flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Fenestration Alliance updates standard for mulled combination assemblies

Codes and Standards

Fenestration Alliance updates standard for mulled combination assemblies

Last updated in 2010, document describes procedures and requirements for air leakage, water resistance, and structural performance.


By Peter Fabris, Contributing Editor | February 1, 2021

Courtesy Pixabay

The Fenestration and Glazing Industry Alliance (FGIA) updated a mulled assemblies document: AAMA 450-20, Performance Rating Method for Mulled Combination Assemblies, Composite Units, and Other Mulled Fenestration Systems.

The document was last updated in 2010. The performance rating method describes procedures and requirements for determining the air leakage, water resistance, and structural performance of mulled fenestration systems.

The document includes test procedures and calculation procedures for determining the performance of mulled fenestration systems. Mulled fenestration systems may be factory assembled or assembled onsite with parts and instructions supplied by the product manufacturer.

“The North American Fenestration Standard says that ‘mullion ratings shall be determined according to the requirements and procedures of AAMA 450 for both composite units and mulled combination assemblies.’ However, until now, AAMA 450 provided no guidance for composite units,” said Dave Goldsmith (PlyGem), co-chair of the FGIA Requirements for Mulled and Combination Window Assembly Update Task Group. “This document will put powerful new tools into the hands of engineers to assist them in determining how to construct structurally sound and weatherproof fenestration products in the most economical ways, and should also drastically reduce the amount of testing required to validate a large variety of composite unit configurations,” Goldsmith said.

Related Stories

Codes and Standards | Jun 8, 2020

5 must reads for the AEC industry today: June 8, 2020

Frank Lloyd Wright sites set to reopen and construction jobs rise by 464,000.

Codes and Standards | Jun 8, 2020

Reopened offices raise liability risk for businesses and owners

Risks may not be covered by property insurance.

Codes and Standards | Jun 4, 2020

American Wood Council updates report on fire resistance of wood members and assemblies

Provides new examples and background on mass timber calculations.

Codes and Standards | Jun 3, 2020

Virginia makes GCs liable for subs employee wages

New law allows workers to sue GCs for wages in class action.

Codes and Standards | Jun 2, 2020

Designers, owners reinventing restaurants to cope with COVID-19

Options include rearranged seating, mobile ordering, designated flow spaces.

Codes and Standards | Jun 1, 2020

How owners should comply with OSHA roofing safety guidelines

Buildings should have fall protection and restraint provisions for those who go on roofs.

Codes and Standards | May 29, 2020

AIA releases new, updated sustainable project documents

Streamlined sustainable design and construction process included.

Codes and Standards | May 28, 2020

USGBC outlines how it will support pandemic recovery efforts

Includes emergency guidance and upgrades to the LEED green building program.

Codes and Standards | May 27, 2020

Office market could be COVID-19 casualty

As companies get used to work at home, post-pandemic office market could collapse.

Codes and Standards | May 26, 2020

Architectural Reuse Council will step up efforts to reuse construction waste

Cabinets, appliances, lighting, and lumber diverted from landfills to be repurposed.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021