February 13, 2013 – EYP Energy, a division of EYP, Inc., today announced a strategic merger with The Weidt Group, one of the nation's premiere building energy consulting firms, currently headquartered in Minnesota. The merger will expand upon EYP Energy’s 30 years of experience and diversified platform of energy related services. With staff members in four offices in Minnesota, Colorado, Iowa, and Wisconsin, The Weidt Group will further elevate EYP Energy’s portfolio, while continuing to offer services to their client networks under their well-respected brand name.
An internationally recognized energy and software consulting firm, The Weidt Group brings proprietary energy software modeling tools, energy benchmarking, and software development capabilities to complement EYP Energy’s analysis, implementation, and commissioning expertise.The Weidt Group partners with design teams, building owners, manufacturers, utility companies, and state and local governments on the design and operation of high-performance buildings. It also provides energy design assistance and measurement & verification services for institutional and commercial clients, as well as energy benchmarks for improving the ongoing performance of existing buildings. Additionally, The Weidt Group is a current market leader in energy efficiency software design, creating sophisticated energy information delivery tools that convert data into knowledge, based on modeled, measured, and tracked building performance. On a yearly basis, The Weidt Group has helped reduce air pollution by nearly 1000 kilotons while saving building owners and operators over $94 million annually.
"Energy efficiency represents a core growth market for EYP Energy, and The Weidt Group is the nation’s top provider of consulting services for that market," commented EYP President and CEO Tom Birdsey, AIA, LEED AP. "They bring tremendous expertise to the table, particularly in predicting and monitoring energy performance of complex building design and construction projects. The Weidt Group’s powerful B3 Benchmarking software is a game changer and an industry first, providing clients the key to unlocking energy design and savings to give them the valuable information they need to significantly reduce their overall energy usage.” He added, “Merging with The Weidt Group serves as a catalyst for the transformation of our growing energy group, ultimately strengthening our long-standing commitment to the intelligent use of buildings.”
Tom McDougall, President of The Weidt Group said, "Clients don't hire firms; they hire experts. Both EYP Energy and The Weidt Group employ many of the nation’s most respected professionals. Working together, the possibilities are endless." He added, “The Weidt Group staff consists of highly skilled analysts with broad technical expertise and management experience. We look forward to combining our expertise with that of EYP Energy to contribute to the future growth of our energy efficiency business. Our entire senior leadership is excited about this transition, and look forward to serving as an active part of the firm moving forward.”
Founded in 1977, The Weidt Group was established to account for and manage the environmental impacts of building design and construction. By 1985, The Weidt Group began to emerge as a pioneering software design firm creating tools for architects, engineers, utilities and manufacturers. Weidt is a market leader in object-oriented software—creating virtual products to model and manage complexities of the real world. For more information about The Weidt Group, visit www.twgi.com.
EYP Energy is a divisionof EYP, Inc., that delivers comprehensive energy and sustainability services. www.eypenergy.com. EYP, Inc. is a global provider of comprehensive building and design related consulting services to a broad range of markets, including education, government, healthcare, and corporate. With employees located across the country in twelve offices, it is a recognized leader in all of the key markets that it serves. Prominently ranked on numerous industry “best of” lists, EYP successfully delivers expertise-driven services to clients around the world.
Related Stories
Student Housing | Apr 19, 2024
$115 million Cal State Long Beach student housing project will add 424 beds
A new $115 million project recently broke ground at California State University, Long Beach (CSULB) that will add housing for 424 students at below-market rates. The 108,000 sf La Playa Residence Hall, funded by the State of California’s Higher Education Student Housing Grant Program, will consist of three five-story structures connected by bridges.
Construction Costs | Apr 18, 2024
New download: BD+C's April 2024 Market Intelligence Report
Building Design+Construction's monthly Market Intelligence Report offers a snapshot of the health of the U.S. building construction industry, including the commercial, multifamily, institutional, and industrial building sectors. This report tracks the latest metrics related to construction spending, demand for design services, contractor backlogs, and material price trends.
MFPRO+ New Projects | Apr 16, 2024
Marvel-designed Gowanus Green will offer 955 affordable rental units in Brooklyn
The community consists of approximately 955 units of 100% affordable housing, 28,000 sf of neighborhood service retail and community space, a site for a new public school, and a new 1.5-acre public park.
Construction Costs | Apr 16, 2024
How the new prevailing wage calculation will impact construction labor costs
Looking ahead to 2024 and beyond, two pivotal changes in federal construction labor dynamics are likely to exacerbate increasing construction labor costs, according to Gordian's Samuel Giffin.
Healthcare Facilities | Apr 16, 2024
Mexico’s ‘premier private academic health center’ under design
The design and construction contract for what is envisioned to be “the premier private academic health center in Mexico and Latin America” was recently awarded to The Beck Group. The TecSalud Health Sciences Campus will be located at Tec De Monterrey’s flagship healthcare facility, Zambrano Hellion Hospital, in Monterrey, Mexico.
Market Data | Apr 16, 2024
The average U.S. contractor has 8.2 months worth of construction work in the pipeline, as of March 2024
Associated Builders and Contractors reported today that its Construction Backlog Indicator increased to 8.2 months in March from 8.1 months in February, according to an ABC member survey conducted March 20 to April 3. The reading is down 0.5 months from March 2023.
Laboratories | Apr 15, 2024
HGA unveils plans to transform an abandoned rock quarry into a new research and innovation campus
In the coastal town of Manchester-by-the-Sea, Mass., an abandoned rock quarry will be transformed into a new research and innovation campus designed by HGA. The campus will reuse and upcycle the granite left onsite. The project for Cell Signaling Technology (CST), a life sciences technology company, will turn an environmentally depleted site into a net-zero laboratory campus, with building electrification and onsite renewables.
Codes and Standards | Apr 12, 2024
ICC eliminates building electrification provisions from 2024 update
The International Code Council stripped out provisions from the 2024 update to the International Energy Conservation Code (IECC) that would have included beefed up circuitry for hooking up electric appliances and car chargers.
Urban Planning | Apr 12, 2024
Popular Denver e-bike voucher program aids carbon reduction goals
Denver’s e-bike voucher program that helps citizens pay for e-bikes, a component of the city’s carbon reduction plan, has proven extremely popular with residents. Earlier this year, Denver’s effort to get residents to swap some motor vehicle trips for bike trips ran out of vouchers in less than 10 minutes after the program opened to online applications.
Laboratories | Apr 12, 2024
Life science construction completions will peak this year, then drop off substantially
There will be a record amount of construction completions in the U.S. life science market in 2024, followed by a dramatic drop in 2025, according to CBRE. In 2024, 21.3 million sf of life science space will be completed in the 13 largest U.S. markets. That’s up from 13.9 million sf last year and 5.6 million sf in 2022.