flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

FitzGerald establishes Denver office

FitzGerald establishes Denver office

New office extends the architecture firm's reach into the Southwest, California, and Texas.


By FitzGerald | September 29, 2022
FitzGerald Denver office
Courtesy FitzGerald.

FitzGerald, headquartered in Chicago, has opened an office in Denver. The new location bolsters FitzGerald’s nationwide reach and capitalizes on local expertise to serve new and existing clients in Denver and the Front Range, as well as the Southwest United States, California, and Texas.

“Building a physical presence in Colorado is a big step for our firm and reiterates our commitment to offering our services to clients from coast to coast,” said Mike DeRouin, president of FitzGerald. “Remote/virtual collaboration has come a long way in recent years, but there is no substitute for local knowledge and boots on the ground in the Rockies and all things westward. We’re proud to make Denver our second home market and develop our own blueprint for national growth.”

ADAM BERKELHAMER TO HEAD NEW OFFICE

Leading the Denver office is Adam Berkelhamer, AIA an associate principal with FitzGerald since 2021.Berkelhamer heads several multifamily project teams across the country as well as acting as one of FitzGerald’s Design Directors.

Prior to FitzGerald Berkelhamer worked for over 25 years domestically and internationally on award-winning projects ranging from the largest roof structure in Europe (Liege-Guillemins TGV) to Class A residential developments in Chicago and Phoenix (30 West Oak, SoNo East, Domus).

He has explored multifamily design from large complexes of co-living apartments to high-end single-family residences.

Most recently, Berkelhamer was the leader of his own practice based in the San Francisco Bay area, where he designed multifamily properties and collaborated with FitzGerald and other firms.

MATTHEW WIEDENMAN REJOINS FITZGERALD IN DENVER OFFICE

The Denver office also recently expanded with the addition of senior associate Matthew Wiedenman. He rejoins FitzGerald as a member of the Denver team with local working knowledge of Colorado’s Front Range and the Vail Valley in urban multifamily development, mountain resort, and luxury residential work.

Wiedenman has a background in project management and extensive experience in multifamily housing, hospitality, senior living, recreational, adaptive reuse, and historic renovation projects—recently specializing in the use of panelized and room-scale modular construction methods to control project costs.

His work experience has resulted in built work across Colorado, Kansas, Nebraska, Iowa, and Illinois with additional pursuits in Arizona and Texas.

Related Stories

Mass Timber | Apr 22, 2024

British Columbia changing building code to allow mass timber structures of up to 18 stories

The Canadian Province of British Columbia is updating its building code to expand the use of mass timber in building construction. The code will allow for encapsulated mass-timber construction (EMTC) buildings as tall as 18 stories for residential and office buildings, an increase from the previous 12-story limit. 

Standards | Apr 22, 2024

Design guide offers details on rain loads and ponding on roofs

The American Institute of Steel Construction and the Steel Joist Institute recently released a comprehensive roof design guide addressing rain loads and ponding. Design Guide 40, Rain Loads and Ponding provides guidance for designing roof systems to avoid or resist water accumulation and any resulting instability.

Building Materials | Apr 22, 2024

Tacoma, Wash., investigating policy to reuse and recycle building materials

Tacoma, Wash., recently initiated a study to find ways to increase building material reuse through deconstruction and salvage. The city council unanimously voted to direct the city manager to investigate deconstruction options and estimate costs. 

Student Housing | Apr 19, 2024

$115 million Cal State Long Beach student housing project will add 424 beds

A new $115 million project recently broke ground at California State University, Long Beach (CSULB) that will add housing for 424 students at below-market rates. The 108,000 sf La Playa Residence Hall, funded by the State of California’s Higher Education Student Housing Grant Program, will consist of three five-story structures connected by bridges.

Construction Costs | Apr 18, 2024

New download: BD+C's April 2024 Market Intelligence Report

Building Design+Construction's monthly Market Intelligence Report offers a snapshot of the health of the U.S. building construction industry, including the commercial, multifamily, institutional, and industrial building sectors. This report tracks the latest metrics related to construction spending, demand for design services, contractor backlogs, and material price trends.

Construction Costs | Apr 16, 2024

How the new prevailing wage calculation will impact construction labor costs

Looking ahead to 2024 and beyond, two pivotal changes in federal construction labor dynamics are likely to exacerbate increasing construction labor costs, according to Gordian's Samuel Giffin.

Healthcare Facilities | Apr 16, 2024

Mexico’s ‘premier private academic health center’ under design

The design and construction contract for what is envisioned to be “the premier private academic health center in Mexico and Latin America” was recently awarded to The Beck Group. The TecSalud Health Sciences Campus will be located at Tec De Monterrey’s flagship healthcare facility, Zambrano Hellion Hospital, in Monterrey, Mexico.

Market Data | Apr 16, 2024

The average U.S. contractor has 8.2 months worth of construction work in the pipeline, as of March 2024

Associated Builders and Contractors reported today that its Construction Backlog Indicator increased to 8.2 months in March from 8.1 months in February, according to an ABC member survey conducted March 20 to April 3. The reading is down 0.5 months from March 2023.

Laboratories | Apr 15, 2024

HGA unveils plans to transform an abandoned rock quarry into a new research and innovation campus

In the coastal town of Manchester-by-the-Sea, Mass., an abandoned rock quarry will be transformed into a new research and innovation campus designed by HGA. The campus will reuse and upcycle the granite left onsite. The project for Cell Signaling Technology (CST), a life sciences technology company, will turn an environmentally depleted site into a net-zero laboratory campus, with building electrification and onsite renewables.

Codes and Standards | Apr 12, 2024

ICC eliminates building electrification provisions from 2024 update

The International Code Council stripped out provisions from the 2024 update to the International Energy Conservation Code (IECC) that would have included beefed up circuitry for hooking up electric appliances and car chargers.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021