flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Fenestration Alliance updates standard for mulled combination assemblies

Codes and Standards

Fenestration Alliance updates standard for mulled combination assemblies

Last updated in 2010, document describes procedures and requirements for air leakage, water resistance, and structural performance.


By Peter Fabris, Contributing Editor | February 1, 2021

Courtesy Pixabay

The Fenestration and Glazing Industry Alliance (FGIA) updated a mulled assemblies document: AAMA 450-20, Performance Rating Method for Mulled Combination Assemblies, Composite Units, and Other Mulled Fenestration Systems.

The document was last updated in 2010. The performance rating method describes procedures and requirements for determining the air leakage, water resistance, and structural performance of mulled fenestration systems.

The document includes test procedures and calculation procedures for determining the performance of mulled fenestration systems. Mulled fenestration systems may be factory assembled or assembled onsite with parts and instructions supplied by the product manufacturer.

“The North American Fenestration Standard says that ‘mullion ratings shall be determined according to the requirements and procedures of AAMA 450 for both composite units and mulled combination assemblies.’ However, until now, AAMA 450 provided no guidance for composite units,” said Dave Goldsmith (PlyGem), co-chair of the FGIA Requirements for Mulled and Combination Window Assembly Update Task Group. “This document will put powerful new tools into the hands of engineers to assist them in determining how to construct structurally sound and weatherproof fenestration products in the most economical ways, and should also drastically reduce the amount of testing required to validate a large variety of composite unit configurations,” Goldsmith said.

Related Stories

| Aug 16, 2012

Public sector pushes sustainable building forward

Not usually noted for its innovation, the public sector has done the most to advance sustainable building, according to a recent panel of green building professionals.

| Aug 16, 2012

Canada’s first net-positive building under construction in Milton, Ontario

The GreenLife Business Centre in Milton, Ontario near Toronto is set to become the first net-positive energy building in Canada.

| Aug 9, 2012

St. Paul cannot adopt overly restrictive egress windows policy, court rules

The Minnesota state Court of Appeals rejected St. Paul's attempt to adopt a policy on egress windows that was stricter than state law.

| Aug 9, 2012

Fire chief questions building code after St. Louis apartment building fire

A blaze that destroyed a 197-unit apartment building in St. Louis, Mo., displacing 250 residents, led the city’s fire chief to question the materials used in the construction of the four-story building.

| Aug 9, 2012

Ramps have strict criteria for ADA compliance

It is important for businesses to understand that an existing ramp at a building entrance may not mean that barrier removal obligations under the Americans with Disabilities Act have been met.

| Aug 9, 2012

ClickSafety, AGC provide online training program for construction professionals

Construction professionals will be able to take a wide range of mandatory and optional safety training programs online through a new collaboration between the Associated General Contractors of America and ClickSafety.

| Aug 9, 2012

Tornado-ravaged Greensburg, Kansas’s new green buildings save $200K a year

The town of Greensburg, Kan., virtually destroyed by a tornado in 2007, decided to rebuild 13 public buildings according to green standards.

| Aug 2, 2012

FBI investigates Turner, Tishman, Skanska, and Plaza Construction for billing practices on public projects in New York

After charges filed against Bovis Lend Lease in April led to an admission of guilt and $56 million in fines for overbilling clients, federal prosecutors are investigating the billing practices of four more New York City construction firms, according to reports.

| Aug 2, 2012

Court ruling may lead to more destructive testing on unfinished Harmon Tower in Las Vegas

A Clark County, Nevada district court judge ruled that the unfinished Harmon Hotel at CityCenter, operated and half-owned by MGM Resorts, could not use extrapolation when requesting damages at a possible trial.

| Aug 2, 2012

NIBS council recommends private and public measures to improve building sustainability

A new report by the National Institute of Building Sciences Consultative Council highlights four several areas that need focus to improve sustainability in buildings and infrastructure.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021