Foster + Partners’ plan for the Ourense FFCC Station in Galicia, Spain is to bring together high-speed rail and bus stations in a major urban intervention. This will open pedestrian links between the districts on either side of the tracks and create a new public plaza for the city.
The existing railway line is being upgraded to accommodate high-speed rail links in the region, something the recently revealed design takes into consideration. The plans call for a new station that caters to the increased passenger numbers created by the high-speed rail and creates a framework for a new transport interchange. Included in the new terminal will be a direct connection with the adjacent bus terminal, a new urban square in front of the station, and a pedestrian walkway and public park over the tracks.
Rendering courtesy of Foster + Partners.
The addition will be made from concrete plates and slender columns that match the color of the existing station’s granite. The new concrete plates will provide shelter from rain and high temperatures common to the area’s summers. The roofs are designed as a modular system requiring minimal maintenance with the capability of accommodating future expansions.
A new portico highlights the entry canopy and will feature cafés and shops. The front of the station will spill directly onto a new urban square. Meanwhile, the internal lobby will be reconfigured to create a space filled with natural light and triple-height ceilings. Historic frescoes on the upper portions of the walls are being retained and restored.
Rendering courtesy of Foster + Partners.
Wayfinding through the station has been improved via clear visual connections from the check-in stations to the trains. Additionally, a direct internal connection to the bus station creates an easy link to the city and surrounding area.
Related Stories
| Jun 1, 2012
New BD+C University Course on Insulated Metal Panels available
By completing this course, you earn 1.0 HSW/SD AIA Learning Units.
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 29, 2012
Thornton Tomasetti/Fore Solutions provides consulting for Phase I of Acadia Gateway Center
Project receives LEED Gold certification.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.
| Mar 29, 2012
U.K.’s Manchester Airport tower constructed in nine days
Time-lapse video shows construction workers on the jobsite for 222 continuous hours.
| Feb 15, 2012
Skanska secures $87M contract for subway project
The construction value of the project is $261.9 M. Skanska will include its full share, $87 M, in the bookings for Skanska USA Civil for the first quarter 2012.
| Dec 21, 2011
Hoboken Terminal restoration complete
Restoration of ferry slips, expanded service to benefit commuters.
| Dec 19, 2011
Davis Construction breaks ground on new NIAID property
The new offices will total 490,998 square feet in a 10-story building with two wings of 25,000 square feet each.
| Dec 2, 2011
What are you waiting for? BD+C's 2012 40 Under 40 nominations are due Friday, Jan. 20
Nominate a colleague, peer, or even yourself. Applications available here.
| Nov 10, 2011
Suffolk Construction awarded MBTA transit facility and streetscape project
The 21,000-sf project will feature construction of a cable-stayed pedestrian bridge over Ocean Avenue, an elevated plaza deck above Wonderland MBTA Station, a central plaza, and an at-grade pedestrian crossing over Revere Beach Boulevard