CHICAGO, IL – March 17, 2011 – ESD (Environmental Systems Design, Inc.), an international leader in the design of high performance building systems, announced senior management changes that include Raj Gupta (a member of BD+C's editorial advisory board) becoming the firm’s chief executive officer, replacing Hem Gupta, who remains chairman, and Kurt Karnatz being named president.
Since Hem Gupta founded ESD in 1967, the firm has grown to be one of the largest consulting engineering firms in the U.S. ESD has been responsible for designing systems for many of Chicago’s iconic buildings and for high profile projects around the world, including UBS Tower, Citadel Center, Hyatt Center and 111 S. Wacker Drive in Chicago; Masdar Headquarters and Emirates Palace Hotel in Abu Dhabi; and several buildings for the King Abdullah Financial District in Riyadh, Kingdom of Saudi Arabia. Mr. Gupta will continue to play an active role as chairman of the board of directors.
As chief executive officer, Raj Gupta oversees all operations and strategic planning for ESD. He joined the firm in 1984 as a mechanical engineer and became vice president of the mechanical engineering department in 1990. In 1993, he was promoted to executive vice president and in 1998 was elected president. Throughout his career Mr. Gupta has led design teams to integrate creative engineering solutions for a wide variety of project types, including governmental, educational, mixed-use, libraries, office buildings, cultural and medical facilities. He is recognized within the industry for his leadership ability and professional and civic contributions. He is a member of the executive committee and a trustee of the Chicago Architecture Foundation, a trustee of the Adler Planetarium, a member of the board of directors of the Advocate Charitable Foundation, a member of the Chicago Council on Global Affairs, and a member of the Young President’s Organization. He is also active as a board member of the Roberts Environmental Center at Claremont McKenna College.
Mr. Gupta is a licensed professional engineer in 33 states and a LEED accredited professional. He earned a masters of science degree in communications from Northwestern University, a bachelors of science in mechanical engineering from Washington University in St. Louis and a bachelors of arts in management engineering from Claremont McKenna College.
Formerly Executive Vice President, Mr. Karnatz has been a driving force within ESD in the development of sustainable, optimized engineering solutions for high performance buildings. He has gained international recognition as a leader within the engineering industry for his ability to bridge a commitment for sustainable design with real world constraints of real estate development. A licensed professional engineer in 21 states, Mr. Karnatz is a registered energy professional in Illinois, a certified energy manager and a LEED accredited professional. He holds a bachelor of science degree in mechanical engineering from the Illinois Institute of Technology.
ESD is a global consulting-engineering firm that focuses on the delivery of high-performance buildings. They deliver value by making healthy and productive environments and by making facilities more cost effective, flexible, reliable, and sustainable. Utilizing an integrative design process, their engineering and design professionals (200+) apply innovative technologies such as energy modeling and BIM (Building Information Modeling) to address owners’ needs. Founded in 1967, the firm is a valued partner for many public and private clients seeking to enrich collaboration through diversity. ESD’s services include: Mechanical, Electrical, Plumbing and Fire Protection Engineering; LEED Certification Consulting; Sustainable Design / Energy Modeling; Commissioning; Technology Systems; and BIM. For more information, please visit: www.esdglobal.com.
Related Stories
Hotel Facilities | Apr 24, 2024
The U.S. hotel construction market sees record highs in the first quarter of 2024
As seen in the Q1 2024 U.S. Hotel Construction Pipeline Trend Report from Lodging Econometrics (LE), at the end of the first quarter, there are 6,065 projects with 702,990 rooms in the pipeline. This new all-time high represents a 9% year-over-year (YOY) increase in projects and a 7% YOY increase in rooms compared to last year.
ProConnect Events | Apr 23, 2024
5 more ProConnect events scheduled for 2024, including all-new 'AEC Giants'
SGC Horizon present 7 ProConnect events in 2024.
Engineers | Apr 23, 2024
AlfaTech names new CEO and COO appointments: Diarmuid Hartley and Tim Chadwick, PE, LEED AP
AlfaTech, a renowned leading provider of sustainable mechanical, electrical and plumbing engineering design, architectural lighting design, and technology services, proudly announces the appointment of Diarmuid Hartley as Chief Executive Officer (CEO) and Tim Chadwick, PE, LEED AP, as Chief Operating Officer (COO). These strategic appointments mark a significant step in AlfaTech's commitment to fortifying its leadership team and adapting to evolving industry demands.
75 Top Building Products | Apr 22, 2024
Enter today! BD+C's 75 Top Building Products for 2024
BD+C editors are now accepting submissions for the annual 75 Top Building Products awards. The winners will be featured in the November/December 2024 issue of Building Design+Construction.
Resiliency | Apr 22, 2024
Controversy erupts in Florida over how homes are being rebuilt after Hurricane Ian
The Federal Emergency Management Agency recently sent a letter to officials in Lee County, Florida alleging that hundreds of homes were rebuilt in violation of the agency’s rules following Hurricane Ian. The letter provoked a sharp backlash as homeowners struggle to rebuild following the devastating 2022 storm that destroyed a large swath of the county.
Mass Timber | Apr 22, 2024
British Columbia changing building code to allow mass timber structures of up to 18 stories
The Canadian Province of British Columbia is updating its building code to expand the use of mass timber in building construction. The code will allow for encapsulated mass-timber construction (EMTC) buildings as tall as 18 stories for residential and office buildings, an increase from the previous 12-story limit.
Standards | Apr 22, 2024
Design guide offers details on rain loads and ponding on roofs
The American Institute of Steel Construction and the Steel Joist Institute recently released a comprehensive roof design guide addressing rain loads and ponding. Design Guide 40, Rain Loads and Ponding provides guidance for designing roof systems to avoid or resist water accumulation and any resulting instability.
Building Materials | Apr 22, 2024
Tacoma, Wash., investigating policy to reuse and recycle building materials
Tacoma, Wash., recently initiated a study to find ways to increase building material reuse through deconstruction and salvage. The city council unanimously voted to direct the city manager to investigate deconstruction options and estimate costs.
Student Housing | Apr 19, 2024
$115 million Cal State Long Beach student housing project will add 424 beds
A new $115 million project recently broke ground at California State University, Long Beach (CSULB) that will add housing for 424 students at below-market rates. The 108,000 sf La Playa Residence Hall, funded by the State of California’s Higher Education Student Housing Grant Program, will consist of three five-story structures connected by bridges.
Construction Costs | Apr 18, 2024
New download: BD+C's April 2024 Market Intelligence Report
Building Design+Construction's monthly Market Intelligence Report offers a snapshot of the health of the U.S. building construction industry, including the commercial, multifamily, institutional, and industrial building sectors. This report tracks the latest metrics related to construction spending, demand for design services, contractor backlogs, and material price trends.