The Colburn School has selected Frank Gehry to join the all-L.A. team for the campus’s downtown Los Angeles expansion.
The project will add three performance venues, an outdoor performance area, classrooms, a dance rehearsal center, and student and guest artist housing. The largest of the new venues will be the 1,100-seat concert hall, the Colburn School’s first venue for full-scale orchestra performances.
A 700-seat flexible studio theater for dance and vocal performance and a 100-seat cabaret-style space are also included. The 700-seat Studio Theater is envisioned as a hybrid courtyard-style theater that will accommodate multiple seating configurations and can serve as a special events space with banquet seating for up to 500. The cabaret-style club space will be used for small-ensemble performances of amplified and non-amplified music.
Courtesy of the Colburn School.
The new expansion will be constructed on a parcel of land between South Olive and Hill Streets and comprise approximately 200,000 sf. The Colburn School Expansion will mark the third building in the immediate area designed by Gehry. The others include the Walt Disney Concert Hall and a mixed-use project he is designing for the Related Companies.
Yosuhisa Toyota of Nagata Acoustics and Michael Ferguson, Principal of TheatreDNA will collaborate with Gehry on the project.
Related Stories
Museums | Sep 29, 2015
Designs unveiled for Warsaw Art Museum and Theatre
Emphasizing the building’s role in the public sphere, the museum will be accessible from all sides.
Performing Arts Centers | Jul 27, 2015
Vox Populi: Netherlands municipality turns to public vote to select design for new theater
UNStudio’s Theatre on the Parade received nearly three-fifths of votes cast in contest between two finalists.
Cultural Facilities | Jul 17, 2015
Rojkind Arquitectos serves up concert hall on the rocks in Mexico
The same way Frank Gehry’s Guggenheim has put Bilbao on the map, architect Michel Rojkind hopes his design will be “an urban detonator capable of inciting modernity in the area.”
Modular Building | Jun 10, 2015
London debuts business complex made from 50 shipping containers
London's newest business complex, Pop Brixton, will support local entrepreneurs, create jobs, and is made entirely of shipping containers.
Building Team Awards | Apr 10, 2015
14 projects that push AEC teaming to the limits
From Lean construction to tri-party IPD to advanced BIM/VDC coordination, these 14 Building Teams demonstrate the power of collaboration in delivering award-winning buildings. These are the 2015 Building Team Award winners.
Building Team Awards | Apr 10, 2015
New arts venue reinvigorates Virginia Tech's campus
The STV-led Building Team creates a world-class performance and arts venue with learning and entrepreneurial dimensions.
Retail Centers | Mar 10, 2015
Retrofit projects give dying malls new purpose
Approximately one-third of the country’s 1,200 enclosed malls are dead or dying. The good news is that a sizable portion of that building stock is being repurposed.
Architects | Feb 27, 2015
5 finalists announced for 2015 Mies van der Rohe Award
Bjarke Ingels' Danish Maritime Museum and the Ravensburg Art Museum by Lederer Ragnarsdóttir Oei are among the five projects vying for the award.
Cultural Facilities | Feb 20, 2015
‘Floating’ park on New York’s Hudson River moves one step closer to reality
The developers envision the 2.4-acre space as a major performance arts venue.
| Jan 17, 2015
When is a train station not a train station? When it’s a performance venue
You can catch a train at Minneapolis’s new Target Field Station. You can also share in an experience. That’s what ‘Open Transit’ is all about.