flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

In Flint, Mich., a new health center brings together children’s mental and physical health services

Healthcare Facilities

In Flint, Mich., a new health center brings together children’s mental and physical health services

The Center for Children’s Integrated Services features a playground area designed for children with autism, one of the leading outcomes from the Flint water crisis.


By Novid Parsi, Contributing Editor | December 14, 2022
In Flint, Mich., a new health center brings together children’s mental and physical health services
The Center for Children’s Integrated Services features a series of “autism pods” and an autism playground area. Autism has been one of the leading outcomes seen from the Flint water crisis. All photos courtesy HED

Families with children who experience behavioral health issues often have to travel to multiple care facilities to see multiple teams of specialists. In Flint, Mich., the new Center for Children’s Integrated Services at Genesee Health System (GHS), a public mental health provider, brings together all of the GHS children’s programs, including its behavioral health programs, under one roof. It provides families a single destination for their children’s mental healthcare.

The facility aims to integrate and improve behavioral health care and primary care for underserved families. Designed by HED, the 60,000-sf facility unifies the three core children’s behavioral health programs—the Neurological Center for Excellence, Child and Family Services, and the Children’s Autism Center—as well as community outreach and a federally qualified health care center.

The Center for Children’s Integrated Services features a series of “autism pods” and an autism playground area. As a therapeutic tool, the playground allows children with autism to engage with nature through sensory-rich features. Autism has been one of the leading outcomes seen from the Flint water crisis, according to GHS.

Center for Children’s Integrated Services at Genessee Health System Flint Michigan HED

HED designed the building’s layout to improve navigation and efficiency for patients, families, and medical staff, while also enhancing visibility and accessibility. The facility offers a secure drop-off area, a secure playground, a café, an outdoor plaza, and comfortable waiting areas.

In addition, the Center for Children’s Integrated Services will help develop medical innovation in the evaluation and treatment of lead poisoning. This work will inform best practices for treatment around the world.

The facility is located along a main bus line in Flint, improving transportation access to health services for low- and moderate-income families.

On the Building Team:
Owner: Greater Flint Children’s Mental Health Facilities, Inc.
Design architect and architect of record: HED
MEP engineer and structural engineer: HED
General contractor/construction manager: DW Lurvey Construction

Center for Children’s Integrated Services at Genessee Health System Flint Michigan 6

Center for Children’s Integrated Services at Genessee Health System Flint Michigan 2

Center for Children’s Integrated Services at Genessee Health System Flint Michigan 1

Center for Children’s Integrated Services at Genessee Health System Flint Michigan 4

Center for Children’s Integrated Services at Genessee Health System Flint Michigan 3

 

Related Stories

Healthcare Facilities | Oct 29, 2018

Outpatient clinics bring the VA closer to injured veterans

The Department of Veterans Affairs is making efforts to improve its construction management and align its design guidelines to industry standards.

Healthcare Facilities | Oct 22, 2018

WSP-HKS JV signs deal for U.S. Navy construction work

The contract is not exclusive to the two firms, but it lets NAVFAC assign certain projects to them.

Healthcare Facilities | Oct 12, 2018

N.Y. builder pushes to get military trauma centers up and running quicker

To date, seven NICoE Spirit satellite centers have been built on the grounds of Fort Belvoir in Virginia, Camp Lejeune and Fort Bragg in North Carolina, Fort Campbell in Kentucky, Fort Hood in Texas, Joint Base Lewis-McChord in Washington, and Camp Pendleton in California.

Healthcare Facilities | Sep 7, 2018

Medical office construction isn’t keeping pace with the aging of America

A new Transwestern report suggests a “rethinking” of healthcare delivery approaches that lean heavier on technology.

Engineers | Aug 22, 2018

An electrical engineer’s take on designing successful pharmaceutical lab space

Patrick Licklider, PE, CEM, GGP, LEED AP BD+C, an electrical engineer in Clark Nexsen’s Science + technology practice, shares his perspective on what it takes to successfully design laboratory and manufacturing environments for the fast-changing pharmaceutical and biotech industry.

Healthcare Facilities | Aug 3, 2018

Seismic deadlines approaching for healthcare companies

California hospitals can save money with a holistic approach to retrofit issues.

Healthcare Facilities | Jul 30, 2018

Best in healthcare design 2018: Seven projects win AIA/AAH Healthcare Design Awards

The Steven Holl-designed Maggie’s Centre Barts cancer treatment facility in London highlights the honorees of the AIA Academy of Architecture for Health 2018 Healthcare Design Awards.

Healthcare Facilities | Jul 26, 2018

Healthcare market trends 2018: Health systems get leaner, more resilient

Hospitals set their sights on improving patient convenience and operational efficiency.

Healthcare Facilities | Jul 11, 2018

5 ways design is transforming behavioral healthcare

Circadian lighting, calming materials, and transparency are helping to normalize the patient experience in behavioral healthcare.

Healthcare Facilities | Jul 10, 2018

HGA designs acute care hospital for MetroHealth in Cleveland

The facility’s master plan creates a ‘hospital in a park.’

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021