flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Energy research animates science sector [2013 Giants 300 Report]

Energy research animates science sector [2013 Giants 300 Report]

After an era of biology-oriented spending—largely driven by Big Pharma and government concerns about bioterrorism—climate change is reshaping priorities in science and technology construction.


By Julie Higginbotham, Senior Editor | August 8, 2013
The University of CaliforniaBerkeley Energy Biosciences Building, focused on bi
The University of CaliforniaBerkeley Energy Biosciences Building, focused on biofuels, exemplifies multiple S+T sector trends. The $133 million, 113,200-sf lab is sustainably designed (LEED Gold) and integrates diverse disciplines to attack complex problems of global energy. BP supported the initiative with a $500 million, 10-year grant, and has stationed engineers and scientists to work alongside UCBerkeley researchers. SmithGroupJJR designed the project. PHOTO: BRUCE DAMONTE

After an era of biology-oriented spending—largely driven by Big Pharma and government concerns about bioterrorism—climate change is reshaping priorities in science and technology construction. “Engineering and chemistry funding are going up now, as is energy research, which seems to continue to get federal funding,” says Andy Vazzano, FAIA, LEED AP, Science and Technology Practice Leader at SmithGroupJJR. “Meanwhile, the sequester and budget cuts are having a negative impact on NIH funding for biomedical research.”

The focus on human health hasn’t totally faded, with many research universities still building new labs—especially those that tie research to clinical practice. “Anything that begins with ‘trans’ or ‘inter’ is still a major trend,” says Ryan Abbott, Science and Technology Project Director at Sundt Construction and a BD+C “40 Under 40” honoree (Class of 2012). “Translational, interdisciplinary. Modern science is a team sport.”

TOP S&T SECTOR ARCHITECTURE FIRMS

 
2012 S+T Revenue ($)
1 HDR Architecture $91,252,000
2 Perkins+Will $48,373,568
3 HOK $38,347,000
4 Stantec $33,111,469
5 SmithGroupJJR $26,400,000
6 Flad Architects $21,480,000
7 Payette $18,434,029
8 ZGF Architects $16,214,267
9 EwingCole $11,000,000
10 FKP Architects $10,250,000

TOP S&T SECTOR ENGINEERING FIRMS

 
2012 S+T Revenue ($)
1 Affiliated Engineers $19,824,000
2 Middough $13,900,000
3 URS Corp. $11,772,124
4 Bard, Rao + Athanas Consulting Engineers $10,500,000
5 RMF Engineering Design $9,200,000
6 Vanderweil Engineers $7,851,900
7 Paulus, Sokolowski and Sartor $7,500,000
8 WSP USA $5,772,095
9 Science Applications International Corp. $3,103,152
10 STV $2,937,000

TOP S&T SECTOR CONSTRUCTION FIRMS

 
2012 S+T Revenue ($)
1 Skanska USA $376,717,474
2 DPR Construction $298,563,642
3 Suffolk Construction $290,560,307
4 Manhattan Construction $199,444,000
5 Whiting-Turner Contracting Co., The $193,160,425
6 JE Dunn Construction $184,799,051
7 Clark Group $174,348,804
8 Turner Corporation, The $157,490,000
9 Structure Tone $143,798,000
10 Consigli Construction $74,568,263

Though the purpose-built med school building is the iconic face of S+T, adaptive reuse is getting a second look for advantages in cost and speed. Many clients are also seeking higher levels of green; LEED Platinum, once thought impossible for labs, is no longer unique, and clients are increasingly eyeing net-zero.

In addition, look for public/private partnerships to assume a greater role, even in the rarefied atmosphere of the Ivy League. Harvard, for instance, has rethought its Allston science campus during a recession hiatus. When the site cranks up again next year, the program will include a 36-acre, privately developed “enterprise research campus” for related companies in pharma, biotech, and venture capital.

Read BD+C's full Giants 300 Report

Related Stories

| Nov 14, 2011

Griffin Electric completes electrical work at Cary Arts Center

  The Griffin Electric team was responsible for replacing the previous electrical service on-site with a 1000A, 480/277V service and providing electrical feeds for a new fire pump chiller, six air-handlers and two elevators.

| Nov 14, 2011

303 East 33rd Street building achieves LEED-NC

  The 165,000 sf 12-story residential building is the first green development to be LEED certified in the Murray Hill neighborhood of Manhattan.

| Nov 14, 2011

VanSumeren appointed to Traco general manager

VanSumeren will draw on his more than 20 years of experience in manufacturing management and engineering to deliver operational and service excellence and drive profitable growth for Traco. 

| Nov 11, 2011

By the Numbers

What do ‘46.9,’ ‘886.2,’ and ‘171,271’ mean to you? Check here for the answer.

| Nov 11, 2011

Streamline Design-build with BIM

How construction manager Barton Malow utilized BIM and design-build to deliver a quick turnaround for Georgia Tech’s new practice facility.

| Nov 11, 2011

AIA: Engineered Brick + Masonry for Commercial Buildings

Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online exam. 

| Nov 11, 2011

How Your Firm Can Win Federal + Military Projects

The civilian and military branches of the federal government are looking for innovative, smart-thinking AEC firms to design and construct their capital projects. Our sources give you the inside story.

| Nov 10, 2011

BD+C's 28th Annual Reconstruction Awards

A total of 13 projects recognized as part of BD+C's 28th Annual Reconstruction Awards.

| Nov 10, 2011

Grousbeck Center for Students & Technology opens doors

New Perkins School for the Blind Building is dedicated to innovation, interaction, and independence for students.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021