flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

FitzGerald establishes Denver office

FitzGerald establishes Denver office

New office extends the architecture firm's reach into the Southwest, California, and Texas.


By FitzGerald | September 29, 2022
FitzGerald Denver office
Courtesy FitzGerald.

FitzGerald, headquartered in Chicago, has opened an office in Denver. The new location bolsters FitzGerald’s nationwide reach and capitalizes on local expertise to serve new and existing clients in Denver and the Front Range, as well as the Southwest United States, California, and Texas.

“Building a physical presence in Colorado is a big step for our firm and reiterates our commitment to offering our services to clients from coast to coast,” said Mike DeRouin, president of FitzGerald. “Remote/virtual collaboration has come a long way in recent years, but there is no substitute for local knowledge and boots on the ground in the Rockies and all things westward. We’re proud to make Denver our second home market and develop our own blueprint for national growth.”

ADAM BERKELHAMER TO HEAD NEW OFFICE

Leading the Denver office is Adam Berkelhamer, AIA an associate principal with FitzGerald since 2021.Berkelhamer heads several multifamily project teams across the country as well as acting as one of FitzGerald’s Design Directors.

Prior to FitzGerald Berkelhamer worked for over 25 years domestically and internationally on award-winning projects ranging from the largest roof structure in Europe (Liege-Guillemins TGV) to Class A residential developments in Chicago and Phoenix (30 West Oak, SoNo East, Domus).

He has explored multifamily design from large complexes of co-living apartments to high-end single-family residences.

Most recently, Berkelhamer was the leader of his own practice based in the San Francisco Bay area, where he designed multifamily properties and collaborated with FitzGerald and other firms.

MATTHEW WIEDENMAN REJOINS FITZGERALD IN DENVER OFFICE

The Denver office also recently expanded with the addition of senior associate Matthew Wiedenman. He rejoins FitzGerald as a member of the Denver team with local working knowledge of Colorado’s Front Range and the Vail Valley in urban multifamily development, mountain resort, and luxury residential work.

Wiedenman has a background in project management and extensive experience in multifamily housing, hospitality, senior living, recreational, adaptive reuse, and historic renovation projects—recently specializing in the use of panelized and room-scale modular construction methods to control project costs.

His work experience has resulted in built work across Colorado, Kansas, Nebraska, Iowa, and Illinois with additional pursuits in Arizona and Texas.

Related Stories

| Oct 21, 2010

GSA confirms new LEED Gold requirement

The General Services Administration has increased its sustainability requirements and now mandates LEED Gold for its projects.

| Oct 18, 2010

World’s first zero-carbon city on track in Abu Dhabi

Masdar City, the world’s only zero-carbon city, is on track to be built in Abu Dhabi, with completion expected as early as 2020. Foster + Partners developed the $22 billion city’s master plan, with Adrian Smith + Gordon Gill Architecture, Aedas, and Lava Architects designing buildings for the project’s first phase, which is on track to be ready for occupancy by 2015.

| Oct 13, 2010

Editorial

The AEC industry shares a widespread obsession with the new. New is fresh. New is youthful. New is cool. But “old” or “slightly used” can be financially profitable and professionally rewarding, too.

| Oct 13, 2010

Test run on the HP Z200 SFF Good Value in a Small Package

Contributing Editor Jeff Yoders tests a new small-form factor, workstation-class desktop in Hewlett-Packard’s line that combines performance of its minitower machine with a smaller chassis and a lower price.

| Oct 13, 2010

Prefab Trailblazer

The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.

| Oct 13, 2010

Thought Leader

Sundra L. Ryce, President and CEO of SLR Contracting & Service Company, Buffalo, N.Y., talks about her firm’s success in new construction, renovation, CM, and design-build projects for the Navy, Air Force, and Buffalo Public Schools.

| Oct 13, 2010

Hospital tower gets modern makeover

The Wellmont Holston Valley Medical Center in Kingsport, Tenn., expanded its D unit, a project that includes a 243,443-sf addition with a 12-room operating suite, a 36-bed intensive care unit, and an enlarged emergency department.

| Oct 13, 2010

Modern office design accentuates skyline views

Intercontinental|Exchange, a Chicago-based financial firm, hired design/engineering firm Epstein to create a modern, new 31st-floor headquarters.

| Oct 13, 2010

Hospital and clinic join for better patient care

Designed by HGA Architects and Engineers, the two-story Owatonna (Minn.) Hospital, owned by Allina Hospitals and Clinics, connects to a newly expanded clinic owned by Mayo Health System to create a single facility for inpatient and outpatient care.

| Oct 13, 2010

Biloxi’s convention center bigger, better after Katrina

The Mississippi Coast Coliseum and Convention Center in Biloxi is once again open for business following a renovation and expansion necessitated by Hurricane Katrina.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021