flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Fenestration Alliance updates standard for mulled combination assemblies

Codes and Standards

Fenestration Alliance updates standard for mulled combination assemblies

Last updated in 2010, document describes procedures and requirements for air leakage, water resistance, and structural performance.


By Peter Fabris, Contributing Editor | February 1, 2021

Courtesy Pixabay

The Fenestration and Glazing Industry Alliance (FGIA) updated a mulled assemblies document: AAMA 450-20, Performance Rating Method for Mulled Combination Assemblies, Composite Units, and Other Mulled Fenestration Systems.

The document was last updated in 2010. The performance rating method describes procedures and requirements for determining the air leakage, water resistance, and structural performance of mulled fenestration systems.

The document includes test procedures and calculation procedures for determining the performance of mulled fenestration systems. Mulled fenestration systems may be factory assembled or assembled onsite with parts and instructions supplied by the product manufacturer.

“The North American Fenestration Standard says that ‘mullion ratings shall be determined according to the requirements and procedures of AAMA 450 for both composite units and mulled combination assemblies.’ However, until now, AAMA 450 provided no guidance for composite units,” said Dave Goldsmith (PlyGem), co-chair of the FGIA Requirements for Mulled and Combination Window Assembly Update Task Group. “This document will put powerful new tools into the hands of engineers to assist them in determining how to construct structurally sound and weatherproof fenestration products in the most economical ways, and should also drastically reduce the amount of testing required to validate a large variety of composite unit configurations,” Goldsmith said.

Related Stories

| Oct 31, 2012

Investigators look into crane severely damaged by Sandy in Manhattan

Investigators are examining a construction crane collapse atop a $1.5 billion luxury high-rise in midtown Manhattan due to high winds during Hurricane Sandy.

| Oct 31, 2012

Construction error suspected in Miami-Dade College garage collapse

A construction error is the chief suspect in the partial collapse of a parking garage at Miami-Dade College in Doral, FL.

| Oct 31, 2012

New European laws on timber will go into effect in March 2013

A new European Union timber regulation prohibits the “placing on the market of illegally harvested timber or timber products derived from such timber.”

| Oct 31, 2012

MIT models show roofs' capacity for solar energy in Cambridge, Mass.

A new mapping tool from the Massachusetts Institute of Technology and a Boston design firm can calculate rooftops' capacity for solar energy.

| Oct 31, 2012

Demand for living roofs, walls to reach $7.7 billion by 2017

The demand for green roofs and living walls is expected to climb from $5.3 billion in 2011 to $7.7 billion in 2017, according to a report from Lux Research.

| Oct 25, 2012

Philadelphia councilmen move to crack down on contractors working without licenses, permits

Two Philadelphia city councilmen are trying to crack down on the "underground economy" of developers and contractors who work without licenses and permits, pay cash under the table, and operate unsafe job sites.

| Oct 25, 2012

OSHA and NIOSH offer Spanish version of nail gun safety document

The Occupational Safety and Health Administration and the National Institute for Occupational Safety and Health have made available a Spanish version of “Nail Gun Safety - A Guide for Construction Contractors.”

| Oct 25, 2012

AGC holding webinar on sequestration’s potential impacts on the construction industry

AGC will hold a free webinar on sequestration and its potential impact on federal construction contractors on Nov. 7.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021