In April, the Colburn School, an institute for music and dance education and performance, will break ground on a 100,000-sf expansion designed by architect Frank Gehry. Located in downtown Los Angeles, the performing arts center will join the neighboring Walt Disney Concert Hall and The Grand by Gehry, forming the largest concentration of Gehry-designed buildings in the world.
“This has been a long time in the making. The Colburn School expansion is a much-needed project for the community,” famed architect Frank Gehry said in a press statement. “I hope that it will be well-used and well-loved by the students of the Colburn School and the other cultural institutions of Los Angeles.”
The Colburn School provides music and dance education at all levels of development, from children as young as 7 months old to adults. Each week, the downtown L.A. campus welcomes about 10,000 people, and each year, over 2,000 students from around the world study at Colburn.
The new building, the Colburn Center, will be adjacent to Colburn’s Grand Avenue campus. In addition to training and performance facilities for music and dance, the Colburn Center will provide a concert hall for the region’s performing arts organizations—downtown L.A.’s first midsized concert hall, according to the Colburn School. The 1,000-seat, 17,200-sf hall will feature an in-the-round design, an orchestra pit, and a stage that can accommodate large-scale works.
Frank Gehry hopes to strengthen L.A.’s classical music community
“Our goal for this hall is that it will help strengthen the already robust classical music community here, solidifying Los Angeles’ leadership in this arena,” Gehry said.
The Colburn Center will more than double the facilities for the school’s Trudl Zipper Dance Institute, including a 100-seat theater for dance and four professional-sized studios for dance instruction and rehearsal.
The building’s new rooftop garden will be large enough for receptions and outdoor performances, while a ground-level garden will have a performance space that will be open to the public.
According to the press statement, Gehry’s design is “conceived as an ensemble of interlocking volumes, each of which houses a distinct program while interacting dynamically with the whole, the new Colburn Center will be built into a terrain that slopes down from Olive Street to Hill Street and clad in a pink metallic finish. The components are knit together by an expansive light-filled entrance and a pair of gardens planted at street and rooftop level.”
To date, gifts to the Colburn School total about $315 million toward its $400 million Building Our Future campaign. The campaign will cover about $335 million in construction costs and $65 million in endowment and operating costs for the Colburn Center and the Colburn School.
The performing arts center is expected to reach substantial completion in early 2027.
On the Building Team:
Owner: The Colburn School
Architect: Gehry Partners
Civil engineer: KPFF
MEP engineer: ARC Engineering
Structural engineer: Magnusson Klemencic Associates
Contractor: McCarthy
Related Stories
| Jul 19, 2013
Reconstruction Sector Construction Firms [2013 Giants 300 Report]
Structure Tone, DPR, Gilbane top Building Design+Construction's 2013 ranking of the largest reconstruction contractor and construction management firms in the U.S.
| Jul 19, 2013
Reconstruction Sector Engineering Firms [2013 Giants 300 Report]
URS, STV, Wiss Janney Elstner top Building Design+Construction's 2013 ranking of the largest reconstruction engineering and engineering/architecture firms in the U.S.
| Jul 19, 2013
Reconstruction Sector Architecture Firms [2013 Giants 300 Report]
Stantec, HOK, HDR top Building Design+Construction's 2013 ranking of the largest reconstruction architecture and architecture/engineering firms in the U.S.
| Jul 19, 2013
Renovation, adaptive reuse stay strong, providing fertile ground for growth [2013 Giants 300 Report]
Increasingly, owners recognize that existing buildings represent a considerable resource in embodied energy, which can often be leveraged for lower front-end costs and a faster turnaround than new construction.
| Jul 19, 2013
Best in brick: 7 stunning building façades made with brick [slideshow]
The Brick Industry Association named the winners of its 2013 Brick in Architecture Awards. Here are seven winning projects that caught our eye.
| Jul 18, 2013
LEGO takes on the iconic Sydney Opera House
This September, LEGO will expand its LEGO Creator Expert series with a 2,989-brick model of the iconic Sydney Opera House.
| Jul 18, 2013
Koolhaas plan selected for Miami Beach Convention Center redevelopment [slideshow]
The master plan by OMA's Rem Koolhaas and Shohei Shigematsu beat out a submission by Danish studio Bjarke Ingels Group for the massive redo of the Miami Beach Convention Center.
| Jul 2, 2013
LEED v4 gets green light, will launch this fall
The U.S. Green Building Council membership has voted to adopt LEED v4, the next update to the world’s premier green building rating system.
| Jul 1, 2013
Report: Global construction market to reach $15 trillion by 2025
A new report released today forecasts the volume of construction output will grow by more than 70% to $15 trillion worldwide by 2025.
| Jun 28, 2013
Building owners cite BIM/VDC as 'most exciting trend' in facilities management, says Mortenson report
A recent survey of more than 60 building owners and facility management professionals by Mortenson Construction shows that BIM/VDC is top of mind among owner professionals.