flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

First newly constructed Signia by Hilton Hotel to be built in Atlanta

Hotel Facilities

First newly constructed Signia by Hilton Hotel to be built in Atlanta

Signia by Hilton is a new upscale brand from Hilton Worldwide Holdings Inc.


By David Malone, Associate Editor | April 21, 2021
Signia by Hilton Hotel exterior in Atlanta

Renderings courtesy Georgia World Congress Center Authority.

The first newly constructed Signia by Hilton Hotel, a new upscale brand from Hilton Worldwide Holdings Inc., is set to be built in Atlanta, Ga. 

The $308 million project will be located on the northwest corner of the Georgia World Congress Center Authority campus and will overlook Mercedes-Benz stadium. It will connect to the Georgia World Congress Center (GWCC) by a walkway.

Signia by Hilton Hotel overlooking Mercedes-Benz stadium

The 1,225,000-sf, 40-story hotel will feature 975 technology-rich guest rooms. Amenities will include 75,000 sf of meeting and event space, parking facilities, a spa, fitness facilities with a 6,670-sf pool deck, an outdoor event lawn and deck, a market, two chef-driven restaurants, and three destination bars. A lobby will welcome guests with locally inspired architecture, landscaping, and a contemporary design aesthetic. 

Skanska and SG Contracting will provide reconstruction and construction management services for the Gensler-designed project. The hotel, which will serve as the headquarters hotel for the GWCC, is slated to open in early 2024.

Related Stories

Digital Twin | May 24, 2021

Digital twin’s value propositions for the built environment, explained

Ernst & Young’s white paper makes its cases for the technology’s myriad benefits.

Market Data | Apr 30, 2021

New York City market continues to lead the U.S. Construction Pipeline

New York City has the greatest number of projects under construction with 110 projects/19,457 rooms.

Market Data | Apr 29, 2021

U.S. Hotel Construction pipeline beings 2021 with 4,967 projects/622,218 rooms at Q1 close

Although hotel development may still be tepid in Q1, continued government support and the extension of programs has aided many businesses to get back on their feet as more and more are working to re-staff and re-open.

Hotel Facilities | Mar 16, 2021

Navy Pier’s first hotel opens

KOO designed the project.

AEC Tech | Mar 4, 2021

The Weekly show, March 4, 2021: Bringing AI to the masses, and Central Station Memphis hotel

This week on The Weekly show, BD+C editors speak with AEC industry leaders about the award-winning Central Station Memphis hotel reconstruction project, and how Autodesk aims to bring generative design and AI tools to the AEC masses.

Market Data | Feb 24, 2021

2021 won’t be a growth year for construction spending, says latest JLL forecast

Predicts second-half improvement toward normalization next year.

Hotel Facilities | Feb 16, 2021

Santa Monica Professional Building restored into a modern hotel

Howard Laks Architects designed the project.

Market Data | Feb 1, 2021

The New York City market is back on top and leads the U.S. hotel construction pipeline

New York City has the greatest number of projects under construction with 108 projects/19,439 rooms.

Market Data | Jan 29, 2021

The U.S. hotel construction pipeline stands at 5,216 projects/650,222 rooms at year-end 2020

At the end of Q4 ‘20, projects currently under construction stand at 1,487 projects/199,700 rooms.

boombox1
boombox2
native1

More In Category

3D Printing

3D-printed construction milestones take shape in Tennessee and Texas

Two notable 3D-printed projects mark milestones in the new construction technique of “printing” structures with specialized concrete. In Athens, Tennessee, Walmart hired Alquist 3D to build a 20-foot-high store expansion, one of the largest freestanding 3D-printed commercial concrete structures in the U.S. In Marfa, Texas, the world’s first 3D-printed hotel is under construction at an existing hotel and campground site.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021