flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Funding opportunity for field validation of high-impact building technologies

Codes and Standards

Funding opportunity for field validation of high-impact building technologies

Dept. of Energy program targets dynamic interactions with electric grid.


By Peter Fabris, Contributing Editor | July 9, 2020

Courtesy Pixabay

The U.S. Department of Energy (DOE) is offering up to $10 million for government entities to use for field validation of building technologies.

Five to 10 awards are available for programs that enhance the energy efficiency of buildings and provide flexibility services to the electric grid. Selectees will have the opportunity to validate high-impact building technologies for public and commercial buildings.

Field validation is essential to the R&D process to reveal how new technology integrates with traditional building technologies and interacts with systems that computer models cannot fully simulate, DOE says. Field validation allows DOE to collect and share standardized datasets with researchers, technology providers, industry partners, and other end-users, giving them critical information (e.g., energy use, cost savings, interoperability, durability, maintenance, and other benefits).

Applicants must submit a concept paper no later than Monday, July 27, 2020 to be eligible to submit a full application. Full application responses are due no later than Tuesday, September 28, 2020.

Related Stories

| May 3, 2012

Green-roof requirement now includes industrial facilities in Toronto

A mandate that requires installation of green roofs on new commercial and residential buildings in Toronto has been expanded to include industrial facilities.

| May 3, 2012

Innovative wastewater treatment helps achieve LEED rating

LEED for New Construction, Neighborhood Development and the LEED Volume Program offer some ways to achieve LEED points when dealing with wastewater treatment.

| Apr 26, 2012

Lack of bolts on steel support caused collapse at Cincinnati casino

Too few bolts connecting horizontal steel support beams with vertical steel columns was the cause of January’s construction accident at Horseshoe Casino Cincinnati, according to the report of the Occupational Safety and Health Administration.

| Apr 26, 2012

OSHA criticized for taking too long to roll out safety rules

The Occupational Safety and Health Administration takes far too long to adopt new safety regulations compared to other agencies’ development of rules, safety experts said during a Senate hearing.

| Apr 26, 2012

Contractors fear that GSA scandal will lead to fewer federal construction contracts

In the wake of the recent scandal at the General Services Administration in which workers spent lavishly at a Las Vegas conference, a spokesman for Associated General Contractors of America said contractors are worried the scandal will result in cuts to GSA's construction and renovation budgets.

| Apr 26, 2012

Developers can use LEED wastewater credits to help gain approvals in environmentally sensitive locales

Those wanting to pursue development in heavily regulated and environmentally sensitive areas are benefiting by designing projects that qualify for LEED points, even if the project as a whole does not achieve certification.

| Apr 26, 2012

New York City Council moves to license elevator mechanics

New York’s City Council introduced a measure last week that would require the city’s 7,000 elevator mechanics to meet national standards and be licensed by the city.

| Apr 23, 2012

AAMA releases updated specification for anodized aluminum

AAMA 611-12 describes test procedures and requirements for high performance (Class I) and commercial (Class II) architectural quality aluminum oxide coatings applied to aluminum extrusions and panels for architectural products.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021