flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Failed landmark preservation effort in Chicago provides lessons for planners

Codes and Standards

Failed landmark preservation effort in Chicago provides lessons for planners

Gentrification fears heightened among Pilsen neighborhood residents doomed ambitious preservation plan.


By Peter Fabris, Contributing Editor | April 19, 2021

Courtesy Pixabay

A plan to preserve one of Chicago’s most rapidly gentrifying neighborhoods ended in failure when it could not generate community support.

The Pilsen neighborhood, home to Eastern European immigrants in the 19th century and later to newcomers from Mexico, includes ornate “Bohemian Baroque” buildings with brilliant murals expressing the area’s Mexican heritage. The city proposed establishing a historic district to protect more than 850 buildings in Pilsen, but was not able to assuage concerns from neighborhood residents.

The historic district was a part of a larger preservation strategy that included housing supports, economic development measures, park space, and more. Other than some financial support, though, the other measures stalled, prompting suspicion in the neighborhood.

Residents strongly opposed the strategy, fearing that landmarking would not provide relief from displacement and gentrification. Part of the problem: design guidelines on how historic building elements had to be maintained according to the district’s standards were never completed and the city could not present a good estimation on the costs of building repairs nor on the value of incentives that would be available to make repairs.

An important lesson for preservationists is the need to partner with more community development organizations, social justice organizations, housing developers, and planners.

Related Stories

Adaptive Reuse | Oct 26, 2020

Mall property redevelopments could result in dramatic property value drops

Retail conversions to fulfillment centers, apartments, schools, or medical offices could cut values 60% to 90%.

Codes and Standards | Oct 26, 2020

New seismic provisions for the National Earthquake Hazards Reduction Program released

The provisions present a set of recommended improvements to the ASCE/SEI 7-16 Standard.

Codes and Standards | Oct 22, 2020

More than 130 building projects have engaged LEED’s Safety First Credits in response to COVID-19

Best practices helping companies develop and measure healthy, sustainable, and resilient reopening efforts.

Codes and Standards | Oct 21, 2020

New technologies and techniques can ‘future-proof’ buildings

Net-zero principles may give buildings longer lives.

Codes and Standards | Oct 20, 2020

Updated AIA Contractor’s Qualification Statement and Warranty Bond documents available

Statement now includes safety protocols and plans, sustainability, and BIM experience.

Codes and Standards | Oct 19, 2020

NEXT Coalition chooses five pilot projects to fight COVID-19 on jobsites

Mobile platforms, wearable sensors, AI video systems among the trial solutions.

Codes and Standards | Oct 15, 2020

Neighborhoods Now offers cost-effective, DIY designs in response to COVID-19 pandemic

Designs include barriers for outdoor dining, sidewalk retail displays, and modular seating for public spaces.

Codes and Standards | Oct 14, 2020

Standard contract document for prefab and modular building released

ConsensusDocs addresses the most common prefabricated construction use-case scenario.

Codes and Standards | Oct 13, 2020

Austin is first major Texas city to adopt wildfire code

New ordinance based on the International Wildland-Urban Interface Code.

Codes and Standards | Oct 12, 2020

Guidance offered for K-12 schools to support students with asthma

Green purchasing policies for cleaning, filters, furniture and other products encouraged.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021