The Frank Lloyd Wright Foundation today began a formal search for a new Director of the Frank Lloyd Wright School of Architecture. The appointment, which has become available for only the fifth time in the school’s venerable 82-year history, will be the first in a series of efforts by the school aimed at challenging established pedagogical models of architectural education.
“We are remaking the Frank Lloyd Wright School of Architecture, and we are looking for a Director with the energy and vision to help guide the process” said Sean Malone, President and CEO of the Frank Lloyd Wright Foundation. “This is an extraordinary opportunity and we are looking for an extraordinary person to grab it.”
The new Director will be the Chief Academic Officer of the Frank Lloyd Wright Foundation and will be responsible for the School of Architecture’s pedagogical direction, academic programs, personnel, students, finances, and reputation. The Director will also play a strong leadership role in the broader programs of the Foundation and is expected to set the intellectual tone for the School, engaging in contemporary architectural and design discourse at the national and international level.
Victor Sidy, who has led the School of Architecture since 2005, will be stepping down after the next Director is in place to allow him to return to his architectural practice, which engages in projects ranging from residential to educational and cultural facilities.
“We think it’s time to renew our commitment to discovery and invention, and we’re looking for a leader who is ready to speak to a profession in need of direction,” says Reed Kroloff, chair of the Director Search Committee. “We don’t want someone who designs like Wright. We want someone who can think as boldly as he did.”
Letters of interest and resume/qualifications should be sent to Courtney Larsen at clarsen@franklloydwright.org. Review of applications will begin on January 6, 2014 and will continue until the position is filled.
About the Frank Lloyd Wright School of Architecture
Founded by Frank Lloyd Wright in 1932 as an alternative to traditional architectural education, the Frank Lloyd Wright School of Architecture today provides a fully accredited professional Master of Architecture (M.Arch) degree in an intensive, in-residence academic environment. Students explore the discipline through one-on-one interaction with faculty and through work in the design studio, through architectural practice, and on design-build projects. The students’ educational experience is closely linked to its two architecturally stunning campuses, the main Arizona campus (Taliesin West) and the summer Wisconsin campus (Taliesin).
About the Frank Lloyd Wright Foundation
The Frank Lloyd Wright Foundation's vision is to be a leading, global, multi-disciplinary center for education, scholarship, debate and research committed to the place of architecture and arts in enriching the quality and dignity of life. The Foundation is dedicated to the preservation and stewardship of Taliesin in Spring Green, Wisconsin, Taliesin West in Scottsdale, Arizona and the Taliesin Collections, to shaping architecture and design at the highest level and to transforming people’s lives through the living experience of Frank Lloyd Wright’s body of work. www.franklloydwright.org
Related Stories
Student Housing | Apr 19, 2024
$115 million Cal State Long Beach student housing project will add 424 beds
A new $115 million project recently broke ground at California State University, Long Beach (CSULB) that will add housing for 424 students at below-market rates. The 108,000 sf La Playa Residence Hall, funded by the State of California’s Higher Education Student Housing Grant Program, will consist of three five-story structures connected by bridges.
Construction Costs | Apr 18, 2024
New download: BD+C's April 2024 Market Intelligence Report
Building Design+Construction's monthly Market Intelligence Report offers a snapshot of the health of the U.S. building construction industry, including the commercial, multifamily, institutional, and industrial building sectors. This report tracks the latest metrics related to construction spending, demand for design services, contractor backlogs, and material price trends.
MFPRO+ New Projects | Apr 16, 2024
Marvel-designed Gowanus Green will offer 955 affordable rental units in Brooklyn
The community consists of approximately 955 units of 100% affordable housing, 28,000 sf of neighborhood service retail and community space, a site for a new public school, and a new 1.5-acre public park.
Construction Costs | Apr 16, 2024
How the new prevailing wage calculation will impact construction labor costs
Looking ahead to 2024 and beyond, two pivotal changes in federal construction labor dynamics are likely to exacerbate increasing construction labor costs, according to Gordian's Samuel Giffin.
Healthcare Facilities | Apr 16, 2024
Mexico’s ‘premier private academic health center’ under design
The design and construction contract for what is envisioned to be “the premier private academic health center in Mexico and Latin America” was recently awarded to The Beck Group. The TecSalud Health Sciences Campus will be located at Tec De Monterrey’s flagship healthcare facility, Zambrano Hellion Hospital, in Monterrey, Mexico.
Market Data | Apr 16, 2024
The average U.S. contractor has 8.2 months worth of construction work in the pipeline, as of March 2024
Associated Builders and Contractors reported today that its Construction Backlog Indicator increased to 8.2 months in March from 8.1 months in February, according to an ABC member survey conducted March 20 to April 3. The reading is down 0.5 months from March 2023.
Laboratories | Apr 15, 2024
HGA unveils plans to transform an abandoned rock quarry into a new research and innovation campus
In the coastal town of Manchester-by-the-Sea, Mass., an abandoned rock quarry will be transformed into a new research and innovation campus designed by HGA. The campus will reuse and upcycle the granite left onsite. The project for Cell Signaling Technology (CST), a life sciences technology company, will turn an environmentally depleted site into a net-zero laboratory campus, with building electrification and onsite renewables.
Codes and Standards | Apr 12, 2024
ICC eliminates building electrification provisions from 2024 update
The International Code Council stripped out provisions from the 2024 update to the International Energy Conservation Code (IECC) that would have included beefed up circuitry for hooking up electric appliances and car chargers.
Urban Planning | Apr 12, 2024
Popular Denver e-bike voucher program aids carbon reduction goals
Denver’s e-bike voucher program that helps citizens pay for e-bikes, a component of the city’s carbon reduction plan, has proven extremely popular with residents. Earlier this year, Denver’s effort to get residents to swap some motor vehicle trips for bike trips ran out of vouchers in less than 10 minutes after the program opened to online applications.
Laboratories | Apr 12, 2024
Life science construction completions will peak this year, then drop off substantially
There will be a record amount of construction completions in the U.S. life science market in 2024, followed by a dramatic drop in 2025, according to CBRE. In 2024, 21.3 million sf of life science space will be completed in the 13 largest U.S. markets. That’s up from 13.9 million sf last year and 5.6 million sf in 2022.