flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

EYP Energy and The Weidt Group merge

EYP Energy and The Weidt Group merge


February 13, 2013

February 13, 2013 – EYP Energy, a division of EYP, Inc., today announced a strategic merger with The Weidt Group, one of the nation's premiere building energy consulting firms, currently headquartered in Minnesota. The merger will expand upon EYP Energy’s 30 years of experience and diversified platform of energy related services. With staff members in four offices in Minnesota, Colorado, Iowa, and Wisconsin, The Weidt Group will further elevate EYP Energy’s portfolio, while continuing to offer services to their client networks under their well-respected brand name.

An internationally recognized energy and software consulting firm, The Weidt Group brings proprietary energy software modeling tools, energy benchmarking, and software development capabilities to complement EYP Energy’s analysis, implementation, and commissioning expertise.The Weidt Group partners with design teams, building owners, manufacturers, utility companies, and state and local governments on the design and operation of high-performance buildings. It also provides energy design assistance and measurement & verification services for institutional and commercial clients, as well as energy benchmarks for improving the ongoing performance of existing buildings. Additionally, The Weidt Group is a current market leader in energy efficiency software design, creating sophisticated energy information delivery tools that convert data into knowledge, based on modeled, measured, and tracked building performance. On a yearly basis, The Weidt Group has helped reduce air pollution by nearly 1000 kilotons while saving building owners and operators over $94 million annually.

"Energy efficiency represents a core growth market for EYP Energy, and The Weidt Group is the nation’s top provider of consulting services for that market," commented EYP President and CEO Tom Birdsey, AIA, LEED AP. "They bring tremendous expertise to the table, particularly in predicting and monitoring energy performance of complex building design and construction projects. The Weidt Group’s powerful B3 Benchmarking software is a game changer and an industry first, providing clients the key to unlocking energy design and savings to give them the valuable information they need to significantly reduce their overall energy usage.” He added, “Merging with The Weidt Group serves as a catalyst for the transformation of our growing energy group, ultimately strengthening our long-standing commitment to the intelligent use of buildings.”

Tom McDougall, President of The Weidt Group said, "Clients don't hire firms; they hire experts. Both EYP Energy and The Weidt Group employ many of the nation’s most respected professionals. Working together, the possibilities are endless." He added, “The Weidt Group staff consists of highly skilled analysts with broad technical expertise and management experience. We look forward to combining our expertise with that of EYP Energy to contribute to the future growth of our energy efficiency business. Our entire senior leadership is excited about this transition, and look forward to serving as an active part of the firm moving forward.”

Founded in 1977, The Weidt Group was established to account for and manage the environmental impacts of building design and construction. By 1985, The Weidt Group began to emerge as a pioneering software design firm creating tools for architects, engineers, utilities and manufacturers. Weidt is a market leader in object-oriented software—creating virtual products to model and manage complexities of the real world. For more information about The Weidt Group, visit www.twgi.com.

EYP Energy is a divisionof EYP, Inc., that delivers comprehensive energy and sustainability services. www.eypenergy.com. EYP, Inc. is a global provider of comprehensive building and design related consulting services to a broad range of markets, including education, government, healthcare, and corporate. With employees located across the country in twelve offices, it is a recognized leader in all of the key markets that it serves. Prominently ranked on numerous industry “best of” lists, EYP successfully delivers expertise-driven services to clients around the world.

Related Stories

| Aug 11, 2010

Florida mixed-use complex includes retail, residential

The $325 million Atlantic Plaza II lifestyle center will be built on 8.5 acres in Delray Beach, Fla. Designed by Vander Ploeg & Associates, Boca Raton, the complex will include six buildings ranging from three to five stories and have 182,000 sf of restaurant and retail space. An additional 106,000 sf of Class A office space and a residential component including 197 apartments, townhouses, ...

| Aug 11, 2010

Restoration gives new life to New Formalism icon

The $30 million upgrade, restoration, and expansion of the Mark Taper Forum in Los Angeles was completed by the team of Rios Clementi Hale Studios (architect), Harley Ellis Devereaux (executive architect/MEP), KPFF (structural engineer), and Taisei Construction (GC). Work on the Welton Becket-designed 1967 complex included an overhaul of the auditorium, lighting, and acoustics.

| Aug 11, 2010

Best AEC Firms to Work For

2006 FreemanWhite Hnedak Bobo Group McCarthy Building Companies, Inc. Shawmut Design and Construction Walter P Moore 2007 Anshen+Allen Arup Bovis Lend Lease Cannon Design Jones Lang LaSalle Perkins+Will SmithGroup SSOE, Inc. Timothy Haahs & Associates, Inc. 2008 Gilbane Building Co. HDR KJWW Engineering Consultants Lord, Aeck & Sargent Mark G.

| Aug 11, 2010

High-Performance Workplaces

Building Teams around the world are finding that the workplace is changing radically, leading owners and tenants to reinvent corporate office buildings to compete more effectively on a global scale. The good news is that this means more renovation and reconstruction work at a time when new construction has stalled to a dribble.

| Aug 11, 2010

Great Solutions: Business Management

22. Commercial Properties Repositioned for University USE Tocci Building Companies is finding success in repositioning commercial properties for university use, and it expects the trend to continue. The firm's Capital Cove project in Providence, R.I., for instance, was originally designed by Elkus Manfredi (with design continued by HDS Architects) to be a mixed-use complex with private, market-...

| Aug 11, 2010

Nurturing the Community

The best seat in the house at the new Seahawks Stadium in Seattle isn't on the 50-yard line. It's in the southeast corner, at the very top of the upper bowl. "From there you have a corner-to-corner view of the field and an inspiring grasp of the surrounding city," says Kelly Kerns, project leader with architect/engineer Ellerbe Becket, Kansas City, Mo.

| Aug 11, 2010

AIA Course: Historic Masonry — Restoration and Renovation

Historic restoration and preservation efforts are accelerating throughout the U.S., thanks in part to available tax credits, awards programs, and green building trends. While these projects entail many different building components and systems, façade restoration—as the public face of these older structures—is a key focus. Earn 1.0 AIA learning unit by taking this free course from Building Design+Construction.

| Aug 11, 2010

BIM adoption tops 80% among the nation's largest AEC firms, according to BD+C's Giants 300 survey

The nation's largest architecture, engineering, and construction companies are on the BIM bandwagon in a big way, according to Building Design+Construction's premier Top 50 BIM Adopters ranking, published as part of the 2009 Giants 300 survey. Of the 320 AEC firms that participated in Giants survey, 83% report having at least one BIM seat license in house, half have more than 30 seats, and near...

| Aug 11, 2010

World's tallest all-wood residential structure opens in London

At nine stories, the Stadthaus apartment complex in East London is the world’s tallest residential structure constructed entirely in timber and one of the tallest all-wood buildings on the planet. The tower’s structural system consists of cross-laminated timber (CLT) panels pieced together to form load-bearing walls and floors. Even the elevator and stair shafts are constructed of prefabricated CLT.

| Aug 11, 2010

Integrated Project Delivery builds a brave, new BIM world

Three-dimensional information, such as that provided by building information modeling, allows all members of the Building Team to visualize the many components of a project and how they work together. BIM and other 3D tools convey the idea and intent of the designer to the entire Building Team and lay the groundwork for integrated project delivery.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021