flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

First look: Austin to get first high-rise since 2003

First look: Austin to get first high-rise since 2003

Developer Cousins Properties broke ground on the 29-story Colorado Tower in downtown Austin, Texas, the city's first high-rise building since Cousins' completed the Frost Bank Tower a decade ago.


By BD+C Staff | June 17, 2013
Cousins Properties Inc. has commenced construction on Colorado Tower, a 371,000-sf Class A office development in Downtown Austin, Texas.
 
The 29-story building, designed by Duda/Paine Architects, will be the first high-rise tower built in Austin since Cousins developed Frost Bank Tower in 2003. The formal ground breaking ceremony is scheduled for June 4th.     
 
“We have a long, successful history in Austin and are very excited about the prospects for Colorado Tower,” said Larry Gellerstedt, President and Chief Executive Officer of Cousins. “This building – with its great location and best-in-class amenity package – is particularly well positioned to capitalize on the vibrant market in Austin’s central business district.”
 
Located in the heart of Downtown Austin’s Warehouse District, Colorado Tower will offer a variety of amenities, including a top quality fitness facility and state-of-the-art conference center.  The building is being developed under the Austin Energy Green Building 2 star program and will be substantially complete by December 2014. 
 
Pre-leasing activity has been strong, with two high-profile companies – DuBois, Bryant & Campbell LLP and Scott, Douglass & McConnico LLP – officially committed to the building and several other prospective tenants in active discussions.   
      
Cousins has played a prominent role in the Austin real estate market for more than 20 years, with a list of notable projects including Frost Bank Tower, Palisades West, and the recent acquisition of 816 Congress. 
 
 
 
 
 
 
 

Related Stories

| Sep 22, 2010

Michael Van Valkenburg Assoc. wins St. Louis Gateway Arch design competition

Landscape architect Michael Van Valkenburgh and a multidisciplinary team of experts in “urban renewal, preservation, commemoration, social connections and ecological restoration” have been picked for the planning phase of The City+The Arch+The River 2015 International Design Competition.

| Sep 22, 2010

Satellier, Potential + Semac close investment deal

Satellier, a world leader in providing CAD and Building Information Modeling (BIM) outsourced services to the architecture, engineering and construction industry, announces a strategic minority investment from India-based top engineering firm Potential + Semac, ushering in the next evolution of the global architecture support industry.

| Sep 21, 2010

New BOMA-Kingsley Report Shows Compression in Utilities and Total Operating Expenses

A new report from the Building Owners and Managers Association (BOMA) International and Kingsley Associates shows that property professionals are trimming building operating expenses to stay competitive in today’s challenging marketplace. The report, which analyzes data from BOMA International’s 2010 Experience Exchange Report® (EER), revealed a $0.09 (1.1 percent) decrease in total operating expenses for U.S. private-sector buildings during 2009.

| Sep 21, 2010

Forecast: Existing buildings to earn 50% of green building certifications

A new report from Pike Research forecasts that by 2020, nearly half the green building certifications will be for existing buildings—accounting for 25 billion sf. The study, “Green Building Certification Programs,” analyzed current market and regulatory conditions related to green building certification programs, and found that green building remain robust during the recession and that certifications for existing buildings are an increasing area of focus.

| Sep 21, 2010

Middough Inc. Celebrates its 60th Anniversary

Middough Inc., a top ranking U.S. architectural, engineering and management services company, announces the celebration of its 60th anniversary, says President and CEO, Ronald R. Ledin, PE.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021