Jason Freeland, who was recently named to Building Design+Construction’s 40 Under 40 Class of 2012, has been promoted to vice president at Heery International.
In his new position, Freeland serves as the director of Heery’s health facilities design studio in Atlanta. He is responsible for strategic direction, marketing and operations for all of the studio’s health care projects.
Freeland has more than 12 years of experience in designing health care facilities, with a focus on acute care hospitals, ambulatory care centers, and wellness campus master planning. He has worked with a wide variety of clients, ranging from local institutions to large health care management corporations, as well as federal agencies such as the Department of Defense and Department of Veterans Affairs. Some of his recent projects include: lead design architect and planner for a major replacement hospital master plan and concept design in Kaiserslautern, Germany; a master facility plan for a 1.5-million-square-foot wellness campus and acute care hospital in Moreno Valley, California; and design for a 315-bed inpatient tower addition in San Juan, Puerto Rico.
A registered architect in Georgia and Tennessee, Freeland received a bachelor of architecture degree from the University of Kentucky and is currently pursuing an MBA at Emory University’s Goizueta Business School.
He is a member of the American Institute of Architects, a LEED-accredited professional, and a certified member of the American College of Healthcare Architects. BD+C
Related Stories
| Nov 8, 2011
$11 million business incubator Florida Innovation Hub at the University of Florida completed by Charles Perry Partners, Inc.
The facility houses the UF Office of Technology Licensing, UF Tech Connect, other entities, and more than 30 startup technology tenants.
| Nov 8, 2011
Designer joins Holabird & Root
Clifton has been awarded numerous awards throughout her career, including two AIA Chicago Design Excellence Awards.
| Nov 4, 2011
Mortenson Construction builds its fifth wind facility In Illinois
Shady Oaks Wind Farm is under construction near Compton, Ill.
| Nov 4, 2011
CSI and ICC Evaluation Service agree to reference GreenFormat in ICC-ES Environmental Reports?
ICC-ES currently references CSI's MasterFormat and other formats in all of its evaluation reports. The MOU will add GreenFormat references.
| Nov 4, 2011
McCarthy completes construction of South Region High School No. 2 in Los Angeles
Despite rain delays and scope changes, the $96.7 million high school was completed nearly two-months ahead of schedule.
| Nov 4, 2011
Two Thornton Tomasetti projects win NCSEA’s 2011 Excellence in Structural Engineering Awards
Altra Sede Regione Lombardia and Bank of Oklahoma Center both recognized.
| Nov 3, 2011
GREC Architects announces opening of the Westin Abu Dhabi Golf Resort and Spa
The hotel was designed by GREC and an international team of consultants to enhance the offerings of the Abu Dhabi Golf Club without imposing upon the dramatic landscapes of the elite golf course.
| Nov 3, 2011
Hardin Construction tops out Orlando Embassy Suites
The project began in April 2011 and is expected to open in fall 2012.
| Nov 3, 2011
2012 Pritzker Architecture Prize Ceremony to be held in China
The tradition of moving the event to world sites of architectural significance was established to emphasize that the prize is international, the laureates having been chosen from 16 different nations to date.
| Nov 3, 2011
DMR Architects welcomes two new staff members
Siro Gonzalez joins the staff as junior graduate architect and Megan Byers joins the staff as marketing assistant.