The Ohio Theatre, which opened in 1921, is one of four historic theaters in Cleveland’s Playhouse Square, the largest renovated theater district in the U.S. A fire destroyed the Ohio in 1964, and its latest reconstruction rectifies some incompatible remodeling of the past to restore the theater’s lobby to its prior grandeur.
The restoration relied heavily on historic photos and drawings (archived at Columbia University) by the theater’s original designer, Thomas Lamb.
The project team created a coloration and design rendering of the lobby by overlaying a historic black-and-white image. Historic photos helped recreate the pattern of the original carpet, as well as three of the original 30x10-foot murals that mimicked the style of French baroque artist Nicolas Poussin. Photos were used to determine the original height of the balustrade, which needed to be raised and reconfigured to meet current code.
The centerpiece of the restoration is the lobby’s 150-foot-long ceiling. The Building Team went with a light-gauge ceiling system suspended from the roof structure. Attached to the bottom of the framing is a layer of continuous sheet metal blocking, to which large ornamental plater panels were screwed and glued.
The team, led by architect DLR Group | Westlake Reed Leskosky, used 2D drawings overlaid with clay, high-res images, and a small section of charred plaster cornice that survived the fire to reproduce the molds for the ceiling’s plaster ornamentation. HVAC diffusers and a new fire sprinkler system were integrated into the design.
The project team for owner/developer Playhouse Square had to work around elements that weren’t original to the lobby, like the house manager’s office and a staircase that leads to the Kennedy Cabaret Theatre. The restoration introduced new elements, too, such as a family/ADA-compliant restroom and new concession areas.
Project Summary
Gold Award Winner
Building Team: DLR Group | Westlake Reed Leskosky (submitting firm, architect, MEP, SE, IT/telecomms, lighting) The Coniglio Company (site manager) EverGreene Architectural Arts (owner consultant) Turner Construction Co. (CM).
Details: 7,500 sf. Construction cost: $6.3 million. Construction time: July 2015 to May 2016. Delivery method: CM.
See all of the 2017 Reconstruction Award winners here
Related Stories
Reconstruction Awards | Nov 27, 2018
Bedford Square: Revivifying urbanity
A suburban mixed-use redevelopment restores ‘the lost art of living closely.'
Reconstruction Awards | Nov 26, 2018
Yarn works: Neverending yarn
111-year-old mill becomes a mixed-income multifamily community.
Reconstruction Awards | Nov 20, 2018
Wiseburn High School: New kind of P3
A California school district and a charter school system join forces to open a skills-based high school.
Reconstruction Awards | Nov 19, 2018
Kehoe Iron Works: Industrial strength makeover
A project team turns a toxic site into a civic treasure.
Reconstruction Awards | Nov 19, 2018
Weiser Hall, University of Michigan: Campus upgrade
A Mid-century building becomes home to a new International Institute.
Reconstruction Awards | Nov 16, 2018
Mass MoCA Building 6: The Robert W. Wilson Building
A textile mill becomes an arts center that energizes a New England town and its region.
Reconstruction Awards | Nov 15, 2018
Charles L. Tutt Library, Colorado College: Net-zero in the Rockies
Library expansion reinforces Colorado College’s commitment to carbon neutrality.
Reconstruction Awards | Nov 14, 2018
National Arts Centre: O, Canada
Three new wings and a flashy AV display add luster to the nation’s cultural gem.
Reconstruction Awards | Nov 13, 2018
20 Times Square: Conquering Times Square
The 20 Times Square mixed-used project at the corner of 47th and Seventh Avenue is indicative of the great lengths Building Teams will go in order to maximize real estate and media opportunities in Times Square.
Reconstruction Awards | Nov 12, 2018
Crosstown Concourse: An 'organic' urban village
Memphians band together to rebuild a gigantic Sears distribution facility into a multifaceted community crossroads.