flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

ESD announces senior management changes

ESD announces senior management changes


March 18, 2011

CHICAGO, IL – March 17, 2011 – ESD (Environmental Systems Design, Inc.), an international leader in the design of high performance building systems, announced senior management changes that include Raj Gupta (a member of BD+C's editorial advisory board) becoming the firm’s chief executive officer, replacing Hem Gupta, who remains chairman, and Kurt Karnatz being named president.

Since Hem Gupta founded ESD in 1967, the firm has grown to be one of the largest consulting engineering firms in the U.S.  ESD has been responsible for designing systems for many of Chicago’s iconic buildings and for high profile projects around the world, including UBS Tower, Citadel Center, Hyatt Center and 111 S. Wacker Drive in Chicago; Masdar Headquarters and Emirates Palace Hotel in Abu Dhabi; and several buildings for the King Abdullah Financial District in Riyadh, Kingdom of Saudi Arabia.  Mr. Gupta will continue to play an active role as chairman of the board of directors.

As chief executive officer, Raj Gupta oversees all operations and strategic planning for ESD.  He joined the firm in 1984 as a mechanical engineer and became vice president of the mechanical engineering department in 1990.  In 1993, he was promoted to executive vice president and in 1998 was elected president. Throughout his career Mr. Gupta has led design teams to integrate creative engineering solutions for a wide variety of project types, including governmental, educational, mixed-use, libraries, office buildings, cultural and medical facilities.  He is recognized within the industry for his leadership ability and professional and civic contributions.  He is a member of the executive committee and a trustee of the Chicago Architecture Foundation, a trustee of the Adler Planetarium, a member of the board of directors of the Advocate Charitable Foundation, a member of the Chicago Council on Global Affairs, and a member of the Young President’s Organization.  He is also active as a board member of the Roberts Environmental Center at Claremont McKenna College.

Mr. Gupta is a licensed professional engineer in 33 states and a LEED accredited professional.  He earned a masters of science degree in communications from Northwestern University, a bachelors of science in mechanical engineering from Washington University in St. Louis and a bachelors of arts in management engineering from Claremont McKenna College.

Formerly Executive Vice President, Mr. Karnatz has been a driving force within ESD in the development of sustainable, optimized engineering solutions for high performance buildings.  He has gained international recognition as a leader within the engineering industry for his ability to bridge a commitment for sustainable design with real world constraints of real estate development.  A licensed professional engineer in 21 states, Mr. Karnatz is a registered energy professional in Illinois, a certified energy manager and a LEED accredited professional.  He holds a bachelor of science degree in mechanical engineering from the Illinois Institute of Technology.

ESD is a global consulting-engineering firm that focuses on the delivery of high-performance buildings.  They deliver value by making healthy and productive environments and by making facilities more cost effective, flexible, reliable, and sustainable. Utilizing an integrative design process, their engineering and design professionals (200+) apply innovative technologies such as energy modeling and BIM (Building Information Modeling) to address owners’ needs.  Founded in 1967, the firm is a valued partner for many public and private clients seeking to enrich collaboration through diversity.  ESD’s services include: Mechanical, Electrical, Plumbing and Fire Protection Engineering;  LEED Certification Consulting;  Sustainable Design / Energy Modeling;  Commissioning; Technology Systems; and BIM.  For more information, please visit: www.esdglobal.com.

Related Stories

| Jan 19, 2011

New Fort Hood hospital will replace aging medical center

The Army Corps of Engineers selected London-based Balfour Beatty and St. Louis-based McCarthy to provide design-build services for the Fort Hood Replacement Hospital in Texas, a $503 million, 944,000-sf complex partially funded by the American Recovery and Reinvestment Act. The firm plans to use BIM for the project, which will include outpatient clinics, an ambulance garage, a central utility plant, and three parking structures. Texas firms HKS Architects and Wingler & Sharp will participate as design partners. The project seeks LEED Gold.

| Jan 19, 2011

Museum design integrates Greek history and architecture

Construction is under way in Chicago on the National Hellenic Museum, the nation’s first museum devoted to Greek history and culture. RTKL designed the 40,000-sf limestone and glass building to include such historic references as the covered walkway of classical architecture and the natural wood accents of Byzantine monasteries. The museum will include a research library and oral history center, plus a 3,600-sf rooftop terrace featuring three gardens. The project seeks LEED Silver.

| Jan 19, 2011

Large-Scale Concrete Reconstruction Solid Thinking

Driven by both current economic conditions and sustainable building trends, Building Teams are looking more and more to retrofits and reconstruction as the most viable alternative to new construction. In that context, large-scale concrete restoration projects are playing an important role within this growing specialty.

| Jan 10, 2011

Michael J. Alter, president of The Alter Group: ‘There’s a significant pent-up demand for projects’

Michael J. Alter, president of The Alter Group, a national corporate real estate development firm headquartered in Skokie, Ill., on the growth of urban centers, project financing, and what clients are saying about sustainability.

| Jan 7, 2011

BIM on Target

By using BIM for the design of its new San Clemente, Calif., store, big-box retailer Target has been able to model the entire structural steel package, including joists, in 3D, chopping the timeline for shop drawings from as much as 10 weeks down to an ‘unheard of’ three-and-a-half weeks.

| Jan 7, 2011

How Building Teams Choose Roofing Systems

A roofing survey emailed to a representative sample of BD+C’s subscriber list revealed such key findings as: Respondents named metal (56%) and EPDM (50%) as the roofing systems they (or their firms) employed most in projects. Also, new construction and retrofits were fairly evenly split among respondents’ roofing-related projects over the last couple of years.

| Jan 7, 2011

Total construction to rise 5.1% in 2011

Total U.S. construction spending will increase 5.1% in 2011. The gain from the end of 2010 to the end of 2011 will be 10%. The biggest annual gain in 2011 will be 10% for new residential construction, far above the 2-3% gains in all other construction sectors.

| Jan 7, 2011

Mixed-Use on Steroids

Mixed-use development has been one of the few bright spots in real estate in the last few years. Successful mixed-use projects are almost always located in dense urban or suburban areas, usually close to public transportation. It’s a sign of the times that the residential component tends to be rental rather than for-sale.

| Jan 4, 2011

Product of the Week: Zinc cladding helps border crossing blend in with surroundings

Zinc panels provide natural-looking, durable cladding for an administrative building and toll canopies at the newly expanded Queenstown Plaza U.S.-Canada border crossing at the Niagara Gorge. Toronto’s Moriyama & Teshima Architects chose the zinc alloy panels for their ability to blend with the structures’ scenic surroundings, as well as for their low maintenance and sustainable qualities. The structures incorporate 14,000 sf of Rheinzink’s branded Angled Standing Seam and Reveal Panels in graphite gray.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021