SAFTI FIRST developed, engineered and successfully tested the first-ever fire and hurricane rated assembly for the Las Olas Beach Club and Condominium, a luxurious multi-family residence in Ft. Lauderdale, Fla.
The architect wanted to design the units with as much glazing as possible so residents can enjoy views of the surrounding area from their home. However, the building codes required the assembly to provide fire and hurricane protection.
To meet all design and code requirements, SAFTI FIRST worked with the entire Building Team to deliver a complete listed and labeled assembly that met the following test standards:
Fire Resistance:
ASTM E-119/UL 263/NFPA 251 for up to 2 hours. Provides full radiant heat protection.
Hurricane Resistance:
TAS 201, TAS 202 and TAS 203 for Miami Dade County.cASTM E-1196, ASTM E-330, ASTM E-1886, ASTM E-283-99, ASTM E-331-00, AAMA 1304-02 for UL Certification.
After successful testing, SAFTI FIRST supplied 76 fire and hurricane window/wall systems rated up to 60 minutes for the individual units and 120-minute fire and hurricane rated assemblies for the lobby area.
Blue-green tint was also applied to the glass as a decorative element.
Project Profile: Las Olas Beach Club and Condominiums in Ft. Lauderdale, FL
Architect: The Sieger Suarez Architectural Partnership
Contract Glazier: RC Aluminum
Product: Fire and Hurricane Rated SuperLite II-XL in SAFTIfire Hurricane Framing
Related Stories
| Apr 25, 2012
Bubble skyscraper design aims to purify drinking water
The Freshwater Skyscraper will address the issue of increasing water scarcity through a process known as transpiration
| Apr 25, 2012
Thornton Tomasetti/Fore Solutions provides consulting for Biologics Support Center
Project receives LEED Gold Certification.
| Apr 25, 2012
McCarthy introduces high school students to a career in construction
High school students from the ACE Mentoring Program tour the new CHOC Children’s Patient Tower in Orange, Calif.
| Apr 25, 2012
Missner Group names McCrory VP of property management
McCrory will be responsible for overseeing the financial and operational needs of the firm’s commercial real estate portfolio which includes more than two million square feet of property.
| Apr 25, 2012
Rogers joins Morgan/Harbour as senior project manager
Rogers will also manage the construction process and daily activities as well as act as the interface between the subcontractors, owners, municipalities and regulatory agencies
| Apr 25, 2012
J.C. Anderson selected for 50,000-sf build out at Chicago’s DePaul University
The build-out will consist of the construction of new offices, meeting rooms, video rooms and a state-of-the-art multi-tiered Trading Room.
| Apr 24, 2012
ULI Real Estate Consensus Forecast, projects improvements for the real estate industry through 2014
Survey is based on opinions from 38 of the nation’s leading real estate economists and analysts and suggests a marked increase in commercial real estate activity, with total transaction volume expected to rise from $250 billion in 2012 to $312 billion in 2014.
| Apr 24, 2012
Roofing Supply Group acquired by Clayton, Dubilier & Rice
RSG provides a complete offering of residential and commercial roofing materials and related supplies.
| Apr 24, 2012
McLennan named Ashoka Fellow
McLennan was recognized for his work on the Living Building Challenge.