flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

First RFP requiring modular construction on New York City housing project issued

Codes and Standards

First RFP requiring modular construction on New York City housing project issued

Part of Housing 2.0 modular construction initiative.


By Peter Fabris, Contributing Editor | June 11, 2018
Prefabricated construction site
Prefabricated construction site

The New York City Department of Preservation and Housing recently issued its first request for proposals under its Housing 2.0 modular construction initiative.

The RFP is for a new mixed-use affordable housing project on city-owned 49,397 sf site in Brooklyn. Using modular construction will allow the department to reduce construction costs, get housing built faster, and respond more quickly to demographic shifts, officials contend.

The use of modular construction for affordable housing initiatives has gained support in recent years, despite a lack of modular manufacturers in the New York metro area and logistical challenges that come with delivering and storing large modular pieces.

Deputy Mayor Alicia Glen said the goal of the program was to master mid-rise, modular multifamily development to help meet the city’s increased affordable housing goals, according to a report in The Real Deal. The city aims to create or preserve 300,000 residential units by 2026.

Related Stories

| Jan 8, 2014

Architect sentenced to a year in jail for firefighter's death

Architect Gerhard Becker was sentenced to a year in LA county jail after pleading no contest to the manslaughter of a firefighter who died while trying to contain a fire in a home the architect had designed for himself.

| Jan 8, 2014

United Association, NRDC seek major plumbing code changes

Proposed changes include mandating the insulation of hot water piping in new buildings. 

| Jan 2, 2014

EPA move to assert oversight on small bodies of water among top regulatory battles for 2014

The EPA has started the process of declaring that it has the power to regulate streams, brooks, and small ponds.

| Jan 2, 2014

Paseo Verde in Philadelphia is nation’s first LEED Platinum neighborhood development

Paseo Verde, a mixed-use, mixed-income community hosted a ribbon cutting ceremony last month.

| Jan 2, 2014

Green infrastructure prominent in Akron, Ohio's sewer plans

City officials in Akron, Ohio want to prevent stormwater from entering its combined sewer system through the use of green infrastructure.

| Jan 2, 2014

OSHA to hold public meeting on proposed rule to improve tracking of workplace injuries

The Occupational Safety and Health Administration (OSHA) has scheduled a public meeting to allow interested parties to comment on the proposed rule to improve tracking of workplace injuries and illnesses.

| Jan 2, 2014

Measuring whole building energy use among big changes in LEED v4

A new prerequisite in LEED v4 calls for each project to measure whole building energy use, and then share that data with USGBC.

| Jan 1, 2014

San Francisco hosts Net Positive Energy + Water Conference

The Living Building Challenge’s Net Positive Energy + Water Conference will be held Feb. 4-5 in San Francisco.

| Dec 27, 2013

California’s new Title 24 energy code compliance date pushed back to July 1, 2014

Due to the stringency of the provisions in California’s new Title 24 energy codes, their implementation has been postponed until July 1, 2014 to allow jurisdictions and engineers to prepare for them.

| Dec 27, 2013

$1 billion 'city within a city' development approved by Coachella, Calif., city council

The mega development includes 7,800 homes, a retail center, office space, and nearly 350 acres of open space.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021