GE Energy’s Industrial Solutions business unveiled its new ecomagination-approved WattStation and WattStation Connect.
An electric vehicle (EV) charging station and software platform, the solution allows WattStation owners to manage charging stations remotely, giving them the ability to manage and set customer pricing for EV charging, provide access control at their facilities, generate valuable reports and engage with customers in new ways.
Now available, GE’s WattStation pedestal EV charger is easy to use, customizable and features a retractable cord.
The WattStation Connect full-service software platform helps meet a wide variety of EV needs, whether it is a retailer looking to attract new customers, a commercial property manager in need of information on electricity usage or a fleet owner in search of better cost-allocation data. WattStation Connect provides owners a user-friendly method to manage, monitor and maintain their EV charging ecosystem network.
Industrial Solutions is forming data acquisition agreements with key navigation companies to share information on the installations and availability of WattStations throughout the U.S. and Canada. This enables EV drivers to view and locate GE’s WattStations, obtain directions to the EV charging stations, access pricing details and determine whether a unit is available for charging. In addition to global positioning systems, the GE WattStation Connect data will be available through the Internet, mobile app/device and future in-vehicle systems.
GE Energy’s Industrial Solutions business is working with a well-known online payment company to enable drivers to safely and conveniently pay for charging fees through the WattStation Connect mobile app. The app will be available for download in the coming weeks. EV drivers can use the mobile app to scan the quick response (QR) barcode on the WattStation charger. The QR code will identify the station and the pricing structure for that individual charger. BD+C
Related Stories
| Dec 12, 2011
CRSI design awards deadline extended to December 31
The final deadline is extended until December 31st, with judging shortly thereafter at the World of Concrete.
| Dec 10, 2011
10 Great Solutions
The editors of Building Design+Construction present 10 “Great Solutions” that highlight innovative technology and products that can be used to address some of the many problems Building Teams face in their day-to-day work. Readers are encouraged to submit entries for Great Solutions; if we use yours, you’ll receive a $25 gift certificate. Look for more Great Solutions in 2012 at: www.bdcnetwork.com/greatsolutions/2012.
| Dec 10, 2011
Energy performance starts at the building envelope
Rainscreen system installed at the west building expansion of the University of Arizona’s Meinel Optical Sciences Center in Tucson, with its folded glass wall and copper-paneled, breathable cladding over precast concrete.
| Dec 10, 2011
Turning Balconies Outside In
Operable glass balcony glazing systems provide solution to increase usable space in residential and commercial structures.
| Dec 7, 2011
NSF International qualifies first wallcoverings distributor to the New American National Standard for Sustainable Wallcoverings
TRI-KES demonstrates leadership in environmental stewardship as the first distributor to earn qualification.
| Dec 7, 2011
Autodesk agrees to acquire Horizontal Systems
Acquisition extends and accelerates cloud-based BIM solutions for collaboration, data, and lifecycle management.
| Dec 5, 2011
New York and San Francisco receive World Green Building Council's Government Leadership Awards
USGBC commends two U.S. cities for their innovation in green building leadership.
| Dec 5, 2011
Summit Design+Build begins renovation of Chicago’s Esquire Theatre
The 33,000 square foot building will undergo an extensive structural remodel and core & shell build-out changing the building’s use from a movie theater to a high-end retail center.
| Dec 5, 2011
Fraser Brown MacKenna wins Green Gown Award
Working closely with staff at Queen Mary University of London, MEP Engineers Mott MacDonald, Cost Consultants Burnley Wilson Fish and main contractor Charter Construction, we developed a three-fold solution for the sustainable retrofit of the building.