flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

In an era of mixed signals, architects embrace cautious optimism [2013 Giants 300 Report]

In an era of mixed signals, architects embrace cautious optimism [2013 Giants 300 Report]

Are architecture firms finally pulling out of the doldrums? The answer is a tentative yes, according to AIA Chief Economist Kermit Baker.


By Robert Cassidy, Editorial Director | July 15, 2013
Inspired by Arizonas iconic canyon formations, the Health Sciences Education Bu
Inspired by Arizonas iconic canyon formations, the Health Sciences Education Building at the Phoenix Biomedical Campus brings together health sciences education and research programs from the University of Arizona College of Medicine-Phoenix and Northern Arizona University. The Building Team included CO Architects (executive and design architect); Ayers Saint Gross (associate architect); and DPR Construction and Sundt Construction (joint GC).
This article first appeared in the BD+C July 2013 Issue issue of BD+C.
Are architecture firms finally pulling out of the doldrums? The answer is a tentative yes, according to AIA Chief Economist Kermit Baker, PhD, Hon. AIA.
 
Baker points to the AIA’s Architecture Billings Index, a leading economic indicator of construction activity that reflects the approximate nine- to 12-month lag time between architecture billings and construction spending. The ABI experienced its first drop in nine months last April (to 48.6), but bounced back in May to 52.9 (any score above 50 indicates an increase in billings). The new projects inquiry index was 59.1, up slightly from the reading of 58.5 in April.
 
“This rebound is a good sign for the design and construction industry and hopefully means that April’s negative dip was a blip rather than a sign of challenging times to come,” says Baker.  “But there is a resounding sense of uncertainty in the marketplace—from clients to investors and an overall lack of confidence in the general economy—that is continuing to act as a governor on the business development engine for architecture firms.”
 
On a regional basis, the Northeast (at 53.7), West (52.1), and South (50.9) were still positive, while the Midwest lagged, at 47.5. Multifamily residential remains strong, at 52.8, as do institutional (52.2) and mixed practice (51.0), but the commercial/industrial sector is still hurting, at 47.5.

TOP ARCHITECTURE FIRMS

2012 Total Revenue ($)
1 Gensler $807,143,550
2 Perkins+Will $360,300,000
3 NBBJ $187,017,000
4 Kohn Pedersen Fox Associates $153,821,100
5 Perkins Eastman $145,000,000
6 Callison $134,112,565
7 ZGF Architects $107,412,274
8 Corgan $85,377,040
9 Populous $84,000,000
10 HMC Architects $77,986,678
 

TOP ARCHITECTURE/ENGINEERING FIRMS

2012 Total Revenue ($)
1 Stantec $467,254,421
2 HOK $406,780,000
3 HDR Architecture $325,900,000
4 Skidmore, Owings & Merrill $281,686,000
5 IBI Group $252,552,343
6 HKS $240,300,000
7 RTKL Associates $202,823,000
8 Cannon Design $202,000,000
9 SmithGroupJJR $166,600,000
10 DLR Group $116,400,000
“All the roadblocks are easing a bit, but they’re still they’re,” says Baker. “Financing is still a big problem, and banks are still hesitant to make a real estate loan. They’re still gun-shy, so they’re setting the bar high for loan approvals.”
 
SEVERAL SECTORS STILL CLICKING
Looking more closely at specific sectors over the next three years, Baker sees vacancy rates for apartments increasing, from 5.0% today to 5.2% in 2015, and rental rates declining, from 3.8% now to 2.8% in a couple of years—in other words, somewhat negative fundamentals for the multifamily sector.
 
    Giants 300 coverage of Architecture Firms brought to you by Sage www.sageglass.com    
Similarly, revenue per available room at hotels is expected to drop from a high of 6.8% in 2012 and 5.5% currently, to 5.0% in 2014 and 2015. But occupancy rates should remain steady, in the 63% range.
 
Overall, Baker foresees positive fundamentals for several key sectors. The office market should witness declining vacancy rates, from 15.4% in 2012 to 13.6% in 2015, and improved rental rates increases, to 4.0% over the next two years, from 3.5% today. Ditto for retail and industrial/warehouse, where market fundamentals also look positive through 2015, in Baker’s analysis.
 
As for the healthcare sector, the AIA economist says that, in his opinion, the Affordable Care Act can only benefit construction of new facilities. “With 30 or 40 million more Americans coming on to the system, it’s hard to come up with a scenario that’s bad for healthcare construction,” he says. “You’ve got to increase it.”
 
As for education, Baker says he wonders if universities are going to be able to keep up the construction wars for fancy new student unions, recreation centers, and the like. “The little echo boom demographic bubble has passed, and institutions are going to have to be more reasonable” in what they can afford to build, he says. In the K-12 arena, Baker says many schools that were built in the ’60s and ’70s may have to be replaced, whether or not the demographics support the case.
 
GOOD TIME FOR DESIGN FIRMS TO GET INTO ACTION
What do all these numbers mean to architecture firms, whether a boutique or midsize emerging firm, or a Giants300 market leader?
According to Baker, larger firms survived the downturn the best. “We heard a lot of stories of clients trading up, getting big firms to do work for them, firms that wouldn’t have bothered with such clients in the past,” he says.
 
Baker sees the possibility of more consolidation in coming years. “The classic case was the big engineering/architecture firm buying up an architecture firm to broaden the base of its offerings,” says Baker. He thinks more alliances may also be formed in years ahead—an East Coast firm that’s strong in the education sector linking up with a West Coast healthcare leader, for example, to strengthen their overall positions in the national market.
 
Baker, who has been through his share of recessions in his 28-year career as an economist, remains optimistic about the profession of architecture. “I do think it’s a great time to be in the profession, and if you own a firm, you’re going to see modest to firm growth in the next few years.”
 
The downside risk of taking aggressive action has begun to diminish, says Baker. His advice to management of architectural firms: “To the extent that they’ve been thinking about doing something for a while—opening a new office in a promising geographic market, making an acquisition—this is probably a good time to pull the trigger.” 
 

Read BD+C's full Giants 300 Report

Tags

Related Stories

Sustainability | Jul 18, 2024

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.

University Buildings | Jul 17, 2024

University of Louisville Student Success Building will be new heart of engineering program

A new Student Success Building will serve as the heart of the newly designed University of Louisville’s J.B. Speed School of Engineering. The 115,000-sf structure will greatly increase lab space and consolidate student services to one location.

Healthcare Facilities | Jul 16, 2024

Watch on-demand: Key Trends in the Healthcare Facilities Market for 2024-2025

Join the Building Design+Construction editorial team for this on-demand webinar on key trends, innovations, and opportunities in the $65 billion U.S. healthcare buildings market. A panel of healthcare design and construction experts present their latest projects, trends, innovations, opportunities, and data/research on key healthcare facilities sub-sectors. A 2024-2025 U.S. healthcare facilities market outlook is also presented.

K-12 Schools | Jul 15, 2024

A Cleveland suburb opens a $31.7 million new middle school and renovated high school

Accommodating 1,283 students in grades 6-12, the Warrensville, Ohio school complex features flexible learning environments and offers programs ranging from culinary arts and firefighting training to e-sports.

MFPRO+ News | Jul 15, 2024

More permits for ADUs than single-family homes issued in San Diego

Popularity of granny flats growing in California

Codes and Standards | Jul 15, 2024

New York City code update changes definition of a major building

Changes affecting how construction projects in New York City are permitted will have significant impacts for contractors. On Dec. 11, the definition of a major building in the city’s code will change from 10 stories to seven, or 75 feet. The change will affect thousands more projects.

Adaptive Reuse | Jul 12, 2024

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.

University Buildings | Jul 11, 2024

3 considerations for designing healthy, adaptable student dining

Amanda Vigneau, IIDA, NCDIQ, LEED ID+C, Director, Shepley Bulfinch, shares three ways student dining facilities have evolved to match changes in student life.

Healthcare Facilities | Jul 11, 2024

New download: BD+C's 2024 Healthcare Annual Report

Welcome to Building Design+Construction’s 2024 Healthcare Annual Report. This free 66-page special report is our first-ever “state of the state” update on the $65 billion healthcare construction sector.

Transit Facilities | Jul 10, 2024

Historic Fresno train depot to be renovated for California high speed rail station project

A long-shuttered rail station in Fresno, Calif., will be renovated to serve as the city’s high speed rail (HSR) station as part of the California High-Speed Rail Authority system, the nation’s first high speed rail project. California’s HSR system will eventually link more than 800 miles of rail, served by up to 24 stations.

boombox1
boombox2
native1

More In Category

Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021