flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Foster + Partners, CannonDesign unveil design for Mayo Clinic campus expansion

Healthcare Facilities

Foster + Partners, CannonDesign unveil design for Mayo Clinic campus expansion

Mayo Clinic’s main campus redesign includes two nine-story clinical buildings featuring double-height winter gardens and a skybridge.


By Peter Fabris, Contributing Editor  | April 3, 2024
Foster + Partners, CannonDesign unveil design for Mayo Clinic campus expansion in Rochester, Minn.
Rendering: Dbox/Foster + Partners © 2023, courtesy Mayo Foundation for Medical Education and Research

A redesign of the Mayo Clinic’s downtown campus in Rochester, Minn., centers around two new clinical high-rise buildings. The two nine-story structures will reach a height of 221 feet, with the potential to expand to 420 feet. Part of a multiyear strategic initiative, the two towers feature a skybridge that horizontally links them with the existing Gonda Building, allowing staff to traverse the site efficiently.

The skybridge is an integral part of a double-height social amenity level that will provide patients and loved ones with space to rest, connect, and recharge. This level will be clearly visible on the building’s façade, making it easy to locate from any part of the campus.

The design creates a new central point of arrival, with the north and south drop-offs converging at a unified main entrance. The existing Gonda Lobby will extend into the new facilities, simplifying wayfinding and creating a welcoming environment from the moment of arrival. 

The design creates adjacencies in dynamic care “neighborhoods” that will streamline the patient experience. These community-centered neighborhoods will fuse services around patient needs and specific diseases, creating continuous care environments that will serve as patients’ homes while at the clinic.

Double-height winter gardens will be located at the center of care neighborhoods, uniting them, and providing light-filled spaces with spectacular views of the city. The atriums are both social and functional, providing opportunities for new forms of respite and healing or collaboration and care. 

A universal grid along with generous floor-to-floor heights will allow clinical spaces to change over time and respond as healthcare continues to evolve. Care environments will be served behind the scenes by highly flexible technological infrastructure containing mechanical, data, and robotic delivery systems that support pioneering treatments while allowing prioritization of human connections. 

Seamless integration of digital capabilities blurs traditional distinctions between inpatient, outpatient, and virtual care to support patients throughout their healthcare journey.

“This is a revolutionary moment for medical care and a complete rethinking of the traditional hospital building as we know it offering maximum flexibility for future needs, while ensuring that the interest of the patient remains at the heart of their healthcare,” says Norman Foster, founder and executive chairman, Foster + Partners. “Our design centers on natural light, views and connections with nature to facilitate new breakthroughs and help deliver the highest level of care with warmth and compassion.”

On the project team:
Owner: Mayo Clinic
Architects: Foster + Partners; CannonDesign
Engineers: CannonDesign is Engineer of Record. Burns and McDonnell is engineer of record for central plant upgrades, site electrical, and thermal utilities.
General Contractor: Gilbane Building Company

Rendering: Dbox/Foster + Partners © 2023, courtesy Mayo Foundation for Medical Education and Research
Rendering: Dbox/Foster + Partners © 2023, courtesy Mayo Foundation for Medical Education and Research
Rendering: Dbox/Foster + Partners © 2023, courtesy Mayo Foundation for Medical Education and Research
Rendering: Dbox/Foster + Partners © 2023, courtesy Mayo Foundation for Medical Education and Research
Rendering: Dbox/Foster + Partners © 2023, courtesy Mayo Foundation for Medical Education and Research
Rendering: Dbox/Foster + Partners © 2023, courtesy Mayo Foundation for Medical Education and Research
Rendering: Dbox/Foster + Partners © 2023, courtesy Mayo Foundation for Medical Education and Research
Rendering: Dbox/Foster + Partners © 2023, courtesy Mayo Foundation for Medical Education and Research
Rendering: Dbox/Foster + Partners © 2023, courtesy Mayo Foundation for Medical Education and Research
Rendering: Dbox/Foster + Partners © 2023, courtesy Mayo Foundation for Medical Education and Research
Rendering: Dbox/Foster + Partners © 2023, courtesy Mayo Foundation for Medical Education and Research
Rendering: Dbox/Foster + Partners © 2023, courtesy Mayo Foundation for Medical Education and Research

 

Related Stories

Healthcare Facilities | Oct 2, 2020

Healthcare Design Awards promote projects that heal

Awards program highlights trends in healthcare facility designs.

University Buildings | Sep 16, 2020

A new interprofessional hub opens on U. Minnesota’s campus

The Health Sciences Education Center includes two floors for simulation and immersive training.

Healthcare Facilities | Sep 16, 2020

New Foster + Partners-designed hospital begins construction in Cairo

The project focuses on natural light, greenery, and views of the outside.

Healthcare Facilities | Sep 10, 2020

Easing the oncology journey: The role of urgent care

Oncology patients are better served when they’re connected to the right staff.

Giants 400 | Aug 28, 2020

2020 Giants 400 Report: Ranking the nation's largest architecture, engineering, and construction firms

The 2020 Giants 400 Report features more than 130 rankings across 25 building sectors and specialty categories.

Healthcare Facilities | Aug 27, 2020

A hospital addition in Maryland was designed and built in 120 days

Lean practices, and early engagement with the county’s permitting department, moved this project forward quickly.

Building Team | Aug 21, 2020

A healthcare project in Wisconsin benefits from including MEP subs in early design discussions

Prefabrication played a major role in quickening construction.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021