A Form and Function Upgrade for New Forensic Facility

Sponsored Content Metals

A Form and Function Upgrade for New Forensic Facility


By Metl-Span | October 15, 2021
Northampton Forensics

Northampton County in Nazareth, Pennsylvania, had a forensics problem. Its Coroner’s Office had been housed in a cramped, outmoded space, one that did not lend itself to the sensitive operations such a facility should be capable of. Additionally, those who worked at the Coroner’s Office found themselves needing to drive around to local hospitals and medical centers to conduct its critical work. 

The new Northampton County Forensic Center, an $11 million state-of-the-art facility constructed at 300 Gracedale Ave. in Upper Nazareth Township, solved these problems … and then some. As reported on LehighValleyLive.com, “The new 27,847-square-foot facility includes autopsy rooms with viewing areas to accommodate law officers and medical students; a digital forensic lab; lockers to secure evidence; a five-bay garage; and offices for the staff of county Coroner Zachary Lysek. It also includes a private reception room for family members coming to view their deceased loved ones.”

Builder/installer and longtime Metl-Span dealer, CHM Contracting, LLC, based in Leesport, Pennsylvania, along with project architect W2A Design Group and the general contractor, 
Sordoni Construction, found the ideal building materials solution in Metl-Span 5” CF42R insulated metal roof panels and 4” CF42 insulated metal wall panels

 

Performance and Installation Expertise

According to Steve Chando, Vice President of CHM Contracting, “The 5” CF42R allowed the building to be under roof in 12 working days, which then allowed other contractors to proceed with their work. Insulated metal panels, in general, are advantageous to the overall completion of a project because you have a complete weathertight system as soon as panels are set.”

Further, says Jake Kozak, CHM’s Project Manage/Estimator, “Since you have a 42-inch-wide panel that runs the full length of the roof, you get optimum coverage, which allows for a very quick install.” Some roof panels, in fact, were as long as 51 feet.CHM used a crane and a vacuum rig to set the roof panels, underscoring the magnitude of the engineering involved with the process. 

Northampton Forensics

Kozak continues, “Also of note, with a conventional building, the framing goes up, then the exterior sheathing goes up, followed by the air vapor barrier, and another layer of girts. There are just so many layers and so many people to coordinate, it just drags out the schedule and complicates installation. But with single-sourcing, like with this project, the exterior wall system can be installed with a single contractor, which is a huge advantage to everyone involved.”

Chris Devers, Sales Representative with Exterior Building Solutions for Metl-Span, adds that having one qualified contractor on the job, with the experience that CHM brings to the table, is key. “They do a great job,” he says. This wasn't something where just anybody could just come on-site and put this together. To have one contractor come in there and cover all the bases, from the exterior shell to the interior finish, it was incredibly impressive to watch.”

Additionally, in terms of the wall panels, the uncompromising ability for the insulated CF42 Metl-Span metal wall panels to integrate seamlessly with other aspects of the construction—for example, Airolite louvers, drop-in window units, overhead doors, and man doors—supported a cost-effective and relatively easy installation process.

Kozak shares that the louvers, in particular, worked out well for this project because CHM was able to install the Metl-Span panels and cut out afterwards, which kept the building weathertight while the crew was waiting on other contractors. Since the building was weathertight, CHM was able to come back and attend to additional detail afterwards.

As for additional benefits of the Metl-Span wall panels on the interior, some panels were exposed, and due to the nature of the building’s use, it was important to have a surface that's easily cleaned and maintained.

Moreover, the timely delivery of materials also allowed for a quick and efficient installation. In fact, the project was field measured in May 2020, installation started in June 2020 and the installation was complete by Oct. 1, 2020. 

 

A Commercial Look for an Industrial Structure

Regarding the desired building aesthetic, with both the wall and roof panels, the design team was looking for a striated embossed type of finish. There were also complementary colors of wall panel, Smoke Grey, Sandstone, and Zinc Grey, which gave it an integrated look but with different color aspects. 

For the Zinc Grey roof panels, they wanted the look of a standing seam metal roof application but with the performance of an insulated metal panel. “For the roof,” Chando says, “you’ve got both aspects—a good insulating high R value with the 5” panel, as well as the standing seams at all of the jointing applications.”

With the color scheme and textured panels, the end result was more of a commercial-looking structure as opposed to industrial, in spite of the fact that the building’s basic use is as a morgue. Kozak says, “It’s not a cold feeling building. It doesn’t look like a morgue when you drive by, which is something that was important to the design team. It sits right next to Gracedale nursing home, which is a fairly significant architectural feature in the area.”

Northampton Forensics

Chando adds, “It’s in the middle of a field, on a piece of farmland, so they wanted it to look nice, nothing that looked like a farm building. It doesn’t look industrial. Rather, it looks like it’s part of the complex.”

Chando summarizes, “The finished Metl-Span installation is great example of how multiple finishes and textures of the same panel can produce a high-end architectural appearance, all while meeting the owner’s utilitarian needs.” 


Project Details:
Project Name: Northampton County Forensic Center
Location: Nazareth, PA
Architect: W2A Design Group 
General Contractor: Sordoni Construction
Installer: CHM Contracting LLC

Metl-Span Products:
Wall panels: 4” CF42 – Smoke Grey, Sandstone, Zinc Grey, 12,800 SF
Roof panels: 5” CF42R – Zinc Gray LG, (26,716 SF)

Related Stories

Sponsored | | Sep 30, 2014

How project managers can manage technology

Not long ago, the role of a construction project manager revolved around working with people: employees, vendors, consultants, designers, subcontractors and owners. Today, project managers primarily manage information. SPONSORED CONTENT

| Sep 24, 2014

5 business lessons from a 43-year Star veteran

Mary Ed Cain was supposed to be born a boy. That was the first time she surprised everyone. The second time came on a daily basis during her 43-year career at Star Building Systems. SPONSORED CONTENT

| Jul 21, 2014

16 utility questions to answer during your building project

We need electricity to power our building projects, along with water and gas and a faultless sanitation system. That’s what we think about when we think about utility requirements for our building project, but are we missing something? SPONSORED CONTENT

Sponsored | | Jul 17, 2014

A major hop forward

The construction of efficient metal buildings has helped Perrault Farms expand its hops-harvesting business.

| Jul 17, 2014

22 land questions to decide if your build site works

When you’re ready to build, land needs a serious amount of attention. Since it can singlehandedly shift your building plans, land must be investigated, questioned, and eyed from every angle. SPONSORED CONTENT

| Jul 9, 2014

The one misstep that could be slowing your company’s growth

Change. It’s inevitable. And success for any professional may very well depend on how well we adapt to it. SPONSORED CONTENT

| May 27, 2014

Contractors survey reveals improving construction market

The construction industry is on the road to recovery, according to a new survey by Metal Construction News. Most metrics improved from the previous year’s survey, including a 19.4% increase in the average annual gross contracting sales volume. SPONSORED CONTENT

| May 11, 2014

8 starter questions to answer when thinking about building

So, are you ready to start building? Completing these eight questions will help you answer that confidently. SPONSORED CONTENT

| Apr 25, 2014

A radiant barrier FAQ: Everything you wanted to know but were afraid to ask

There are many examples of materials developed for the space program making their way into everyday life and radiant barriers are just that. SPONSORED CONTENT

| Apr 17, 2014

6 details that can throw off your schedule

In 1997, Apple told us to “Think Different.” So we did. We thought about what could happen if the world went mobile, if information was boundless, if we could carry our office in our back pocket. We’ve grown to love different and to expect change. And when it comes to Apple products, that’s not such a bad thing. When it comes to your building order, however, it’s not nearly as appealing.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021