The I CAN Child Care & Learning Center, Hampton, Va., is proof that good things come in small, economical packages. This 9,000-sf facility, built at a cost of $206/sf by Mark Turner Construction, a minority-owned CM firm, provides much-needed daycare primarily to families of local military personnel and shipyard workers.
Recognizing that I CAN had outgrown its previous facility located in a strip mall, the owners, a minority-run business, secured a long-abandoned site once used for vehicle auctions.
Two problems quickly emerged: high concentrations of arsenic in the soil, and stormwater runoff into nearby wetlands and neighboring properties.
The usual approach to remediating tainted soil would have been excavation and removal. To hold down costs, the project team elected to encapsulate the infected soil with additional landscaping and hardscape. As for the runoff problem, the team worked with city officials to reconfigure the site layout and convert large portions of impervious coverage into pervious area.
The new facility has eight classrooms with built-in AV and security systems, a library, office space, a kitchen, a staff break room, and play areas. Doors open at 6:30 a.m. to meet the needs of local military and shipbuilding families.
Cost-efficient finishes, such as seal concrete in the kitchen, kept the project on budget, but not at the cost of quality. Luxury vinyl tile, level 5 gypsum wallboard, solid surface countertops, vibrant artwork, energy-efficient windows and appliances, high-SEER HVAC, and water-saving plumbing fixtures speak to the quality of materials and construction.
The center serves children ages six weeks to five years. Since opening last fall, I CAN’s enrollment has gone up, and more teachers have been hired.+
Building Team — Submitting firm Mark Turner Construction (CM), Owner I CAN Child Care & Learning Center, Architect PMA, Inc., SE Speight, Marshall & Francis, MEP ENGINEER Hickman Ambrose, Inc.
General information — Size 9,000 sf, Construction cost $1.85 million, Construction time March 2018 to September 2018, Delivery method CM at risk
Return to the Building Team Awards landing page
Related Stories
Building Team Awards | Apr 9, 2015
IPD-driven fusion facility serves science and student life in Chicago
In dire need of modern science labs and a student union, North Park University built both—in the same building.
Building Team Awards | Apr 9, 2015
‘Prudent, not opulent’ sets the tone for this Catholic hospital
This Building Team stuck with a project for seven years to get a new hospital built for a faithful client.
Building Team Awards | Apr 9, 2015
9/11 museum triumphs over controversy
The Building Team for this highly visible project had much more than design, engineering, and construction problems to deal with.
Building Team Awards | Apr 7, 2015
Unique test facility will help make wind power more feasible
A new facility at Clemson University makes it possible to test the huge stresses that large-scale wind turbines must be able to withstand.
Building Team Awards | Apr 5, 2015
UK's leading foot and mouth disease lab turns containment design inside out
A daring Building Team breaks the bunker mentality common to research containment with this light-filled, open facility in the English countryside.
Building Team Awards | Apr 5, 2015
‘Project first’ philosophy shows team’s commitment to a true IPD on the San Carlos Center
Skanska and NBBJ join forces with Sutter Health on a medical center project where all three parties share the risk.