flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

First look: Austin breaks ground on 'light-filled' Central Library

First look: Austin breaks ground on 'light-filled' Central Library

Design scheme by Lake|Flato and Shepley Bulfinch incorporates reading "porches" and a light-filled, six-story atrium.


By BD+C Editors | June 7, 2013
The city of Austin, Texas, last week broke ground on its new Central Library, establishing a major civic presence and community gathering space in the heart of the city’s redeveloped Seaholm district. The library, which is scheduled for completion in 2016, is designed by the architectural joint venture of Lake|Flato and Shepley Bulfinch.
 
The building is defined by a light-filled, six-story atrium space wrapped by collections and event space. Distinctive elements include a series of reading porches that overlook Shoal Creek and Lady Bird Lake, a quiet reading room, café, and Recycled Reads bookstore. Special areas that support the city’s emerging culture and arts scene include a 350-seat special events center.
 
The library is targeting a minimum of LEED (Leadership in Energy and Environmental Design) Silver certification. Its sustainable strategies include a major photovoltaic panel array, which will generate electrical power for the building; a rainwater harvesting system that will provide water for landscape irrigation and restroom plumbing fixtures; and a landscaped roof.
 
The facility supports alternative transportation, with charging stations for electric cars; a 150-bike corral, and direct links to the multi-use paths that run along the water.
 
The 198,000 square foot facility will replace the city’s 1979 Faulk Central Library.
 
 
 
 
 
 

Related Stories

| Sep 19, 2012

HGA Architects & Engineers moves offices in San Francisco

HGA’s San Francisco office has grown by nearly 25% in the past two years, adding shared expertise to the 120-person California practice, which includes the Sacramento and Los Angeles offices.

| Sep 19, 2012

Sasaki opens office in Shanghai

Office supports firm’s present and future work in China, throughout Asia.

| Sep 18, 2012

MBMA partners with ORNL for whole building energy efficiency study

The results are intended to advance energy efficiency solutions for new and retrofit applications.

| Sep 18, 2012

MKK opens office in North Dakota

MKK is currently working on seven projects in North Dakota, including a hotel, restaurant, truck stop, office building, and apartment complex.

| Sep 18, 2012

Firestone Building Products launches new website

Deep product information and innovative customer support tools are highlights.

| Sep 13, 2012

Leo A Daly Company promotes Kraskiewicz to senior vice president

Kraskiewicz, who most recently served as chief operations officer for the Leo A Daly division, will guide brand management, business development, operations and financial performance for 18 offices worldwide.

| Sep 13, 2012

Acentech adds audiovisual expertise to Trevose, Penn. office

Artese focuses on advising, overseeing, and maintaining the client’s vision for the project from the initial kick-off meeting to the final commissioning of the completed systems.

| Sep 13, 2012

Margulies Perruzzi Architects completes office design for Pioneer Investments

MPA updated the office design and additional support space consisting of five floors at Pioneer’s Boston office located at 60 State Street.

| Sep 12, 2012

Harvesting new ways to eliminate waste at the USDA

After installing 20 high-speed, energy-efficient hand dryers in restrooms throughout the USDA headquarters; the USDA reports seeing an immediate 50% reduction in the use of paper towels.

| Sep 11, 2012

RTKL appoints Lance Hosey as Chief Sustainability Officer and Senior Vice President

Author and authority on green design to spearhead RTKL Performance-driven DesignSM initiative.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021