flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Final phase of The High Line elevated park set to open in Manhattan

Final phase of The High Line elevated park set to open in Manhattan

This section of the High Line includes trees and perennials selected by Piet Oudolf.


By Friends of the High Line | September 12, 2014

For more details on the opening of the final part of New York's High Line, which has been under construction since March, read the letter from Friends of the High Line below: 

Friends of the High Line, along with our partners at the New York City Department of Parks and Recreation, has announced that the third and northernmost section of the park, the High Line at the Rail Yards, will open to the public on Sunday, September 21, 2014.

The opening of the High Line at the Rail Yards will be a momentous occasion for all of us—our neighbors, City officials, generous members and supporters, designers, construction workers, gardeners, and volunteers—who gave their time, energy, and funding over the years to save the High Line from demolition, and reimagine the very notion of what a public space could be.

It will be the realization of our original dream for the High Line: to transform the entire structure, enabling visitors to walk all the way from Gansevoort Street to 34th Street. For the first time, we will all be able to walk the length of the High Line—traversing 22 city blocks, uninterrupted, 30 feet in the air, with expansive views of New York City, and the Hudson River.

I hope you’ll visit the High Line to walk the Rail Yards section, from 30th Street and 10th Avenue, to the curve near 12th Avenue, and up to 34th Street. Along the way, you will experience new design features and plantings that will animate this new section of the High Line, with newly planted trees and perennials selected by Piet Oudolf, innovatively designed seating areas, and pathways installed in the High Line’s original rail tracks. For the first time, you will be able to walk along the self-seeded grasses and wildflowers that have grown along the tracks in the years since the trains stopped running. There’s so much to experience in the Rail Yards section. It’s truly spectacular.

We hope you will join the celebration of this historic milestone. We will be celebrating with a full week of programs, with something for everyone. Beginning Monday, September 22, from dawn until after dark, we will host wellness programs, live music and performances, educational talks and tours, after school programs and so much more. Read all about our opening week activities—and our year-round programs—at www.thehighline.org.

We could have never reached this opening moment without the tremendous efforts of our neighbors, our community, our supporters and partners, who built momentum for the project from the days when it was the most unlikely of dreams. Thank you for supporting Friends of the High Line and for making the opening of the Rail Yards possible. I hope to see you on the High Line this fall!

—Joshua David, Co-Founder, Friends of the High Line

Related Stories

Smart Buildings | Jan 7, 2014

9 mega redevelopments poised to transform the urban landscape

Slowed by the recession—and often by protracted negotiations—some big redevelopment plans are now moving ahead. Here’s a sampling of nine major mixed-use projects throughout the country. 

| Jan 6, 2014

What is value engineering?

If you had to define value engineering in a single word, you might boil it down to "efficiency." That would be one word, but it wouldn’t be accurate.

| Jan 3, 2014

Norman Foster proposes elevated bikeways throughout London

Called SkyCycle, the plan calls for the construction of wide, car-free decks atop the city's existing railway corridors.

| Dec 13, 2013

Safe and sound: 10 solutions for fire and life safety

From a dual fire-CO detector to an aspiration-sensing fire alarm, BD+C editors present a roundup of new fire and life safety products and technologies. 

| Dec 10, 2013

16 great solutions for architects, engineers, and contractors

From a crowd-funded smart shovel to a why-didn’t-someone-do-this-sooner scheme for managing traffic in public restrooms, these ideas are noteworthy for creative problem-solving. Here are some of the most intriguing innovations the BD+C community has brought to our attention this year.

| Nov 27, 2013

Wonder walls: 13 choices for the building envelope

BD+C editors present a roundup of the latest technologies and applications in exterior wall systems, from a tapered metal wall installation in Oklahoma to a textured precast concrete solution in North Carolina. 

| Nov 26, 2013

Construction costs rise for 22nd straight month in November

Construction costs in North America rose for the 22nd consecutive month in November as labor costs continued to increase, amid growing industry concern over the tight availability of skilled workers.

| Nov 25, 2013

Building Teams need to help owners avoid 'operational stray'

"Operational stray" occurs when a building’s MEP systems don’t work the way they should. Even the most well-designed and constructed building can stray from perfection—and that can cost the owner a ton in unnecessary utility costs. But help is on the way.

| Oct 30, 2013

11 hot BIM/VDC topics for 2013

If you like to geek out on building information modeling and virtual design and construction, you should enjoy this overview of the top BIM/VDC topics.

| Oct 18, 2013

Researchers discover tension-fusing properties of metal

When a group of MIT researchers recently discovered that stress can cause metal alloy to fuse rather than break apart, they assumed it must be a mistake. It wasn't. The surprising finding could lead to self-healing materials that repair early damage before it has a chance to spread. 

boombox1
boombox2
native1

More In Category

Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.



Transit Facilities

Top 25 Transit Facility Construction Firms for 2023

The Walsh Group, Clark Group, Hensel Phelps, Skanska USA, and Hill International top BD+C's ranking of the nation's largest transit facility general contractors and construction management (CM) firms for 2023, as reported in the 2023 Giants 400 Report. Note: This ranking includes construction revenue for work related to bus terminals, rail terminals, and transit stations.


Transit Facilities

Top 40 Transit Facility Engineering Firms for 2023

AECOM, Jacobs, EXP, WSP, and Arup head BD+C's ranking of the nation's largest transit facility engineering and engineering/architecture (EA) firms for 2023, as reported in the 2023 Giants 400 Report. Note: This ranking includes design revenue for work related to bus terminals, rail terminals, and transit stations.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021

Â