one-to-two months, according to Anica Landreneau, director of sustainability consulting with architecture and engineering firm HOK.

With the rule of thumb of a three year or shorter payback to make energy conservation measures cost-effective, modeling is a “no-brainer,” Landreneau told attendees at the Department of Energy’s Better Buildings Summit in Washington, D.C.

For large buildings, modeling costs run from $30,000 to $200,000 depending on the energy conservation measures considered and the tools used to evaluate them. Even the high side of that range is a fraction of the annual energy costs of a typical large building.

Landreneau said modeling is a key tool in maintaining the HOK’s global standing as a high-performance leader. HOK also sees modeling as a mechanism for shifting investment from a building’s active, mechanical systems to its passive, architectural elements.

boombox1
boombox2
native1

More In Category

Engineers

Navigating battery energy storage augmentation

By implementing an augmentation plan upfront, owners can minimize potential delays and unforeseen costs when augmentation needs to occur, according to Burns & McDonnell energy storage technology manager Joshua Crawford.


Sustainable Design and Construction

Northglenn, a Denver suburb, opens a net zero, all-electric city hall with a mass timber structure

Northglenn, Colo., a Denver suburb, has opened the new Northglenn City Hall—a net zero, fully electric building with a mass timber structure. The 32,600-sf, $33.7 million building houses 60 city staffers. Designed by Anderson Mason Dale Architects, Northglenn City Hall is set to become the first municipal building in Colorado, and one of the first in the country, to achieve the Core certification: a green building rating system overseen by the International Living Future Institute.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021