flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Fake architect caught in ‘Operation Vandelay Industries’ sentenced to 2 1/3 to 7 years in prison

Architects

Fake architect caught in ‘Operation Vandelay Industries’ sentenced to 2 1/3 to 7 years in prison

The fake architect must also pay a $115,000 restitution.


By David Malone, Associate Editor | September 6, 2017
A man's hands handcuffed behind his back

Pixabay Public Domain

Goodbye, Newman.

In a case saturated in pop culture references, a fake architect named Paul J. Newman has been sentenced to 2 1/3 to 7 years in prison after he was caught in a New York state fraud investigation dubbed “Operation Vandelay Industries,” a reference to the 90’s sitcom Seinfeld.

Newman was sentenced on Sept. 5 after pleading guilty to six felonies that included grand larceny and fraud, the Associated Press reports. As part of his sentence, Newman must pay a $115,000 restitution.

According to Attorney General Eric Schneiderman’s office, Newman rendered fraudulent architectural services in Albany, Rensselaer, and Saratoga counties dating back to 2010. His victims include municipalities and businesses.

For those not well versed in the show about nothing’s running gags, Art Vandelay, a phony architect, was the alias of George Costanza. Vandelay Industries later became a fictional company on the show. Seinfeld’s Newman, meanwhile, was Jerry Seinfeld’s arch nemesis.

Tags

Related Stories

| Jun 8, 2012

Allsteel names Kris Yates to head architectural products group

Yates is responsible for the start up, launch and ongoing sales and marketing of Allsteel’s new Beyond movable walls.

| Jun 8, 2012

Chestnut Hill College dedicates Jack and Rosemary Murphy Gulati complex

Casaccio Yu Architects designed the 11,300-sf fitness and social complex.

| Jun 7, 2012

Waterline exhibition displays visions for re-thinking the Chicago River

The designs of Waterline showcase why the Chicago River should once again be considered the city’s most important asset and sets the stage for increased awareness, education and reinvention of the River.

| Jun 7, 2012

WDMA and FMA to affiliate and integrate operations

Over the coming months both organizations will begin the process of formalizing the details of the agreement for final approval by both organizations, with the formal change expected to take effect in January 2015.

| Jun 7, 2012

Craig joins Cannon Design as associate principal

Craig will work closely with the firm's Corporate/Commercial Interiors leadership to help facilitate initiatives that strengthen awareness around workplace innovation and offer counsel on strategic workplace decisions.

| Jun 7, 2012

Stantec publishes 2011 corporate Sustainability Report

Stantec's fifth annual Sustainability Report was prepared in accordance with the internationally recognized G3.1 Sustainability Reporting Guidelines, developed by the Global Reporting Initiative.

| Jun 6, 2012

KPF designs tower for Yongsan IBD

The master plan, created by Studio Daniel Libeskind, is a dynamic urban environment containing contributions from 19 different architects practicing in diverse locations around the globe.

| Jun 6, 2012

SOM urges Chicago tenants to partner with landlords to cut energy use

Tenants can exceed building energy challenge targets recently announced by Mayor Emanuel.

| Jun 6, 2012

KLMK Group awarded contract with Parkland Health & Hospital System in Texas

KLMK will also provide planning guidance in all aspects of the project related to facility activation.

| Jun 5, 2012

Cannon Design joins forces with Peter Ellis New Cities

Peter Ellis will now lead Cannon Design's urban planning and city design practice in collaboration with the firm's executive leadership.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021