flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Field tested: Caterpillar’s Cat B15 rugged smartphone

Field tested: Caterpillar’s Cat B15 rugged smartphone

The B15 is billed by Cat as “the most progressive, durable and rugged device available on the market today.” 


By BD+C Staff | March 10, 2014
Caterpillars Cat B15 rugged smartphone
Caterpillars Cat B15 rugged smartphone

BD+C’s sister publication, Construction Equipment, recently field tested Caterpillar’s entry into the rugged mobile device market, the Cat B15 smartphone

Manufactured by Bullett Mobile Ltd. under license from Caterpillar, the B15 is billed by Cat as “the most progressive, durable and rugged device available on the market today.” 

Among the listed features are drop-resistance up to 1.8 meters (nearly five feet), water resistant (submerged up to one meter for 30 minutes), imperviousness to dust, and easy wet-finger tracking ability. The phone starts at $349 and ships unlocked to work with any carrier.

CE Contributing Editor and long-time construction industry professional Pat Crail put the Cat B15 through the paces to see if it actually lived up to the company’s claims. Crail offered the following feedback:

• Wet fingers? No problem. “The first rugged feature that I tested was wet-screen finger tracking on the VGA touch screen. I have used several other touch-screen phones and have always had difficulty with wet-finger tracking, especially if there is any oil or grease present. The B15 masterfully handles wet finger gestures on its screen, even with some oil residue or grease on the fingers.”

• Built to take a beating. “I then tested the phone’s ability to handle the 1.8-meter drop onto a concrete surface. Its aluminum-and-rubber construction lived up to claims. I dropped the phone from 1.8 meters a number of times, with no apparent damage.”

• Passed the water test. “After submerging the Cat B15 for 30 minutes in a meter of water, I pulled it out, shook off the excess moisture, and was able to use the phone immediately for both voice calls and Internet connectivity. I repeated this trial a few times over the several months of testing. To its credit, the B15 easily handled multiple submersions over the three months I used it.”

• Lack of 4G could be an issue for some. “The B15 seemed a bit sluggish when opening large, photo-heavy Web pages and video files, likely a result of the phone’s lack of 4G connectivity. The B15 operates on the latest version of Android and supports 3G wireless connections. According to Caterpillar’s Sarah Crab, there are no plans for the B15 to support LTE (4G) data connections.”

Read CE’s full report. For more on the B15, visit Catphones.com/phones/b15-smartphone.aspx.

Related Stories

Multifamily Housing | Apr 12, 2024

Habitat starts leasing Cassidy on Canal, a new luxury rental high-rise in Chicago

New 33-story Class A rental tower, designed by SCB, will offer 343 rental units. 

Student Housing | Apr 12, 2024

Construction begins on Auburn University’s new first-year residence hall

The new first-year residence hall along Auburn University's Haley Concourse.

K-12 Schools | Apr 11, 2024

Eric Dinges named CEO of PBK

Eric Dinges named CEO of PBK Architects, Houston.

Construction Costs | Apr 11, 2024

Construction materials prices increase 0.4% in March 2024

Construction input prices increased 0.4% in March compared to the previous month, according to an Associated Builders and Contractors analysis of the U.S. Bureau of Labor Statistics’ Producer Price Index data released today. Nonresidential construction input prices also increased 0.4% for the month.

Healthcare Facilities | Apr 11, 2024

The just cause in behavioral health design: Make it right

NAC Architecture shares strategies for approaching behavioral health design collaboratively and thoughtfully, rather than simply applying a set of blanket rules.

K-12 Schools | Apr 10, 2024

A San Antonio school will provide early childhood education to a traditionally under-resourced region

In San Antonio, Pre-K 4 SA, which provides preschool for 3- and 4-year-olds, and HOLT Group, which owns industrial and other companies, recently broke ground on an early childhood education: the South Education Center.

University Buildings | Apr 10, 2024

Columbia University to begin construction on New York City’s first all-electric academic research building

Columbia University will soon begin construction on New York City’s first all-electric academic research building. Designed by Kohn Pedersen Fox (KPF), the 80,700-sf building for the university’s Vagelos College of Physicians and Surgeons will provide eight floors of biomedical research and lab facilities as well as symposium and community engagement spaces. 

K-12 Schools | Apr 10, 2024

Surprise, surprise: Students excel in modernized K-12 school buildings

Too many of the nation’s school districts are having to make it work with less-than-ideal educational facilities. But at what cost to student performance and staff satisfaction? 

Industrial Facilities | Apr 9, 2024

Confessions of a cold storage architect

Designing energy-efficient cold storage facilities that keep food safe and look beautiful takes special knowledge.

Cultural Facilities | Apr 8, 2024

Multipurpose sports facility will be first completed building at Obama Presidential Center

When it opens in late 2025, the Home Court will be the first completed space on the Obama Presidential Center campus in Chicago. Located on the southwest corner of the 19.3-acre Obama Presidential Center in Jackson Park, the Home Court will be the largest gathering space on the campus. Renderings recently have been released of the 45,000-sf multipurpose sports facility and events space designed by Moody Nolan.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021