flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

First look: Austin breaks ground on 'light-filled' Central Library

First look: Austin breaks ground on 'light-filled' Central Library

Design scheme by Lake|Flato and Shepley Bulfinch incorporates reading "porches" and a light-filled, six-story atrium.


By BD+C Editors | June 7, 2013
The city of Austin, Texas, last week broke ground on its new Central Library, establishing a major civic presence and community gathering space in the heart of the city’s redeveloped Seaholm district. The library, which is scheduled for completion in 2016, is designed by the architectural joint venture of Lake|Flato and Shepley Bulfinch.
 
The building is defined by a light-filled, six-story atrium space wrapped by collections and event space. Distinctive elements include a series of reading porches that overlook Shoal Creek and Lady Bird Lake, a quiet reading room, café, and Recycled Reads bookstore. Special areas that support the city’s emerging culture and arts scene include a 350-seat special events center.
 
The library is targeting a minimum of LEED (Leadership in Energy and Environmental Design) Silver certification. Its sustainable strategies include a major photovoltaic panel array, which will generate electrical power for the building; a rainwater harvesting system that will provide water for landscape irrigation and restroom plumbing fixtures; and a landscaped roof.
 
The facility supports alternative transportation, with charging stations for electric cars; a 150-bike corral, and direct links to the multi-use paths that run along the water.
 
The 198,000 square foot facility will replace the city’s 1979 Faulk Central Library.
 
 
 
 
 
 

Related Stories

| Feb 2, 2012

Call for Entries: 2012 Building Team Awards. Deadline March 2, 2012

Winning projects will be featured in the May issue of BD+C. 

| Feb 2, 2012

VLK Architects selected for new Cypress, Texas elementary school

The Bridgeland Elementary School will be a new prototype school for the District. Designed to meet the requirements of The Collaborative for High Performance Schools.

| Feb 2, 2012

Mortenson Construction to build 2.4 MW solar project in North Carolina

Located on a 12 acre site in the Sandhills region, the 2.4 megawatt (MW) system is expected to generate approximately 3.5 million kilowatt hours (kWhs) of clean electricity on an annual basis.

| Feb 2, 2012

Shawmut Design and Construction launches sports venues division

Expansion caps year of growth for Shawmut.

| Feb 2, 2012

Fire rated glazing helps historic university preserve its past

When the University embarked on its first major addition since the opening of Hutchins Hall in 1933, preserving the Collegiate Gothic-style architecture was of utmost importance.

| Feb 2, 2012

Delk joins Gilbane Building Co.

Delk to focus on healthcare construction programs and highly complex higher education facilities for Gilbane Building Company’s Southwest region.

| Feb 2, 2012

Next phase of construction begins on Scripps Prebys Cardiovascular Institute

$456 million Institute will be comprehensive heart center for 21st Century.

| Feb 1, 2012

Increase notched in construction jobs, but unemployment rate still at 16%

AGC officials said that construction employment likely benefited from unseasonably warm weather across much of the country that extended the building season.

| Feb 1, 2012

Replacement windows eliminate weak link in the building envelope

Replacement or retrofit can help keep energy costs from going out the window.

| Feb 1, 2012

‘Augmented reality’ comes to the job site

A new software tool derived from virtual reality is helping Building Teams use the power of BIM models more effectively.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021